4.0 Architectural Drawings (Final).PDF

PDF 4 MB Posted

Attached to
LOCHAB Perimeter Wall and Gate House Construction Federal contract opportunity
Solicitation number
19KE5022R0001
Issued by
Department of State

About this file

This solicitation is seeking proposals for a perimeter wall and guard house construction project at the U.S. Embassy in Nairobi, Kenya. The construction effort has an estimated value between $250,000 and $500,000 and must be completed by September 30, 2022. Responding firms must be technically qualified and financially responsible to perform the work, which includes demolitions, excavations, concrete works, construction of retaining walls and structures, and installation of power and lighting systems. Interested firms should request a copy of the solicitation documents from the U.S. Embassy by March 11, 2022 to be considered for this opportunity being awarded by the Department of State. Proposals are due on March 11, 2022. Respondents must meet minimum requirements including necessary personnel, equipment, financial resources, licenses and permits, insurance, and the ability to obtain performance bonds.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED LOCHAB PERIMETER WALL

UPGRADE

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

A

A

B

B

C

C

E

E

F

F

G

G

H

H

I

I

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

.8

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

0.

.6

2.805 3.000

3.000 3.000

3.000 3.000

3.000 3.0000.275

3.000 3.000

3.000 3.000

3.000 3.000

3.0000.275 3.000

3.000 3.000

1.648 1.325

3.000

9.000

0.275

3.000

3.000

3.000

3.000

3.000

3.000

3.000

3.000 0.275

3.000

3.000

3.000

3.000

3.000

3.000

1.

3.

.0

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

3.

20.000 20.000 20.000 20.000 20.000 20.000 20.000

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

20.000 20.000 20.000 20.000 20.000 20.000 20.000

0.

0.

0.

1.

0.

3.

0.

0.250 0.150

4.375 0.250

1.275

0.2001.700

0.1000.900 0.1501.050

0.200

0.

4.

0.

1.

0.

3.000 2.850

1.475 4.575

S-01

S-

S-

S-06

S-07

S-02

S-

S-

S-

S- 09S-10

S-10

S-11

S-11S-

S-

SOUTHERN WALL

SOUTHERN WALL

NORTHERN WALL

W

ES

TE

R

N W

AL

L

EA

ST

ER

N

W

AL

L

E1

E2

E3

E4

E5

E6

E7

E8

E9

E10

E10'

E11

E12

E13

E14

E15

E16

E17

E18

E19

E19'

E20

E21

E22

E23

E24

E25

E26

E27

E28

E29

E30

E31

E32

E33

E34

E35

E36

E37

E38

E38'

E39

E40

E41

E42

E43

E44

E45

E46

E47

E47'

E48

E49

E50

E51

E52

E53

E54

E55

E56

E56'

E57

E58

E59

E61

E60

N38 N37

N36 N35

N34 N33

N32 N31

N30'N30 N29

N28 N27

N26 N25

N24 N23'N23

N22 N21

N20

N19 N18

N17 N16

N15'N15 N14

N13 N12

N11 N10

N9 N8

N7'N7 N6

N5 N4

N3 N2

N1

W61

W60

W59

W58

W57

W56

W55'

W55

W51

W50

W49

W48

W47

W46'

W46

W42

W41

W40

W39

W38

W37'

W37

W33

W32

W31

W30

W29

W28'

W28

W24

W23

W22

W21

W20

W19'

W19

W15

W14

W13

W12

W11

W10'

W10

W18

W17

W16

W6

W5

W4

W3

W2

W9

W8

W7

W27

W26

W25

W36

W35

W34

W45

W44

W43

W54

W53

W52

W1

S1 S2

S3 S4

S5 S6

S7 S8

S9 S10

S11 S12

S13 S14

S15 S16

S8'

S17 S18

S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S29' S30 S31 S32 S33 S34 S35 S36 S37 S38 S39

NORTHERN WALL

NORTHERN WALL

W

ES

TE

R

N W

AL

L

W

ES

TE

R

N W

AL

L

W

ES

TE

R

N W

AL

L

W

ES

TE

R

N W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

SOUTHERN WALL

SOUTHERN WALL

Vehicular gate

Pedestrian gate

1 1:2.15

2 1:2.15

3 1:2.15 01SITE and BOUNDARY WALL LAYOUT

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

B C E F G H I

.0

0.

.0

0.

.0

0.

.6

2.805 3.000

3.000 3.000

3.000 3.000

3.000 3.0000.275

3.000 3.000

3.000 3.000

3.000 3.000

3.0000.275 3.000

3.000 3.000

1.648 1.325

3.000

9.000

0.275 3.000

3.000

3.000

3.000

3.000

3.000

3.000

3.000 0.275

3.000

3.000

3.000

3.000

3.000

3.000

1.

