Request for Quotation 19GT5022Q0009 - Exterior Facade Window Cleaning Services.pdf

PDF 1 MB Posted

Attached to
Exterior Façade Window Cleaning services for the new compound for the U. S. Embassy in Guatemala
Solicitation number
19GT5022Q0009
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Embassy of the United States of America

Guatemala, February 15, 2022

To: Prospective Quoters

Subject: Request for Quotation number 19GT5022Q0009 – Exterior Façade Window Cleaning services for the new compound for the U.S. Embassy in Guatemala

Enclosed is a Request for Quotation (RFQ) for Interior Façade Window Cleaning services for the U.S. Embassy in Guatemala. If you would like to submit a quotation, please complete the required portions of the attached documents, and submit your offer to: GuatemalaBids@state.gov

Please use ONLY the address provided above to send your offer, including the name of your company and the solicitation number in the email subject. Offers sent to any other email addresses may not be considered valid.

The U.S. Government intends to award a contract to the responsible company submitting a technically acceptable offer at the lowest price. We intend to award the contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

A site visit will be scheduled for March 2, 2022. Review page No. 40 of the solicitation for additional information.

Due date to submit questions for this solicitation is on March 8, 2022, by 17:00 hours. Submit your questions via email to GaldamezAL@state.gov.

Quotations are due March 22, 2022 by COB 17:00 hours. You will receive an automatic response from the GuatemalaBids@state.gov inbox once your bid has successfully been received. If you do not receive this automatic response, please contact Lorena Galdamez by telephone at (502) 2326-4601, (502) 5205-8011 or by email to GaldamezAL@state.gov.

Email bids should not contain attachments greater than 10MB in size, or they may be refused by the system. Quotation documents should be .pdf, .tif, or .gif files only. Please include the name of your company and the RFQ number in the subject line of your email submittal.

Sincerely, Juan G. Ortiz Contracting Officer mailto:GuatemalaBids@state.gov mailto:GaldamezAL@state.gov mailto:GuatemalaBids@state.gov mailto:GaldamezAL@state.gov

AUTORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)

PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR10386454

PAGE 1 OF 58 PAGES

2. CONTRACT NO. 3. AWARD/ EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

19GT5022Q0009

6. SOLICITATION ISSUE

DATE

02/15/2022

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME Lorena Galdamez

b. TELEPHONE NUMBER(No collect calls) +502 52058011

8. OFFER DUE DATE/

LOCAL TIME

03/22/2022 / 17:00

9. ISSUED BY CODE GT500 10. THIS ACQUISITION IS x UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

EDWOSB EMERGING SMALL BUSINESS

AMERICAN EMBASSY GUATEMALA CITY

Avenida Reforma 7-01, Zona 10, ATTN: GSO - PROCUREMENT

SECTION

Guatemala

GUATEMALA

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS 8 (A) SIZE STANDARD:

13b. RATING11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

14. METHOD OF SOLICITATION

x RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

AMERICAN EMBASSY GUATEMALA CITY

7-01 AVENIDA DE LA REFORMA, ZONE

10, ATTN: GSO

GUATEMALA CITY

GUATEMALA

AMERICAN EMBASSY GUATEMALA CITY

Avenida Reforma 7-01, Zona 10, ATTN: GSO - PROCUREMENT SECTION Guatemala

GUATEMALA

CODE FACILITY

CODE

17a. CONTRACTOR/

OFFERER

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY

AMERICAN EMBASSY GUATEMALA CITY

7-01 AVENIDA DE LA REFORMA, ZONE 10, ATTN: GSO

GUATEMALA CITY

GUATEMALA

CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only) x 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA x ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _ __ COPIES

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _ _______________ OFFER DATED

_ __________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS

TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

NEC Exterior Window Cleaning - See attached x x

ITEM NO. 20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIAL FINAL COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NO. 39. S/R VOUCHER NO. 40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

TABLE OF CONTENTS

Section 1 - The Schedule

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19GT5022Q0009, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19GT5022Q0009, Schedule of Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 – Sample Written Work Plan

• Attachment 2 - Government Furnished Property

Section 2 - Contract Clauses

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part

Section 4 - Evaluation Factors

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12

Section 5 - Representations and Certifications

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER 19GT5022Q0009 - Exterior Façade Window Cleaning

PRICES, BLOCK 23

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF 2010 NOTICE: UNLESS A

WAIVER OR EXCEPTION APPLIES, PAYMENTS SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO

AN EXCISE TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.

