SF30-19FR6325Q0021-A0001.pdf

PDF 1021 KB Posted

Attached to
Repair of rear facade corniche and gutter in a U. S Government Property located in Paris, France
Solicitation number
19FR6325Q0021
Issued by

About this file

This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for a repair project at the U.S. Embassy in Paris, France. The amendment, effective July 10, 2025, adds specific requirements to Contract Line Item Numbers (CLINs) 0008 and 0009 for a renovation project.

For CLIN 0008 (Gutter refurbishment), the amendment requires the contractor to provide supports to protect new coverings during reinstallation of two exterior air conditioning units, and to remove and reinstall shutter frame base sections for lead installation on window sills. For CLIN 0009 (Masonry work), the contractor must remove exterior mesh anchors from the facade and fill the resulting holes. The solicitation number is 19FR6325Q0021, with the amendment numbered 19FR6325Q0021-A0001, and the contract is being administered by the Contracts Office at the American Embassy in Paris.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION

NO.

19FR6325Q0021-A0001

3. EFFECTIVE DATE

July 10, 2025

4. REQUISITION/PURCHASE REQ. NO.

PR15235415

5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

Contracts Office A-M8, American Embassy, 2 Ave Gabriel, 75008 Paris

8. NAME AND ADDRESS OF CONTRACTOR (NO., street,city,county,State,and ZIP Code)

X

9a. AMENDMENT OF SOLICITATION NO.

19FR6325Q0021

9b. DATED (SEE ITEM 11)

July 2, 2025

10a. MODIFICATION OF CONTRACT/ORDER NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ x ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended until _________(local time) [ X ] is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ____1___ copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ X ] is required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to add requirements to the scope of work in CLIN 0008 and CLIN 0009 as stated on the second page of this document with illustrated pictures.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME OF CONTRACTING OFFICER

CRAIG N DEATRICK

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

NSN 7540-01-152-8070 Standard Form 30 (revised 10/83) Previous edition unusable Prescribed by GSA FAR (48 CFR

Additional requirements to the scope of work :

CLIN 0008 – Gutter refurbishment :

1. The exterior air conditioning units will be removed and reinstalled by an external company appointed by the Embassy. For the reinstallation of the two (2) exterior air conditioning units, the contractor that will bid for this project shall provide supports to protect the new covering.

2. The base sections of the shutter frames are to be removed for the installation of the lead that will cover the window sills, then they shall be reinstalled identically after the gutter has been repaired.

CLIN 0009 – Masonry work securing by pinning :

3. The exterior mesh anchors which hold the nest are to be removed from the facade and the holes are to be filled.

File details come from the government source that posted it. Updated .