19FR6325Q0015 - Attachment 1 - Scope of Work.pdf
PDF 166 KB Posted
- Solicitation number
- 19FR6325Q0015
- Issued by
-
Department of State US Embassy Paris
About this file
This Scope of Work document details a comprehensive bathroom and toilet renovation project for Apartment B232 at the Boulogne Compounds for the US Embassy in Paris, France. The project requires a contractor to completely demolish and reconstruct the bathroom and toilet, including installing new electrical systems, plumbing, ceramic tiles, fixtures, and accessories from specific manufacturers like Leroy Merlin, GROHE, and Schneider. Critical requirements include recessed wiring, specific tile and fixture types, waterproofing, and adherence to safety standards including EM-385-1-1 and local French occupational safety regulations.
The renovation must be completed within 4 weeks, with work restricted to Monday-Friday between 9:00-12:00 and 13:00-17:00, and the property will remain occupied during construction. The contractor must submit detailed drawings and product data for approval, install all specified materials including a 170x70cm bathtub, washbasins, toilets, mirrors, lighting, electrical outlets, an electric towel dryer, and various bathroom accessories. The project emphasizes minimal disruption to current occupants and strict compliance with safety and building regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30-19FR6325Q0015-A0003.pdf | ||
| SF-30-19FR6325Q0015-A0002.pdf | ||
| SF-30-19FR6325Q0015-A0001.pdf | ||
| 19FR6325Q0015 - Attachment 2 - Drawings.pdf | ||
| 19FR6325Q0015 - RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
RENOVATION OF BATHROOM ANDTOILET IN AN
APARTMENT AT BOULOGNE COMPOUNDS
I – General
The US Embassy, Paris-France requires the renovation in 1 apartment of a bathroom and toilet at Boulogne compound. Apartment B232. The works shall be done as per drawings, scope of work, specifications and general contract conditions.
This project requires an experienced contractor to execute the works.
The Contractor shall provide all labor, material, tools, equipment, daily supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.
Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).
The Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.
The working hours shall be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday.
During American and French holidays, the Property shall be closed.
All work shall be performed in accordance with:
1. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManu als/EM_385-1-1.pdf;
2. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_ level=1&p_part_number=1910;
3. Local French occupational safety and health requirement laws and regulations;
4. When there is a difference with the minimum requirements, the more stringent requirement shall be followed.
For all kind of work, shall be provided a “Safety and health protection plan” or PP SPS – Plan particulier de sécurité et de protection de la santé - All work shall comply with all applicable French and European building regulations.
Important note: prior to any work, the Contractor shall submit, for approval, all detailed drawings and products data requested by Post.
Note: the work shall be completed within 4 weeks http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910
II - Part I: renovation of bathroom
II.1 – Site installation
The Contractor shall:
- Furnish and install all needed floor protection,
- Furnish and install all protection needed to avoid dust dispersion, II.2 - Demolition:
The Contractor shall:
- Prior to the start of the renovation, the company shall furnish and install faucets cut off valves in order to isolate the water supplies to the apartment, including associated works
- Turn off the water supplies (hot/cold waters),
- Disconnect the water supply pipe and drain pipes then remove the existing sink, toilet cabinet, bathtub and all accessories then dispose debris away from U.S. government property,
- Turn off the circuit breaker supplying the whole concerned zone,
- Remove all existing light fixtures and dispose debris away from U.S.
government property,
- Remove all outlets, switches and unnecessary wirings then dispose debris away from U.S. government property,
- Remove all existing flooring tiles and dispose the debris from U.S.
government property,
- Remove the existing baseboards and dispose the debris away from
Property,
- Remove the existing wall tiles and dispose the debris away from Property,
- Demolish the closet and dispose debris away from Property
Note: After each day work, the contactor shall clean and avoid all dust storage on site. Contractor shall complete a waste tracking form (Attachment 5).
Final cleanup of the premises and disposal of the works waste shall be made in accordance with the French laws.
II.3 – Construction:
The contractor shall:
- Sand the main door and the frames then prepare them for painting – color to be defined by COR.
- Furnish and install new wirings for light fixtures, heating system, switches and outlets.
- Furnish and install 9 light fixtures type “EGLO rond D.12cm, Ref: 98793 FUEVA-CW” or equal.
- Connect the light fixtures.
- Furnish and install 3 outlets, 16/20-Amp including wiring “Celiane” from
Legrand or equal
- Furnish and install wirings as needed in order to prepare for the electrical heater and other fixtures’ installation.
- Furnish and install 2 light switches type “Celiane” from Legrand or equal
Note:
All placements shall be verified with the COR prior to installation.
All wirings and outlets should be recessed.
All finishing plates will be selected by Post.
The wirings will be protected by a circuit breaker 10-mA in the electrical panel.
The Contractor shall furnish and install all circuit breakers as needed.
- Furnish and install 2 recessed extraction grille, Ref. 67706842, 80-mm diameter, white from Leroy Merlin or equal.