1. BACKGROUND AND PURPOSE

The United States Embassy in Guatemala is requiring a preventative maintenance service for exterior façade window cleaning for the new embassy compound (NEC) located at Boulevard Austriaco 11-51 Zone 16.

2. SCOPE OF SERVICES

The Contractor shall provide all necessary mechanical and cleaning personnel, supervision, and cleaning materials to efficiently accomplish the required service. Services will include inspection, planning, and cleaning services to the NEC windows.

The U.S. Embassy – Guatemala will provide the equipment, room lift and scissor lift, for the execution of the required services.

3. TYPE OF CONTRACT

The government intends to award a fixed price contract.

4. TYPES OF SERVICES

The Contractor shall provide window cleaning services as specified in Continuation to SF-1449, Schedule of Supplies/Services, Block 20, Description/Specifications/Work Statement.

Performance may be required outside the normal workday to avoid traffic tie-ups, prepare staged materials or meet other schedule requirements.

5. PRICING

(a) The Government will pay the Contractor a fixed price upon satisfactory completion of the exterior façade window cleaning services.

(b) The Contractor shall include the cost of all equipment, materials, labor (including any premium pay for services required for overtime and holidays), overhead, taxes and profit in the fixed price for cleaning services.

(c) OFFERS AND PAYMENT IN U.S. DOLLARS. U.S. firms are eligible to be paid in U.S. dollars. U.S.

firms desiring to be paid in U.S. dollars should submit their offer in U.S. dollars. A U.S. firm is defined as a company which operates as a corporation incorporated under the laws of a state within the United States.

(d) FOREIGN FIRMS. Any firm, which is not a U.S. firm, is a foreign firm. Any firm that does not meet the above definition of U.S. firm shall submit its prices and receive payment in local currency.

5.1 VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and shall be included on Invoices submitted for payment.

6. PRICES

6.1. BASE YEAR:

Item

Description Frequency Semi-Annual Price

TOTAL

1. Cleaning services of exterior façade window and Canopies

Semi-Annually (2 times a year)

DBA Insurance

VAT (12%)

TOTAL FOR BASE YEAR

6.2. OPTION YEAR 1:

Description Frequency Semi-Annual Price

TOTAL

1. Cleaning services of exterior façade window and Canopies

TOTAL FOR OPTION YEAR 1

6.3. OPTION YEAR 2:

Description Frequency Semi-Annual Price

TOTAL

1. Cleaning services of exterior façade window and Canopies

TOTAL FOR OPTION YEAR 2

6.4. OPTION YEAR 3:

Description Frequency Semi-Annual Price

TOTAL

1. Cleaning services of exterior façade window and Canopies

TOTAL FOR OPTION YEAR 3

6.5. OPTION YEAR 4:

Description Frequency Semi-Annual Price

TOTAL

1. Cleaning services of exterior façade window and Canopies

TOTAL FOR OPTION YEAR 4

6.6. SUMMARY

Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4

TOTAL

CONTINUATION TO SF-1449

RFQ NUMBER 19GT5021Q0009

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. WORK REQUIREMENTS

1.1 General. The Contractor shall provide all personnel, cleaning equipment, materials, managerial, administrative, and direct labor personnel to accomplish the work in this contract.

Contractor employees shall be on site only for contractual duties and not for other purposes.

2. STATEMENT OF WORK (SOW):

I. Contractor Safety & Training Compliance:

A mandatory safety work plan must be provided to the Contracting Officer Representative (COR) by the window cleaning contractor when windows to be cleaned are in areas where workers may utilize suspended equipment or where workers are exposed to falls and other known hazards or when the public may be exposed to overhead equipment operations. The work plan must be provided and approved by the COR prior to all scheduled maintenance activities. Such a plan must include the identification of hazardous areas, drop zones, safety features and areas requiring public protection. A written work plan as described applies to the use of ladders, tower scaffolds, man-lifts or bucket trucks and suspended equipment. Prior to scheduled maintenance, contractor must provide documentation to COR that employee’s/users who use and employ the facade maintenance equipment/systems have been trained to recognize the safety hazards associated with their individual work task during use of the equipment, safe working load limits (capacity), and warning labels, if any.