3.

.0

0.

.0

0.

.0

0.

.0

0.

20.000 20.000 20.000 20.000 20.000 20.000 20.000

.0

.0

.0

.0

.0

.0

S-

S-

S-06

S-07

NORTHERN WALL

W

ES

TE

R

N W

AL

L

EA

ST

ER

N

W

AL

L

E30

E31

E32

E33

E34

E35

E36

E37

E38

E38'

E39

E40

E41

E42

E43

E44

E45

E46

E47

E47'

E48

E49

E50

E51

E52

E53

E54

E55

E56

E56'

E57

E58

E59

E61

E60

N38 N37

N36 N35

N34 N33

N32 N31

N30'N30 N29

N28 N27

N26 N25

N24 N23'N23

N22 N21

N20

N19 N18

N17 N16

N15'N15 N14

N13 N12

N11 N10

N9 N8

N7'N7 N6

N5 N4

N3 N2

N1

W61

W60

W59

W58

W57

W56

W55'

W55

W51

W50

W49

W48

W47

W46'

W46

W42

W41

W40

W39

W38

W37'

W37

W33

W32

W31

W30

W29

W28'

W28

W24

W27

W26

W25

W36

W35

W34

W45

W44

W43

W54

W53

W52

NORTHERN WALL

NORTHERN WALL

W

ES

TE

R

N W

AL

L

W

ES

TE

R

N W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

A B C E F G H

.8

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

0.

.0

3.

.0

.0

.0

.0

.0

.0

20.000 20.000 20.000 20.000 20.000 20.000 20.000

0.

0.

0.

1.

0.

3.

0.

0.250 0.150

4.375 0.250

1.275

0.2001.700

0.1000.900 0.1501.050

0.200

0.

4.

0.

1.

0.

3.000 2.850

1.475 4.575

S-01

S-

S-

S-02

S-

S-

S-

S- 09S-10

S-10

S-11

S-11S-

S-

SOUTHERN WALL

SOUTHERN WALL

W

ES

TE

R

N W

AL

L

E1

E2

E3

E4

E5

E6

E7

E8

E9

E10

E10'

E11

E12

E13

E14

E15

E16

E17

E18

E19

E19'

E20

E21

E22

E23

E24

E25

E26

E27

E28

E29

E30

E31

E32

E33

E34

E35

E36

E37

E38

E38'

E39 W33

W32

W31

W30

W29

W28'

W28

W24

W23

W22

W21

W20

W19'

W19

W15

W14

W13

W12

W11

W10'

W10

W18

W17

W16

W6

W5

W4

W3

W2

W9

W8

W7

W27

W26

W25

W1

S1 S2

S3 S4

S5 S6

S7 S8

S9 S10

S11 S12

S13 S14

S15 S16

S8'

S17 S18

S20 S21 S22 S23 S24 S25 S26 S27 S28 S29 S29' S30 S31 S32 S33 S34 S35 S36 S37 S38 S39

W

ES

TE

R

N W

AL

L

W

ES

TE

R

N W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

EA

ST

ER

N

W

AL

L

SOUTHERN WALL

SOUTHERN WALL

Vehicular gate

Pedestrian gate

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

1.

1.

1.

1.

1.

1.

1.850 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

ELEVATION 01

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

LEVEL 10

LEVEL 11

LEVEL 05

S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16S8'

1.

1.

1.

1.

1.

1.

3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

LEVEL 06

LEVEL 07

LEVEL 05

ELEVATION 02

S23 S24 S25 S26 S27 S28 S29 S29' S30 S31 S32 S33 S34 S35 S36 S37 S38 S39

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

LEVEL 10

LEVEL 11

LEVEL 05

ELEVATION 03

W23W22W21W20W19'W19W15W14W13W12W11W10'W10 W18W17W16W6W5W4W3W2 W9W8W7W1

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000

W42W41W40W39W38W37'W37W33W32W31W30W29W28'W28W24W23W22 W27W26W25 W36W35W34 W44W43

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 0.275 3.000 3.000 3.000 3.000 3.000 1.350

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

LEVEL 10

LEVEL 11

W61W60W59W58W57W56W55'W55W51W50W49W48W47W46'W46W42W41W40W39 W45W44W43 W54W53W52

ELEVATION 03

ELEVATION 03

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

LEVEL 01

LEVEL 02

LEVEL 03

LEVEL 04

LEVEL 05

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

LEVEL 10

LEVEL 11

ELEVATION 04

extend of retaining wall extend of retaining wall

E42E43E44E45E46E47E47' E48E49E50E51E52E53E54E55E56E56'

E57E58E59E61 E60

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

extend of retaining wall extend of retaining wall extend of retaining wall

E22E23E24E25E26E27E28E29E30E31E32E33E34E35E36E37E38E38' E39E40E41E42E43E44E45E46

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

LEVEL 01

LEVEL 02

LEVEL 03

LEVEL 04

LEVEL 05

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

LEVEL 10

LEVEL 11

extend of retaining wall

E1E2E3E4E5E6E7E8E9E10E10'E11E12E13E14E15E16E17E18E19E19' E20E21E22E23

ELEVATION 04

ELEVATION 04

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

LEVEL 01

LEVEL 02

LEVEL 03

LEVEL 04

LEVEL 05

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

ELEVATION 06

N38N37N36N35N34N33N32N31N30'N30N29N28N27N26N25N24N23'N23N22N21N20

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

1.

