This document is a Scope of Work (SOW) for the renovation of three kitchens in Building 1 at the US Embassy property in Boulogne, France, specifically for apartments B112, B232, and B131. The renovation involves comprehensive kitchen remodeling tasks including removing and reinstalling existing cabinets, countertops, and hood, installing new floor covering (60x60 ceramic tiles), ceramic baseboards, a new backsplash, sink, faucet, cabinet doors and handles, and painting walls and ceiling with white acrylic paint.

The project has an estimated duration of 13 weeks, with work to be performed Monday to Friday from 9:00 to 12:00 and 13:00 to 17:00, adhering to US and French safety regulations including EM-385-1-1 and OSHA standards. The contractor must submit detailed drawings and product data for approval, provide a safety and health protection plan, use only the service stairwell, and ensure minimal disruption to property occupants. Specific product specifications are provided for floor tiles, backsplash, sink, faucet, cabinet doors, and handles, with options for equivalent products.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

RENOVATION OF KITCHEN

BUILDING 1 AT BOULOGNE – B112, B232 and B131

1 | P a g e 3

I – General

The US Embassy, Paris-France (USG) requires kitchen renovation at building 1, Boulogne.

Apartment B112, B232 and B131. The works shall be done as per drawings, scope of work, specifications and general contract conditions. This project requires an experienced contractor to execute the works.

The Contractor shall provide all labor, material, tools, equipment, supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.

Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).

For all kind of work, shall be provided a “Safety and health protection plan” or PP SPS – Plan particulier de sécurité et de protection de la santé -

The working hours shall be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday.

During American and French holidays the U.S. Government Property shall be closed. The U.S.

Government Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.

All work shall comply with all applicable French and European building regulations.

All work shall be performed in accordance with:

A. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/ EM_385-1-1.pdf;

B. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level =1&p_part_number=1910;

C. Local French occupational safety and health requirement laws and regulations;

D. When there is a difference with the minimum requirements the more stringent requirement shall be followed.

The contractor shall use only service stairwell and shall clean after each day work the service stairwell

Estimated duration: 13 weeks

2 | P a g e 3

II – Work

The Contractor shall:

- Install floor protection from

- Remove properly the cabinets, baseboards under kitchen cabinets, countertop and store for reuse

- Remove the existing floor covering /baseboards and dispose debris away from

Property

- Remove the hood, and store properly for reuse

- Remove the blue ceramic tiles on walls and dispose debris away from Property

- Repair the walls

- Furnish and install new floor covering after floor preparation, model M2.0 060B / micron 2.0, 60x60 from Imola or equal Note: the thickness of joint shall be 2mm and color selected by COR

- Furnish and install ceramic baseboards on walls not covered with kitchen cabinets, same model of floor ceramic tiles

- Reinstall kitchen cabinets, baseboard under cabinets and countertop

- Remove doors of kitchen cabinets and dispose debris away from Property

- Install floor protection

- Cut the existing countertop in order to install a new sink Note : the thickness shall be polished

- Furnish and install a new backsplash model 62cm high, marbre gris clair from

Silestone or equal Note: the existing outlets shall be recessed in new backlash

- Furnish and install new sink, model Ref. 127.0637.541 Maris MRX 220/120-34-34 from Franke or equal

- Furnish and install a new faucet Ref. 82006899 model Delinia Lily chrome, from Leroy Merlin or equal Note: the contractor shall furnish and install cut off valves under the sink

3 | P a g e 3

- Furnish and install new doors model model Hockley gris from Howdens or equal

- Furnish and install handles model poignee T, copper from Howdens or equal

- Furnish and install new baseboards under kitchen cabinets model Hockley gris from Howdens or equal

- Furnish and install a panel with the same color as the kitchen cabinets doors, on the side of cabinet where is located the fridge

- Prepare and paint ceiling with acrylic white paint

- Prepare and paint walls with acrylic white washable paint

- Prepare and paint doors Note: same color as existing

- Reinstall the hood

- Remove floor protection in kitchen/pantry/storage

- Furnish and install 3 door stops, black rubber and stainless steel

- Furnish and install two thresholds, chrome

- Cut base doors if needed

- Remove floor protection from entrance to kitchen

- Clean