The safety work plan as described applies to the use of ladders, tower scaffolds, man-lifts or bucket trucks and suspended equipment. The contractor must identify what equipment is being used as well as the recognition of hazardous areas of the jobsite and what procedures will be used to overcome or address these hazards. In addition, the work plan must outline any rescue techniques that may be needed in an emergency. The Contractor’s Safety Plan shall clearly designate the “Competent Person” who is overall responsible for job-site safety. The Competent Person means a person – because of knowledge, skill, training, and experience – who can identify existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees. Required competency areas include but not limited to: Electrical, Fall Protection, Ladders, Rigging, and Scaffolding.

In addition, contractor must provide documentation that all employee’s/users have been trained and comply with the Occupational Safety and Health (OSHA) IWCA Alliance program – specifically the Window Cleaning Field Safety Guide and relevant portions of OSHA 1910 Standards that are applicable to window cleaning services, prior to all scheduled maintenance.

Users must be trained to operate equipment and be able to demonstrate how to rig safely as per the safety regulations. In addition, users must be tied off for fall arrest prior to approaching and remain continuously tied off when working within 6ft of roof edge where parapet height is less than the safety railing (42” tall). Lifelines should be arranged in such a way to ensure that a worker cannot vertically free fall more than 6ft or strike the lower roof level of building. When using any means of suspension, users must be tied off to independent safety anchors. Lines must be always protected from chafing. It is mandatory that all employees comply with all appropriate safety codes and regulations when operating the system. The Contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work and shall be responsible for any action on their part or that of their employees or subcontractors, which results in illness, injury, or death.

Refer to “Job Site Evaluation and Work Plan” for Sample Written Work Plan.

II. Building Maintenance Equipment:

Before authorization is granted for use, all contractor performed work utilizing the suspended maintenance equipment, permanently installed support systems, and/or aerial work platforms shall be reported to the COR to be inputted into logbook. Equipment/systems shall be inspected by the employer/user for visible defects and gross damage before every use and after each occurrence that might affect the integrity of the equipment/system. Any noted Decay to the equipment or its components shall be reported to COR immediately and removed from service.

The equipment must be restored to a like-new condition. Re-certification may be required prior to being returned to service.

Prior to using suspended maintenance equipment or permanently installed support systems, users should verify that maintenance and/or inspection logs indicate that the system has been subjected to the required maintenance and/or inspections. Contractor must verify with COR that all the equipment is functioning as intended, safe, and properly maintained, and the users of the equipment are performing safety checks each time the equipment is being used. Equipment should not be used when wind velocity is above 25mph (40 km/h) at ground level. Equipment should not be used during adverse weather conditions that would expose the operator or the public to any increased safety hazards. Equipment should be at least 10 ft away from high voltage electrical lines. Before using davit arms, all locks and pins must be inspected to ensure they are in place, in good working order, and properly engaged. Prior to the disassembly and relocation of davits, suspension lines must be disengaged from them. All components must be individually tied off where there is a danger of davit components falling from the roof during disassembly and relocation, all components must be individually tied off.

III. Equipment List:

Glass Windows (Estimate Surface Areas):

▪ NOB Exterior Storefront Total = 22,926.63 ft²

▪ NOB Security Windows = 323.51 ft²

▪ NOB Brise Soleil Vertical Glass Fins: Count = 567, Area = 32.94 ft²

▪ NOB Brise Soleil Horizontal Glass Fins: Count = 1,108, Area = 8.84 ft²

▪ SPX Exterior Storefront Total = 1,160 ft²

▪ CCAP Exterior Storefront Total = 1,398.09 ft²

▪ SCAP Exterior Storefront Total = 920.03 ft²

▪ MCAP Exterior Storefront Total = 825.48 ft²

TOTAL 27,595.52 SQF

Canopies:

▪ NOB Consular Entrance Canopy (beams + glass) = 10,774.67 ft²

▪ NOB Main Entrance Canopy (beams + glass) = 5,586.47 ft²

▪ MCAP Canopy (beams) = 828.83 ft²

▪ MSGR Terrace Canopy (beams + deck) = 1,765.28 ft²

▪ MSGR Parking (beams + deck) = 1,003.75 ft²

▪ PKG Consular Entrance Canopy (beams + glass) = 2,637.16 ft²

▪ Fuel Island Canopy (beams + deck) = 523.13 ft²

TOTAL 23,119.29 SQF

IV. PM Schedule:

Equipment ID PM Frequency Instructions Aluminum Façade, Glass/Glazing, Silicone Sealant