LEVEL 01

LEVEL 02

LEVEL 03

LEVEL 04

LEVEL 05

LEVEL 06

LEVEL 07

LEVEL 08

LEVEL 09

ELEVATION 05 ELEVATION 06

N19N18N17N16N15'N15N14N13N12N11N10N9N8N7'N7N6N5N4N3N2N1

NN

This drawing shall be read in conjunction with the Engineer's drawings. Any descripancies MUST be reported to the Architect.

This drawing must be checked against existing site conditions and any descrepancy reported to the Architect .

Figured dimensions only to be taken from this drawing.

All samples must be approved by the Architect before any use.

All dimensions are in millimeters unless otherwise indicated.

All floors are to have a hydrolic fire hosereels connected to a 6000 litre reserve water tank with automatic booster pumps and 2 9litre CO2 fire extinguishers.

All floors are to have manual electric break glass connected to fire alarm system.

Basement floor is to be served with automatic sprinkler system connected to a 6000 litre reserve water tank with automatic booster pumps.

All circulation areas to have emergency lighting.

1:100, as shown

TI/TH-Lochab/2021 jkk

September 2021

CHECKED :DRAWN :

PROJECT NUMBER REVISION

SIGNED:

CONSULTANTS:

ARCHITECT

DATE:............./................./

NOTES:

DRAWING TITLE

DRAWING NUMBER

DATE:

PROJECT NUMBER REVISION

CIVIL & STR. ENGINEER

QUANTITY SURVEYOR

SCALE:

SIGNED:

CLIENT:

CONSULTANTS:

DATE:............./................./

PROJECT TITLE

J. KINUTHIA

WORKING DRAWINGS A1

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

Project Managers & Quantity Surveyors

Tectura Studio, 2727 The Crescent, Parklands P. O. Box 54634-00200, NAIROBI. KENYA

Tel: 020-3751680; 3751685;3751443 email: info@tectura-int.co.ke

TECTURA INTERNATIONAL LTD

Project Managers & Quantity Surveyors

P.O. Box 2861 - 00100 Nairobi aegis@aegisdevelopment.co.ke www. aegisdevelopment.co.ke

PROJECT MANAGERS

WARNING:

This document is the property of the

United States Government.

Further reproduction and/or distribution is prohibited without the express written approval of:

Facility Management U. S. Embassy Nairobi

P.O Box 606, 00621 Nairobi, Kenya

Email: onealap@state.gov;

sainivk@state.gov

C E

20.000 20.000 20.000

0.

0.

0.

1.

0.

3.

0.

0.250 0.150

4.375 0.250

1.275

0.2001.700

0.1000.900 0.1501.050

0.200

0.

4.

0.

1.

0.

3.000 2.850

1.475 4.575

S-

S-

S-

S- 09S-10

S-10

S-11

S-11S-

S-

S10 S11

S12 S13

S14 S15

S16 S17

S18

S20 S21 S22 S23 S24 S25 S26

SOUTHERN WALL

SOUTHERN WALL

Vehicular gate

Pedestrian gate

2, 2, 185 215 15

1, Powder coated aluminium framed window with fixed glazing panels,side opening and top-hung panels.

PCC coping to details

RC beam to str. eng's details

15mm thick cement/sand plaster with textured paint to architect's specifications.

RC ground beam to str. eng's details

Foundation depth and design to be determined by the structural engineer

Ground level

200mm thick natural stone boundary wall with plaster and paint finish on both sides.

shower tray to specifications.

water closet to specifications.

15mm thick cement/sand plaster with textured paint to architect's specifications.

200mm thick natural stone boundary wall with plaster and paint finish on both sides.

PCC coping to details

Powder coated aluminium framed window (1.8mm aluminium thickness) with fixed security glazing (triple laminated glass to specifications)

Powder coated aluminium framed window (1.8mm aluminium thickness) with fixed glazing (8.23mm thick double laminated glass to specifications)

Mild steel gate to details.

S-08 Building Section 1:25

4 1:2.48

5 1:2.48

S-12 Building Section 1:25

File details come from the government source that posted it. Updated .