Fukuoka - Gardening Contract 2026 Questions Signed.pdf
PDF 320 KB Posted
- Attached to
- Fukuoka Gardening Services Contract
- Solicitation number
- 19JA2526Q0004
- Issued by
-
Department of State
About this file
This is an Amendment to Solicitation for Request for Quotation (RFQ) No. 19JA2526-Q-0004 issued by the U.S. Consulate Fukuoka, Japan on January 22, 2026. The amendment provides clarifications through 16 Questions and Answers addressing contractor inquiries regarding the Fukuoka Gardening Services Contract. The solicitation covers gardening and landscaping services for the U.S. Consulate and Residential grounds, with a total garden area of approximately 600 square meters.
Key requirements clarified in the Q&As include: a minimum Second Grade Zoen Ginoushi License (gardener qualification) is required, with the license holder required to personally perform the gardening work; pool cleaning chemicals (such as chlorine) may be used with prior Contracting Officer's Representative (COR) approval and compliance with U.S. Government safety standards, maintaining minimum pH of 7.2; contractor personnel is limited to seven workers with visitor passes required for temporary work; bicycle parking is available but vehicle parking is not; proposals to enhance grounds appearance are welcome subject to budget and approval; "daily" pool cleaning refers to each working day when the contractor is present three days per week; the COR issues weekly work orders for all contractual tasks; additional work requires submission of scope, action plan, and cost quotation for COR approval; site inspections are permitted only for the awarded contractor with advance COR coordination; the previous 5-year contract total was JPY 18,240,000, though service requirements have changed. The amendment was signed by Contracting Officer Lane Ogawa on January 22, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fukuoka - RFQ Gardening Contract 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO.
A001
3. EFFECTIVE DATE
See Item 16C.
4. REQUISITION/PURCHASE REQ. NO.
MPR0574614/PR15712757
5. PROJECT NO.
6. ISSUED BY CODE 7. ADMINISTERED BY CODE
GSO/Procurement Unit
U.S. Consulate Fukuoka
2-5-26 Ohori, Chuo-ku
Fukuoka, Fukuoka 815-0052
Japan
See Item 6.
8. NAME AND ADDRESS OF CONTRACTOR
9a. AMENDMENT OF SOLICITATION NO.
19JA25-26-Q-0004
9b. DATED (SEE ITEM 11)
January 22, 2026
10a. MODIFICATION OF CONTRACT/ORDER NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ ✓ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ✓ ] is extended, [ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation, or as amended, by one of the following methods:
(a) by completing Items 8 and 15 and returning one copy of the amendment;
(b) by acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE
HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS;
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER:
E. IMPORTANT: Contractor [ ]is not, [ ]is required to sign this document and return one copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to:
1.) Provide the Qs&As. See pages 2 through 5 of the Amendment 0001
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (type or print)
16A. NAME OF CONTRACTING OFFICER
Lane Ogawa
15B. NAME OF CONTRACTOR/OFFEROR
BY
(signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(signature of Contracting Officer)
16C. DATE SIGNED
1/22/2026
Request for Quotation No. 19JA2526-Q-0004
Amendment 0001
United States Consulate Fukuoka, Japan
January 22, 2026
Questions and Answers (Qs&As)
Fukuoka Gardening Services Contract
Question 1:
“Is the first grade Zoen Ginoushi License required or is a third class license acceptable?”
Answer 1: A minimum of Second Grade Zoen Ginoushi License will be accepted.
Question 2:
“Can we put chemicals in the pool/pond?”
Answer 2: Yes, Chlorine or other aquatic control agents may be used to help maintain water quality (minimum pH level of 7.2). However, all chemicals must be approved by the COR in advance and must comply with U.S. Government safety standards.
Question 3:
“Are parking spaces available for contractor personnel?”
Answer 3: No, contractor personnel parking is not available, but we can provide bicycle parking space on compound.
Question 4:
“Are we able to propose flowering options for the U.S. Consulate grounds?”