Semi- Annually Inspection

Aluminum Façade, Glass/Glazing, Silicone Sealant

Semi- Annually Cleaning

V. Recommended Tools for Maintenance and Cleaning:

1. Soft Grit-Free Cloth, Non-Abrasive Sponge, Squeegee

2. Windex with Ammonia Free

3. Palmolive or Joy Liquid

4. Top Job

5. A soft bristle brush (Used for Cleaning Silicone Sealant Only)

Compatible Cleaners and Detergents for GLASS surfaces ONLY:

• Windex with Ammonia Free

• Palmolive or Joy Liquid

• Top Job

[Top Job and Joy are registered trademarks of Proctor & Gamble, Palmolive is a registered trademark of Colgate Palmolive, Windex is a registered trademark of Drackett Products Company. Only use cleaning products manufactured in the U.S. as formulas manufactured overseas may differ.]

VI. Description of Work:

a) Aluminum Maintenance and Cleaning:

Aluminum façade should be washed twice a year to maintain finish warranty compliance. Both painted and anodized surfaces, exposed to the atmosphere, collect soil and dirt, the amount of which may vary depending on geographic area, environmental conditions, finish, and location on the building. The simplest procedure is to flush the surface with water using moderate pressure to dislodge the soil. If soil is still adhering after drying, then a mild detergent will be necessary.

When mild detergent or mild soap is necessary for removal of soil, it should be used with brushing or sponging. The washing should be done with uniform pressure, cleaning first with a horizontal motion and then with a vertical motion. Always clean coated surfaces down from top to bottom and follow with a thorough rinsing with clean water. Mild soaps or detergents ruled safe for bare hands should be safe for coated aluminum. Stronger detergents should be carefully spot tested and may necessitate rubber gloves, long handled brushes, etc. With any soap or detergent, the finish should be thoroughly rinsed with clean water and dried.

Metal seams, crevices, sills, and any other area that may trap water, cleaner or dirt must be cleaned and thoroughly dried. These "trap" areas must be hand-wiped with absorbent towels or cloths to prevent rundown streaks or "puddling" which will later cause discoloration. Inspect metal surfaces for any discoloration or stains not removed during cleaning operations. Soil or discoloration that are remaining should be manually cleaned in accordance with directions listed above until a satisfactory appearance is achieved. Stubborn surface soils should be scrubbed in a uniform direction using a nylon cleaning pad and cleaner solution. Never use aggressive alkaline or acid cleaners on aluminum finishes. Do not use cleaners containing trisodium phosphate, phosphoric acid, hydrochloric acid, hydrofluoric acid, fluorides, or similar compounds on coated aluminum surfaces. Strong solvents or abrasive cleaners can cause damage to painted surfaces.

Always follow the cleaner manufacturer's recommendations as to the proper cleaner and concentration. Test-clean a small area first. Different cleaners should not be mixed. It is preferable to clean the metal when shaded. Do not attempt to clean hot, sun-heated surfaces since possible chemical reactions on hot metal surfaces will be highly accelerated and non-uniform. Also, avoid cleaning in freezing temperatures or when metal temperatures are sufficiently cold to cause condensation. Surfaces cleaned under these adverse conditions can become so streaked or tainted that they cannot be restored to their original appearance. Apply the cleaning solution only to an area that can be conveniently cleaned without changing position. Thoroughly rinse the surface with clean water before applying cleaner. Minimize cleaner rundown over the lower portions of the building and rinse such areas as soon as practical.

If an aggressive cleaner is required for some other component of the building, care must be taken to prevent the cleaner from contacting the aluminum finish. COR’s approval is required in the event an aggressive cleaner is needed for some other component of the building. Do not use excessive abrasive rubbing to remove stubborn stains. Such procedures can produce an undesirable appearance or adversely affect the finish. Exterior aluminum is maintained and cleaned in strict adherence to North American published guidelines and the Aluminum Finish Vendors recommended instructions. Architectural Aluminum Manufacturers Association (AAMA) document “609 & 610-02 – Cleaning and Maintenance Guide for Architecturally Finished Aluminum” is followed when cleaning exterior and interior aluminum during and after the construction process.

b) Glass Maintenance and Cleaning (Exterior):

Glazing should be cleaned on the same schedule as the aluminum façade. Cleaning should begin at the top of the building and continue to the lower levels to reduce the risk of leaving residue and cleaning solutions on glass at the lower levels. Cleaning procedures should also ensure that the wind is not blowing the cleaning solution and residue onto already cleaned glass.