Note: The actuation of the ventilation of the bathroom must be connected to the main bathrooms switch.
- Resurface the floor, Note: the self-levelling thicknesses must be previously validated by the COR.
- Furnish and install ceramic tiles on the floor, type “Intenso effet pierre gris fame l.75 X L.75, Ref: 82757477” from Leroy Merlin or equal.
- Repair the walls with plaster.
- Furnish and install ceramic tiles on the walls (full Height), type “ Intense effet pierre gris fame l.30 X L.60, Ref: 82757470” from Leroy Merlin or equal.
- Furnish and install, in the outgoing corners, square chrome profiles
- Furnish and install, in the volume of the bathtub and full height, ceramic tiles on the walls, type “Carrelage mur forte blanc l.7,5 X L. 15 cm, Metro ARTENS, Ref:
70723646” from Leroy Merlin or equal.
Note: The Contractor shall submit the color of joints [2-mm thick] for Post’s approval.
- Modify the water supply pipes (copper) for new sink, the bathtub and toilet as needed.
Note: the water supply pipes will be recessed in the walls,
- Furnish and install 2 toilets cabinet type: “Sans bride Lisso, SENSEA, Ref:
82319830” from Leroy Merlin or equal.
- Connect the toilet.
- Furnish and install 1 washbasin in bathroom “Meuble simple vasque l.90 X H.55 X P.52 cm, gris taupe mat, DORIANE, Ref: 82356603” from Leroy Merlin or equal.
Note: The contractor shall furnish and install all additional needed material for the good functioning of the sink
- Furnish and install 1 washbasin/cabinet in toilet, model Hampton
40cmx48cmx22.5cm, grey/white Ref: 82064864 from Leroy Merlin or equal.
the good functioning of the sink
- Furnish and install 2 faucets for the sink type: “Robinet de lavabo Grohe BauEdge 23328000 chrome, S-Size, avec barre de traction, Ref: 23328000” from GROHE or equal.
- Furnish and install 1 mirror/cabinet/LED in bathroom above the washbasin model Aranga Line TW referenced ARA 80/2/TW in 80 cm from Schneider or equal.
- Furnish and install 1 bathtub type “Baignoire rectangulaire L.170 X l.70 cm blanc, Jacob Delafon Ref. E6D211 from Jacob Delafon or equal.
the good functioning of the bathtub
Note: The contractor shall furnish and install an adapted apron. The apron shall be suited to be tiled. And the contractor shall supply and install a trap.
- Furnish and install ceramic tiles on the bathtub’s apron, type “ Intense effet pierre gris fame l.30 X L.60, Ref: 82757470” from Leroy Merlin or equal.
- Furnish and install 1 faucet for the bathtub type: Mitigeur mécanique baignoire chrome brilliant, GROHE Start Clova, Ref: 23 944 000” from GROHE or equal.
- Furnish and install 1 shower heads and it support for the bathtub type
“Pommeau de douche 1 jet, flexible et support, GROHE Vitalio Comfort 100 Ensemble, Ref: 26399000” from GROHE or equal.
- Furnish and install 1 curtain bar type “Tringle de Douche Sans Percage Barre Rideau Douche Extensible, Barre de Pression en Métal | Aluminium », 140-250cm, Ref. 92118263 from Leroy Merlin or equal.
- Furnish and install 1 curtain for the bathtub type “Rideau de douche 180 x
200 cm blanc SENSEA, Ref: 82658759” from Leroy Merlin or equal.
Note: Provide suitable fixing hooks,
- Connect the mirror’s light.
- Connect the bathtub, the sink and faucets.
- Furnish and install a mirror /LED in toilet model Solar 45cmx75cm Ref.
86237843 from Leroy Merlin or equal.
- Connect the mirror’s light,
- Furnish and install (4) bathroom cabinets model Perla Ref. 84770846 from
Leroy Merlin or equal.
- Furnish and install 1 electric heater / towel dryer type “Sèche-serviette électrique ACOVA 500W, H.96,8 X l.50 cm Tweed gris aluminium, Ref:
3060-0020” from ACOVA or equal.
- Connect the heater,
- Furnish and install bathroom accessories:
2 toilet brushs model Easy Ref. 82678276 from Leroy Merlin or equal 2 paper holders Ref. 82000087 from Leroy Merlin or equal 2 extra paper supports Ref 82000091 from Leroy Merlin or equal 1 support for bathtub GROHE, Vitalio Comfort Clova 3 jets Ref 89341321 from Leroy Merlin or equal 2 towel holders model Suite Sensea Ref. 81999994 from Leroy Merlin or equal 2 trash bins 3 liters model chrome Sensea Ref. 70174986 from Leroy Merlin or equal
- Turn on the water supply pipes,
- Turn on the circuit breakers,
- Furnish and install 2 door stops,
- Apply two coats of waterproofing paint on the main door and its frames (both sides),
- Apply two coats of waterproofing paint on the ceiling
Note: color to be selected by post,
- Remove floor protections and dispose debris away from Property,
- Clean.