Answer 4: Yes, proposal to enhance the appearance of the U.S. Consulate and
Residential gardens are welcome. However, implementation will be subject to budget availability and approval.
Question 5:
“In the RFQ, pool cleaning is required daily, but contractors are only required to be present three days a week. Would you be able to clarify this?”
Answer 5: “Daily” refers to each working day when the contractor is present on-site.
Question 6:
“May we(Contractors) have more than one personnel registered to work on the grounds of U.S.
Consulate Fukuoka?”
Answer 6: Yes, multiple personnel may be registered, provided each individual meets the required experience and security clearance requirements.
Question 7:
“With regard to confirming the basic management approach explained during the pre-proposal conference; although various items are described in Section C, is it correct to understand that the
Contracting Officer’s Representative (COR) will issue weekly work instructions, and that the contractor is required to follow those instructions, perform the work on the designated dates in accordance with the specifications, complete it by the required deadlines, and maintain the site in a controlled condition? Any work outside of this scope would be handled through case-by-case coordination. Is this understanding, correct?”
Answer 7: All tasks described in Section C are included in the U.S. Government maintenance system and are issued in the form of work orders. The COR is responsible for maintaining records and ensuring quality control of the gardening services in accordance with this contract. Gardening work orders printed by the COR will be provided to the gardener on a weekly basis for execution.
Question 8:
“Is it correct that the explanation provided during Pre-quotation Conference the basic rules, and that for items not covered therein, the work should proceed based on coordination with the COR on a case-by-case basis?”
Anwer 8: If additional work that is not stated in the contract is required to maintain the
U.S. Consulate and Residential garden areas in good condition, the contractor shall submit the proposed scope of work, an action plan, and a cost quotation to the COR for review and approval.
Question 9:
“Depending on the work, is it acceptable for the number of workers entering the site to increase or decrease? Additionally, is there a limit on the number of access passes that can be issued?”
Answer 9: The number of workers is limited to seven. For temporary or one-day work, contractor personnel may enter the site on any day, provided that a visitor access request has been submitted to the COR and approved by the U.S. Consulate in advance.
Question 10:
“If selected as the contract awardee, would it be possible to conduct an operational-level handover with the current contractor?”
Answer 10: This would be at the discretion of the current contractor. The U.S.
Government is not responsible for providing operational handover instructions; however, an introduction to the current contractor may be arranged.
Question 11:
“Regarding the DESCRIPTION/SPECIFICATION/STATEMENT OF WORK in C.3.4.2, do these apply to the workers who physically perform the work, or to the personnel responsible for supervising and instructing those workers?”
Answer 11: These requirements apply to the worker(s) who physically perform the gardening work.
Question 12:
“Would it be possible to get a garden layout?”
Answer 12: No, a garden layout is not available. However, the total garden area of the
U.S. Consulate is approximately 600 m².
Question 13:
“C.3.4.2 states that the qualification of “Zoen Ginoushi” is required; however, would it be acceptable to substitute this with the qualification of “Zoen Seko Kanri Gishi” or “Doboku Seko
Kanri Gishi”?”
Answer 13: No, “Zoen Seko Kanri Gishi” and “Doboku Seko Kanri Gishi” are not acceptable substitutes.
Question 14:
“Would it be acceptable if at least one person involved in the project holds the required “Zoen
Ginoushi” qualification?”
Answer 14: No, the individual who holds the required Zoen Ginoushi license must personally perform the gardening work.
Question 15:
“Would you be able to provide the amount of the previous bid?”
Answer 15: The grand total of the current 5 year contract is JPY 18,240,000 (base and four option years). However, there have been some changes in the services to be provided under the Request for Quotations (RFQ). Therefore, each quoter shall carefully review all requirements set forth within the RFQ.
Question 16:
“Would it be possible to allow an additional site inspector in order to reconfirm the site conditions?”
Answer 16: Site inspections are permitted only for the awarded contractor. Any such visit shall be coordinated in advance with the COR.
-End of Questions & Answers-