It is strongly recommended that window washers clean a small area or one window, then stop and examine the surface for any damage to the glass and/or reflective coating. Flush glass surface with clean water to soften and remove as many contaminants as possible. Uniformly apply compatible cleaner to the surface using applicator methods. Remove all liquid from the surface with a microfiber cloth or cotton cloth immediately following the application of the cleaning solutions. Rinse immediately with clean water and remove any excess water from the glass surface with a squeegee.

Care should be taken to ensure that no metal, sand, or foreign particles become trapped between the cloth and the substrate. These particles, if allowed to contact the glass or polycarbonate surface, will mark, and damage the glazing. All cleaning solutions should be dried from the window gaskets and sealants to avoid the potential for deterioration as a result of the cleaning process. Do not apply cleaners in direct sunlight or at elevated temperatures. Do not use razor blades or squeegees to clear hard-to-remove substances. Do not use abrasive or highly alkaline cleaners. Benzene, gasoline, acetone, MEK, and carbon tetra chloride should never be used on polycarbonate surfaces. Assume materials are not compatible unless they have been approved by manufacturer. The use of paper towels is not recommended.

IMPORTANT: Precautions must always be taken to ensure that the area of work is protected during cleaning procedures. There can be no damage to the facility or grounds. If damage is caused by the contractor, it will be the contractor’s responsibility to restore the damaged item(s) or grounds to its original condition. A protective barrier material must be used while moving, transporting and/or using any wheeled device to prevent damage to the roof.

The worksite shall be maintained in a clean manner at the end of each workday. Contractor shall clean and restore jobsite to its original or better condition within two (2) business days after project completion.

During the scheduled preventative maintenance, all animal and insect dwellings discovered on the building facade (i.e., bird nest, wasp nest, etc.) should be immediately reported to the COR for instructions on the proper removal process.

In the event of volcanic eruption, extra care should be taken when cleaning the exterior glass facade. Flush glass surface with clean water to soften and remove volcanic ash. Verify that all ash has been removed before applying cleaner to surfaces.

Stress cracks are also caused by hanging, affixing, or adhering foreign objects to the glazing.

These include fixing tape, plastic decals, and suction devices to the surfaces. Personnel are instructed to remove all foreign objects from glazing immediately to prevent further damage.

Exterior/Interior Glass is cleaned in strict adherence to North American published guidelines and the Glass Fabricator’s recommended instructions. Glass Association of North America (GANA) document “01-0300 – Proper Procedures for Cleaning Architectural Glass Products” is followed when cleaning exterior/interior glass during and after the construction process. The following "Do's" and "Do Not's" are offered as a supplement to the Glass Association of North America (GANA) Glass Informational Bulletin – Proper Procedures for Cleaning Architectural Glass Products: Correctly identify the aluminum finish to be cleaned when selecting an appropriate cleaning method.

The following are things to DO:

- DO clean glass when dirt and residue appear

- DO determine if coated glass surfaces are exposed

- DO exercise special care when cleaning coated glass surfaces

- DO avoid cleaning tinted and coated glass surfaces in direct sunlight

- DO start cleaning at the top of the building and continue to lower levels

- DO soak the glass surface with a clean water and soap solution to loosen dirt and debris

- DO dry all cleaning solution from window gaskets, sealants, and frames

- DO use a squeegee to remove all of the cleaning solution

- DO clean one small window and check to see if procedures have caused any damage

- DO be aware of and follow the glass supplier's specific cleaning recommendations

- DO caution other trades against allowing other materials to contact the glass

- DO watch for and prevent conditions that can damage the glass

- DO read the entire GANA bulletin on glass cleaning before starting to clean glass

The following are things to NOT do:

- DO NOT start cleaning without reading the entire GANA bulletin on glass cleaning

- DO NOT use scrapers of any size or type for cleaning glass

- DO NOT allow dirt and residue to remain on glass for an extended period of time

- DO NOT begin cleaning glass without knowing if a coated surface is exposed

- DO NOT clean tinted or coated glass in direct sunlight

- DO NOT allow water or cleaning residue to remain on the glass or adjacent materials

- DO NOT begin cleaning without rinsing excessive dirt and debris

- DO NOT use abrasive cleaning solutions or materials

- DO NOT allow metal parts of cleaning equipment to contact the glass

- DO NOT trap abrasive particles between the cleaning materials and the glass surface

- DO NOT allow other trades to lean tools or materials against the glass surface

- DO NOT allow splashed materials to dry on the glass surface

c) Silicone Sealant Maintenance and Cleaning:

Cured silicone sealants in weatherproofing joints or remedial repair joints do not require cleaning in order to functionally perform as a weather seal. However, the joints may become dirty, and it is desired by a building owner to clean them for aesthetic reasons. This should be accomplished during the window/façade cleaning twice a year. A mild detergent and water solution will remove any dirt from the sealant. A soft bristle brush can be used to loosen any dirt that did not easily release.

d) Glazing, Façade, Silicone Inspections:

Inspecting the glazing, aluminum façade and silicone should happen at least twice a year during the scheduled cleaning. Glazing should be inspected for chips, cracks, condensation, and hazing. If glazing is deemed damaged, document and notify Contracting Officer Representative (COR). Silicone should be inspected for damage, poor adhesion, and voids in material. If the sealant is damaged, and the bond is intact, document and notify COR. Aluminum façade should be inspected to make sure glazing gaskets are not missing and secure. All exterior window trim should be inspected to make sure they are secure and not lose or rattling. All brise soleil exposed fasteners and all aluminum composite panels should be inspected to make sure they are secure and have not come loose.

e) The Site.

The New Embassy Compound (NEC) is located at Boulevard Austriaco 11-51, Zone 16, Guatemala City, Guatemala.

f) The Equipment.

The U.S. Embassy – Guatemala will provide:

• Genie Boom Lift

• Genie Self Propelled Electric Scissor Lift

g) Personnel

The Contractor shall provide a qualified work force meeting the contract requirements. The workforce shall be able to efficiently provide the services identified in this RFQ. It is anticipated that the Contractor will provide:

• Project Manager

• Deputy Project Manager

• Team Leaders/Supervisors

• Equipment Operator

• Laborers

The Project Manager is considered key personnel and cannot be substituted during the performance of this contract. The Project Manager shall be fluent in the English language.

All Contractor employees shall:

Be courteous at all times;

Arrive promptly at the work site and already in uniform at the scheduled time with all tools and/or materials necessary to properly complete the job;

Present credentials identifying themselves as employees of the company;

Be in good general health and free from communicable diseases;

Refer any unresolvable questions to the Project Manager, who will consult with the COR;

The Contractor’s employees shall not at any time:

smoke in the U.S. Government facility;

arrive at the facility under the influence of drugs or alcohol, or even with alcohol on the breath;

drink alcoholic beverages on the job, even if offered;

engage in prolonged discussion or argument regarding the job;

perform any work not specified in this contract.

The Contractor shall subject its personnel to the Government's approval. Contractor shall provide police check covering criminal and/or subversive activities, that will be submitted to the Regional Security Office for review and clearance to allow access to the site.

The Government reserves the right to deny access to U.S-owned or U.S-operated facilities to any individual.

h) Housekeeping.

The Contractor is responsible for removal of trash and moving debris so that an orderly and safe environment is maintained. During the service performance the contractor shall remove any trash that results from the work being performed.

VII. MANAGEMENT AND SUPERVISION

a) Supervision. The Contractor shall designate a Project Manager who shall be responsible for on-site supervision of the Contractor's workforce at all times. This Project Manager shall be the focal point for the Contractor and shall be the point of contact with U.S. Government personnel. The Project Manager shall have supervision as his or her sole function.

b) The Contractor shall maintain schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services. Contractor personnel shall coordinate break times as needed.

c) The Contractor shall be responsible for quality control.

d) The Contractor shall be responsible for work site safety during the performance of services.

e) When providing services that require an U.S. Government escort, the escort will control the progress of the cleaning services being provided and the personnel shall not do anything without specific approval of the identified escort.

VIII. CONTRACTOR FURNISHED MATERIALS

The Contractor shall provide all cleaning equipment, materials, supplies, and clothing required to perform the services as specified in this contract, except for the materials to clean FEBR and Blast Glass, such materials will be furnished by the Government. Such items include, but are not limited to cloth, sponges, Windex of equivalent, soap, brushes, and any other operational or administrative items required for performance of the duties and requirements of this contract. The Contractor shall maintain sufficient materials and supplies for all Contractor-furnished materials to ensure uninterrupted service during the cleaning.

IX. GOVERNMENT FURNISHED PROPERTY.

The Government does intend to make some equipment available to the Contractor as "Government furnished property (GFP)" for performance under the contract. See Attachment 2 for a list of the items being provided by the USG.”

X. DELIVERY SCHEDULE

The following items shall be delivered under this contract:

Description

Quantity

Delivery Date

Deliver to:

Employee Security Checks

1 10 working days after award COR

Insurance* (DBA, Liability for personal Injury and/or Property Damage)

1 Prior to start performing any services to all personnel to work on-site

CO

XI. INVOICES AND PAYMENT

INVOICE AND PAYMENT PROCESS:

Bill to:

Embajada Americana Avenida Reforma 7-01, Zona 10 Nit 347497-6

INVOICE MUST BE SUBMITTED THROUGH THE PAYMENT PORTAL.

*Access to the portal can be requested at:

https://mygrants.servicenowservices.com/procurement?id=account_request and create an account.

*Please download the Google authenticator application on a smart device, you will use it every time you want to log in the portal.

*If you already have an account, access with your user and password.

https://mygrants.servicenowservices.com/procurement?id=account_request

Before logging into your account, you must enter the 6-digit code that the authenticator will display.

*Attachments shall be legible and in PDF format only.

*The name of the file shall not have more than 40 characters.

*Invoice must include clear and complete description of items and/or services as described in this Purchase Order, including period of service, if applicable.

*Please make sure that the registered email in your account has the capacity to receive notifications.

*All notifications related with the invoice acceptance or any payment notifications, Will be sent to the registered email in your account.

*In chase of specific questions to create your account, you can submit an email to CojocA@state.gov or PerdomoAC@state.gov

INVOICES ARE SUBJECT TO REJECTION IF ANY OF THE PREVIOUS REQUIREMENTS ARE MISSING.

For payment inquiries, please contact the FMO Section by email to GTMDBO@state.gov

Payments will be made only via Electronic Funds Transfer (EFT).

XII. PERSONAL INJURY, PROPERTY LOSS OR DAMAGE (LIABILITY)

The Contractor hereby assumes absolute responsibility and liability for any and all personal injuries or death and/or property damage to include the landscaping or losses suffered due to negligence of the Contractor's personnel in the performance of the services under this contract.

Contractor shall provide a liability insurance policy of a minimum of $1,000,000 or its equivalent in local currency.

XIII. INSURANCE

13.1 AMOUNT OF INSURANCE. The Contractor is required to provide whatever insurance is legally necessary. The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

13.2 GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)

Bodily Injury stated in U.S. Dollars:

Per Occurrence $500,000.00 Cumulative $1,000,000.00 Property Damage state in U.S. Dollars:

Per Occurrence $500,000.00 Cumulative $1,000,000.00

13.3 The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

13.4 For those Contractor employees assigned to this contract who are either United States citizens or direct hire in the United States or its possessions, the Contractor shall provide workers’ compensation insurance in accordance with FAR 52.228-3, or host country nationals that do not have a DOL waiver.

mailto:CojocA@state.gov mailto:PerdomoAC@state.gov mailto:GTMDBO@state.gov

13.5 The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:

any property of the Contractor, its officers, agents, servants, employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.

13.6 The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

13.7 Government as Additional Insured. The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State," as an additional insured with respect to operations performed under this contract.

13.8 Time for Submission of Evidence of Insurance. The Contractor shall provide evidence of the insurance required under this contract within ten (10) days after contract award. The Government may rescind or terminate the contract if the Contractor fails to timely submit insurance certificates identified above.

XIV. LAWS AND REGULATIONS

14.1 Without additional expense to the Government, the Contractor shall comply with all laws, codes, ordinances, and regulations required to perform this work. If there is a conflict between the contract and requirements of local law, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.

14.2 The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, unless they are inconsistent with the requirements of this contract.”

XV. BONDING OF EMPLOYEES

The Government imposes no bonding requirement on this contract. The Contractor shall provide any official bonds required, pay any fees or costs involved or related to equipping of any employees engaged in providing services under this contract, if legally required by the local government or local practice.

XVI. PERMITS

At no cost to the Government, the Contractor shall obtain all permits, licenses, and appointments required for the prosecution of work. The Contractor shall obtain these permits, licenses, and appointments in compliance with applicable host country laws. The Contractor shall provide evidence of possession or status of application for such permits, licenses, and appointments to the Contracting Officer with its proposal.

XVII. PERIOD OF PERFORMANCE

After contract award and submission of acceptable insurance and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of thirty days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall begin.

The contract will be for a one-year period from the date of the contract award, with four (4) one-year options to extend services.

This contract includes work on weekends and possible Holidays. The Contractor shall not be entitled to additional compensation for these times but shall include all costs in the price.

XVIII. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Para Performance Threshold Services.

Performs all New Embassy Compound exterior façade window cleaning set forth in the scope of work.

I. thru XVI.

All required services are performed and no more than one (1) customer complaint is received per month.

Monitoring Performance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

Standard. The performance standard is that the Government receives no more than one (1) customer complaint during the period of performance. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items, if any of the services exceed the standard).

PROCEDURES.

If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact the COR.

The COR will complete appropriate documentation to record the complaint.

If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

The COR will consider complaints as resolved unless notified otherwise by the complainant.

Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the period of performance, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

ATTACHMENT 1

SAMPLE WRITTEN WORK PLAN

ATTACHMENT 2

GOVERNMENT FURNISHED PROPERTY

Genie Electric Scissor Lift

ATTACHMENT 3

PICTURES AND DRAWINGS OF THE WORKSITE

A TEREX BRAND

Standard Features

Chassis

2WD

48V DC drive system

48V solid state battery charger

Industrial foam-filled tires (water based)

Turntable/Lift

24V DC auxiliary power unit

355° non-continuous rotation

48V DC hydraulic power unit

Descent and Tilt Alarm

Dual parallelogram lift linkage

Hour meter

Zero tail swing

Alarm package flashing beacon and travel alarm

Platfonn

6 ft. dual entry platform with side swing gate

AC power cord to platform

Drive enable system

Proportional controls

Hom

Self-leveling platform

Lift Guard™ Contact Alarm

Articulating Z

-Booms

Z

-45/25 DC Series

Z-45/25J DC with jib

Chassis Options

Tow package

Tire Options

Industrial, foam-filled, non-marking tires (water based)

Engine Options {Bi-Energy models only)

13 hp Kubota 2482 Tier 4f, diesel driven alternator

Cold weather kit: cold weather synthetic engine oil, oil pan heater and battery heater

Diesel catalytic scrubber muffler

Lift/Turntable Options

AGM maintenance-free batteries

Battery charge indicator (BCI): standard on Bi-Energy model

Specialty hydraulic oil: choice of cold weather, fire resistant, or biodegradable (11 gal)

Low voltage interrupt with BCI

Low voltage interrupt with BCI: Bi-Energy only

Power inverter, 800W, 120V AC, 60 Hz: DC models only

Hostile environment kit - cylinder bellows, boom wiper seals, lockable platform control box cover

EE rating, DC only 1

Platfonns

3ft. 1 Oin. steel platform

Lift Guard™ Half Mesh panels, 6ft platform4

Lift Guard™ Full Mesh panels, 6ft platform

Platfonn Options

Air line to platform: ¾in. inner diameter

Aircraft protection kit: platform foam padding and padded disable system 2

Aircraft protection kit with swing gate 2

Light package: 2 chassis mounted drive lights, 2 platform mounted work lights

Lockable platform control box cover

Panel cradle package

Platform auxiliary top rail, 6' platform

Fall Arrest Bar: requires 6ft platform

1 Not available with AGM battery, lights package, power inverter or flashing beacon options 2 Derates load capacity to 440 lbs., not available with any other platform options 3 Panel Cradle and Fall Arest bar are not compatible 4 Not available with Fall Arrest Bar

This Price List supersedes all previously published Price Lists. Product specifications and prices are subject to change without notice or obligation. All prices are in U.S. dollars and do not indude freight or taxes. All sales are subject to Terex USA, LLC tem,s and conditions of sale. Products and services listed may be trademarks, service marks, or trade names of Terex Corporation, Terex South Dakota, Inc., and/or their subsidiaries in the USA and other countries. All rights reserved. Terex is a registered trademark of Terex Corporation in the USA and many other countries. Genie is a registered trademark of Terex South Dakota, Inc. in the USA and many other countries. ©2012 Terex Corporation. Updated: 7 _ 1_ 18 www.genielift.com Contact us at: 1-800-536-1810

SECTION 2 - CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (NOV 2021) is incorporated by reference. (see SF-1449, Block 27A)

Instructions for 52.212-5

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—

COMMERCIAL ITEMS. (NOV 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the

Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUNE 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

_X_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (OCT 2018) (41 U.S.C. 2313).

__ (10) [Reserved].

__ (11)

(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).

__ (12) https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_209_6…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .