ATTACHMENT 1 Penetration and Conduit Project - CHANCERY AND RAPHAEL - FINAL (FAC Review 8.1 DT Review 8.1).pdf
PDF 1 MB Posted
- Solicitation number
- 19FR6324Q0055
- Issued by
-
Department of State US Embassy Paris
About this file
This document is a Statement of Work (SOW) detailing the requirements for the installation of conduits and performance of penetrations in two U.S. Government properties located in Paris, France - the Chancery and Raphael buildings. The contractor is expected to provide all necessary labor, materials, and equipment to complete the work, which involves installing various vertical and horizontal penetrations and conduits throughout the buildings. The work must adhere to strict safety requirements and coordinate closely with the Contracting Officer's Representative (COR) and Government Technical Monitors (GTMs). Mock-ups must be approved prior to commencing work, and the contractor is required to provide a detailed work schedule and warranty. The related federal contract opportunity is for the "Penetration and Conduit Deployment in US Mission premises" project, which the U.S. Embassy in Paris plans to solicit on SAM.gov. The contract will be a fixed-price award to the lowest-priced technically acceptable offeror who is a responsible contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30 Amendment- 0001.pdf | ||
| RFQ 19FR6324Q0055 Penetrations Conduit deployment work.pdf | ||
| ATTCHMENT 2 PRICE TABLE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – SOW(scope of work) Wi-Fi deployment in the Chancery and Raphael Building.
2/4 Avenue Gabriel - 75008 Paris and 12 Avenue Raphael – 75016 Paris
Penetration and Conduit Deployment
CHANCERY & RAPHAEL BUILDINGS
Contents
1. General
2. General description and mandatory requirements
3. Details of installation
3.1. Chancery - A Building
3.1.1. Second Basement
3.1.2. First Basement
3.1.3. Ground Floor
3.1.4. Mezzanine Floor
3.1.5. First Floor
3.1.6. Second Floor
3.2. Chancery - B Building
3.2.1. First Basement
3.2.2. Ground Floor
3.2.3. First Floor
3.3. Raphael Building
3.3.1. First Basement
3.3.2. Ground Floor
3.3.3. First Floor
3.3.4. Third Floor
SCOPE OF WORK
Penetrations and Conduit deployment - Chancery and Raphael Buildings
2/4 Avenue Gabriel - 75008 Paris and 12 Avenue Raphael – 75016 Paris
1. General
In its pursuit of asset management and modernization, the U.S. Government is inviting proposals for the installation of conduits and performing penetrations in two of its properties situated in Paris: The
Embassy and Raphael buildings.
The Scope of Work (SOW) detailed herein is designed to articulate the necessary requirements and tasks involved in installing conduits and performing penetrations within the properties. The objective is to ensure enhanced functionality and connectivity within these facilities, facilitating smoother operations and improved occupant experiences.
The service entails multiple stages, as outlined below, and must strictly adhere to the Scope of Work, specifications, and general contract. This project necessitates the engagement of a specialized and experienced contractor.
The contractor is responsible for furnishing all labor, materials, tools, equipment, supervision, and any other necessary items to carry out the work in accordance with the defined scope of work and specifications.
Contractors are strongly encouraged to conduct on-site visits to verify the existing site conditions before developing their proposals. This firsthand assessment is crucial for ensuring accuracy and completeness in the proposal development process.
The Contractor is responsible for verifying all dimensions and site conditions before ordering any materials or commencing any work.
All materials and equipment incorporated into the project shall be new unless otherwise noted. The
Contractor is responsible for transporting and safeguarding all materials and equipment required for the project.
Augusty, 13 2024
Any variations must be priced and approved in writing by the COR before proceeding with the work and all costs associated with subcontracted services shall be borne by and be the complete responsibility of the Contractor under the fixed price of this contract.
The Property must remain occupied during the duration of the works, and it is the responsibility of the contractor to ensure that all necessary measures are taken to minimize disturbances and nuisances to the occupants.
Working hours are set from 9:00 to 12:00 and from 13:00 to 17:00, Monday through Friday. During
American and French holidays, the Property shall be closed to allow for uninterrupted work.
Any loud or noisy work, such as drilling penetrations, must be performed outside of normal working hours.
The installation of conduits and boxes will be done during the week, on working days, and during the opening hours of the Embassy. If necessary and with a request made 48 hours in advance, schedules can be adapted. Any work required outside of these hours must be requested in writing and approved by the
COR.
The following is a list of the U.S. national holidays and the legally observed local holidays for calendar year 2024. Please keep for reference.
DATE DAY OF THE
WEEK
HOLIDAY TYPE
Jan. 1 Monday New Year’s Day American/French
Jan. 15 Monday Martin Luther King Jr’s Birthday American
Feb. 19 Monday Presidents Day American
April 1 Monday Easter Monday French
May 1 Wednesday Labor Day French
May 8 Wednesday Veterans Day French
May 9 Thursday Ascension Day French
May 20 Monday Whit Monday American
May 27 Monday Memorial Day French
June 19 Wednesday Juneteenth American
July 4 Thursday Independence Day American
July 14 Sunday French National Day French
Aug. 15 Thursday Assumption Day French
Sept. 2 Monday Labor Day American
Oct. 14 Monday Columbus Day American
Nov. 1 Friday All Saints’ Day French
Nov. 11 Monday Veterans Day (WWI) American/French
Nov. 28 Thursday Thanksgiving American
Dec. 25 Wednesday Christmas American/French
All work shall be performed in accordance with:
A. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-
1.pdf;
B. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_ number=1910;
C. Local French occupational safety and health requirement laws and regulations.
D. When there is a difference with the minimum requirements the more stringent requirement shall be followed.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910
2. General description and mandatory requirements
This contractor is expected to:
• install wall and slab penetration sleeves in both the Chancery located at 2/4 av. Gabriel Paris
8ème, and the Raphael building situated at 12 avenue Raphael Paris 16ème, as part of the Penetration and Conduit project. The following requirements outline the standards for the work:
The installation work must utilize high-quality, first-class materials and components that match the existing ones.
The Contractor is responsible for providing a written plan in both French and English detailing the proposed means and methods for owner review and approval before commencing the work.
Note: This being an official building of the US Embassy, all materials and fittings used must adhere to a standard consistent with the historic significance and standing of the building. Additionally, there should be an emphasis on conservation when selecting materials and fittings for the installation work.
• Submit either a French Qualibat qualification or provide evidence of relevant experience for the listed properties. This evidence may include a minimum of 5 works and references demonstrating their experience in similar projects, along with photographs of sleeved vertical and horizontal penetrations work. Additionally, the contractor must have a minimum of 5 years of experience in conservation, construction, and core drilling in various materials such as steel-reinforced concrete, masonry, stone, wood panel, upper glass with lower laminate walls, and drywall interior walls. These experiences should be associated with the installation of wall and slab penetration sleeves.
• Ensure that, prior to commencing work, all necessary precautions are taken to create a safe working area. This includes the installation of temporary construction barricades or cone bars.
Given that the works will be conducted in occupied and secured sites, the contractor must take necessary precautions to minimize disruption and ensure the safety of occupants. Furthermore, they must account for the security considerations of the facility's occupants in their planning and daily activities. All coordination must be approved by the COR prior to implementation.
• Take all necessary precautions to prevent damage and/or deterioration to walls, floors, ceilings, fixtures, and fittings during the passage of employees, tools, equipment, and materials through the premises to the work area and within the work area.
Note: Any damage caused by the Contractor is to be rectified at the Contractor’s expense.
Additionally, all work must be coordinated with the COR and GTMs.
• Ensure that the coring and sleeve penetration work shall be performed using a standardized rapid portable shelter designed to limit dust from spreading outside or onto surrounding areas.
Additionally, an aluminum work platform shall be utilized to provide workers with fall protection.
• Ensure daily cleanliness of the site before departure, with all debris promptly removed by the company and not disposed of in on-site garbage cans.
The contractor is responsible for coordinating with the COR and GTMs to ensure that F/A precautions are implemented. When conducting borings requiring water, the contractor must collaborate with the COR and GTMs to determine water access and disposal. Additionally, the contractor must safeguard all equipment and finishes from water and splash and ensure immediate and thorough cleanup after work.
Cleanup of all work areas must be performed and completed at the end of each work period. Before concluding the work, the contractor must remove all waste, tools, equipment, and non-government materials from the site and premises. Furthermore, unsightly materials and debris, such as rags, empty sand/cement bags, garbage, and equipment, must be promptly removed and disposed of
• Provide and install appropriate protective measures on unaffected areas of the premises (e.g., floors, walls, furniture) as approved by the Contracting Officer Representative (COR) before installation. Depending on the premises, SAS-style protection may be required.
• Provide all necessary materials and resources for the execution and completion of the work, including but not limited to sleeves, sealant insulation, insulating foam, fast flex foam, cement, mechanical equipment, personal protective equipment, waste skips or bins, specialist equipment, and labor. Additionally, the Contractor must furnish written proof of liability insurance before commencing any work.
• Furnish written assurance to the Contracting Officer that all subcontractors and workers involved in the project possess the necessary licenses and permits.
• provide a written warranty agreeing to repair or replace any defective installation and workmanship that results in cracks, deterioration of materials, or other failures of the installed sleeve materials, joints, mortar, sealants, painting, coatings, and related work on this project. This warranty shall ensure that the work performs as required within the warranty period. The warranty period shall be 10 years from the date of the written final acceptance.
• Include a comprehensive PP SPS – Plan particulier de sécurité et de protection de la santé (Safety and Health Protection Plan) with their proposal, which conforms to the latest version of the
Health, Safety, and Welfare at Work Act. This plan should be well-thought-out and detailed enough to demonstrate that the contractor is proficient in conducting safe and professional operations and has prioritized a culture of safety in their business practices.
• Comply with all OSHA standards relevant to the work being performed. They must also adhere to the requirements of the National Electric Code, all applicable rules and regulations of the
National Fire Protection Association regarding the handling of flammable materials or mixtures, and any state or local health and safety requirements, whichever is more stringent.
Before commencing site work, the Contractor must submit a health and safety plan to the SHEM inspector and the COR. This plan should address all applicable OSHA requirements for the project's duration. Throughout the project, the Contractor must follow the procedures outlined in the health and safety plan to ensure the protection of the health and safety of all individuals and property near the project site. The Contractor must always keep a copy of the health and safety plan on-site and ensure that all on-site personnel have reviewed and are familiar with it.
Furthermore, all safety equipment referenced in the health and safety plan must be present on-site and calibrated (if applicable) before any activities commence.
• Must adhere to the following work coordination requirements:
➢ All work must be carried out in coordination with the Contracting Officer's Representative
(COR), and the Diplomatic Technology (DT) and Facility Management (FAC) Government
Technical Monitors (GTMs) at the specified locations.
➢ The Contracting Officers Representative will oversee day-to-day coordination, escort arrangements, material staging and deliveries, scheduling, and provide technical oversight and guidance.
➢ The DT GTM and the FAC GTM will assist with contractor access and provide minor technical oversight and guidance.
➢ For substantive technical clarification on the scope of work, technical guidance, or questions, the COR should be consulted. The COR will coordinate with the DT and FAC
GTMs as appropriate.
➢ Any official changes or financial commitments must be authorized by the Contracting
Officer (CO). No financial or major substantive changes to the scope of work can occur without written direction from the government procurement office and the CO.
➢ Prior to penetration drilling, the contractor must confirm the exact location on both sides of the wall/slab with the COR, in consultation with the GTMs.
➢ Mock-ups of one vertical and one horizontal sleeved penetration must be installed by the contractor for review and approval by the COR and GTMs before commencing work.
• Provide a resource-loaded work schedule that clearly delineates the sequence of work, along with the associated resources and timeframes for each task.
Moreover, if deemed necessary, the contractor should be prepared to deploy two or more teams based on the progress and accessibility of specific work areas. This adaptive approach ensures efficient progress and timely completion of the project.
• adhere to the detailed drawing provided for floor and wall tile penetrations.
Note: Conduits in vertical penetrations must extend 1.8 meters from floor to ceiling and be equipped with a junction box. For ducts extending from the ceiling to the floor, the junction box must be positioned 1.8 meters from the floor. Please refer to the attached diagram for clarification.
The joints between the conduit and the floors or walls must be filled with plaster to ensure fire resistance.
The EMT conduits must be of the electromagnetic tubing type, and a technical data sheet must be submitted to the project COR for validation of the .
• Submit identification information for all employees meant to work on site to the COR to be placed on the approved Visitors Roster. Details should include full name, date of birth, place of birth, and vehicle make, model, and registration number.
sheath
EMT Conduct EMT Conduct
• Fill the gaps between sleeves and walls/slabs with appropriate grouting/caulking. Sleeves at firewalls or slabs must use fire-caulking or appropriate grout.
• Conduct a deep cleaning of the surrounding areas and restore as needed. This may involve various tasks such as masonry work, and painting.
3. Details of installation
3.1. Chancery - A Building
3.1.1. Second Basement
The contractor shall:
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a 2” vertical penetration from the shop office into Chancery First Basement Side-A – TR
A2A, terminating the penetration at the new junction box as indicated in the plan.
• Provide a new one-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install a 1” EMT conduit from the new junction box to AP01 location in shop office, terminating the conduit in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install a 1” EMT conduit from the new junction box in shop office to the new junction box in the shop aera as indicated in the plan.
➢ Install a 1” EMT conduit from the new junction box to AP02 in the supply office, terminating the conduit in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install a 1” EMT conduit from the new junction box to AP03 in the supply office, terminating the conduit in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
3.1.2. First Basement
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a new 2” vertical penetration with conduit from the loading area to the janitor’s closet on the Ground Floor, terminating at the new junction box as indicated in the plan.
➢ Install a new 2” vertical penetration from room A11 to TR G5 on the Ground Floor as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration starting from the DT office room A2 and extending into the hallway outside room A8 as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 1” penetration from the PBX RM A2D into room A2 as indicated in the plan.
• Provide a new two-inch EMT conduit and 1-1/2” penetration for the designated location as specified in the attached plan.
➢ Install a new 1” EMT conduit from the new 2” conduit run into room A16A through the new 1-
1/2” penetration, terminating the conduit in the drop ceiling with a box connector and bushing as indicated in the plan.
➢ Install a new 1” EMT conduit from the new 2” conduit run into room A16B through the new 1-
1/2” penetration, terminating the conduit in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install a new 1” EMT conduit from the room A22 junction box into room A21 through the new 1-
1/2” penetration and terminate it in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install new 1” EMT box from the room A22 junction box into room A23 through the new 1-1/2” penetration and terminate it in a 4-11/16”x4-11/16” outlet box as indicated in the plan.
➢ Install new EMT conduit from the new 2” conduit run into room A23A through the new 1-1/2” penetration and terminate it in a 4-11/16”x4-11/16” outlet box as indicated in the plan.
➢ Install new 1” EMT conduit from the new 2” conduit run into A3A through the new 1-1/2” penetration and terminate it in a 4-11/16”x4-11/16” outlet box as indicated in the plan.
➢ Install new 1” EMT conduit from the new 2” conduit run into room A4 through the new 1-1/2” penetration and terminate it in a 4-11/16”x4-11/16” outlet box as indicated in the plan.
• Provide a new two-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install new 2” EMT conduit from the vertical penetration in the loading area to TR A2A as indicated in the plan.
➢ Install new 2” EMT conduit from the new 2” conduit run into room A22 and terminate it in a new junction box as indicated in the plan.
➢ Install new 2” EMT conduit from outside room A2 to the new vertical penetration in A11 to TR
G5 as indicated in the plan.
➢ Install new (2) 2” EMT conduits from the new junction box in the hallway outside TR A2A into TR
A2A as indicated in the plan.
3.1.3. Ground Floor
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install new 2” sleeved vertical penetration from the janitor’s closet on the ground floor junction box into the junction box on the first basement near the loading area as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install new 2” sleeved penetration from room 15A to room 15B as indicated on the map.
➢ Install new 2” sleeved penetration from room A18 to room 15A as indicated on the map.
➢ Install new 2” sleeved penetration from room A18 to room A16A as indicated on the map.
➢ Install new 2” sleeved penetration from room A18 to room A17 as indicated on the map.
➢ Install a new 2” sleeved penetration from room A18 into the bottom wall of A20 as indicated on the map.
➢ Install a new 2” sleeved penetration from room A18 into the top wall of A20 as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway next to the stairwell into the hallway outside the elevator and room 14B as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway outside room 14B into room 14B as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway outside the janitor’s closet into the janitor’s closet. This will be conduit from a junction box stubbed into the hallway, terminated with a box connector and bushing as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway outside room 10 into room 10 as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway outside room 11 into room 11 as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway outside the entrance into room 8 into the short hallway entering room 8 as indicated on the map.
➢ Install new 2” sleeved penetration from the hallway between room 13A and 4C into the hallway named corridor as indicated on the map.
➢ Install a new 2” sleeved penetration from the hallway outside 4C into room 4C as indicated on the map.
➢ Install a new 2” sleeved penetration from room 4C into TR (G3) positioned between room
4C and room 4 as indicated on the map.
• Provide one-inch sleeved penetrations for the designated location as specified in the attached plan.
➢ Install a new 1” sleeved penetration in the short hallway within room 8, passing through the short wall into room 8d as indicated on the map.
3.1.4. Mezzanine Floor
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a new 2” vertical penetration from the janitor’ s closet on the ground floor side A junction box into the janitor’ s closet on the Mezzanine, terminating in the junction box as indicated in the plan.
➢ Install a new 2” vertical penetration from the new junction box in the mezzanine janitor’ s closet to the janitor’ s closet on the First-Floor side A, terminating in the new junction box as indicated in the plan.
➢ Install a new 2” vertical penetration from TR M27 down to the ceiling of Ground Floor side
A A18 as indicated in the plan.
• Provide a new two-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install a new 2” conduit extending from the junction box in the mezzanine janitor’ s closet into the hallway, terminating with a box connector and bushing as indicated in the plan.
• Provide a two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install new 2” sleeved penetration from the hallway into room M8 as indicated in the plan.
➢ Install new 2” sleeved penetration from TR M5E into room M5 as indicated in the plan.
➢ Install new 2” sleeved penetration from TR M5 into room M5A as indicated in the plan.
➢ Install a new 2” sleeved penetration from TR M5E, terminating with a box connector as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M4 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M12B as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M13 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway in front of the elevator into the hallway in front of the stairwell as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway in front of the elevator into the hallway in front of room M14 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M16 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M19 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M21 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M19 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M24 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M27 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway into room M19 as indicated in the plan.
• Provide one-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install new 2” sleeved penetration from the hallway into M5FA as indicated in the plan.
➢ Install new 2” sleeved penetration from M5FA into M5F as indicated in the plan.
➢ Install new 1” sleeved penetration from the hallway into M6, terminating in a new junction box and provide new 1” stub into the ceiling, terminating with a box connector and bushing as indicated in the plan.
➢ Install new 1” conduit from room M2 to AP location in room M1A and terminate it in a 4-
11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install new 1” sleeved penetration from the hallway into room M14A and install a new junction box with a 1” conduit stubbed into the ceiling as indicated in the plan.
➢ Install new 1” sleeved penetration from room M14A into room M18 as indicated in the plan.
3.1.5. First Floor
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved vertical penetration from the junction box in the janitor’ s closet on the First-Floor side A, terminating in the junction box on the Mezzanine level as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 113B into room 113B as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside the janitor’ s closet into the janitor’s closet as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 112 into room 112.
➢ Install a new 2” sleeved penetration from the hallway outside 110a (TR 110A) into 110a
(TR 110A) as indicated in the plan.
➢ Install a new 2” sleeved penetration from 110a (TR110A) into room 110 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 111 into room 111 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 107 into room 107 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 108 into room 108 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 104 into room 104 as indicated in the plan.
3.1.6. Second Floor
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a new 2” penetration in the janitor’ s closet down to the janitor’ s closet on the first-Floor side A, terminating both ends in the new junction box as indicated in the plan.
• Provide a new two-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install a new 2” EMT conduit extending from the junction box in the janitor’ s closet into the hallway and terminate it with a box connector and bushing as indicated in the plan.
• Provide a new two-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install a new 1” EMT conduit from the hallway to AP location in room 211A and terminate it in a 4-11/16” x 4-11/16” outlet box as indicated in the plan.
➢ Install a new 1” EMT conduit in the hallway 207F as indicated in the plan.
➢ Install a new 1” conduit from the hallway 207F into the room located between 207D and 207 as indicated in the plan.
➢ Install a new 1” EMT conduit from the hallway 207F into room 207C as indicated in the plan.
➢ Install a new 1” EMT conduit from the hallway 207F into room 207A as indicated in the plan.
➢ Install a new 1” EMT conduit from the hallway 207F into room 207B as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from the hallway into TR 213 as indicated in the plan.
• Provide one-inch sleeved penetration for the designated location as specified in the attached
➢ Install a new 1” sleeved penetration from the hallway into room 208 terminate in new junction box with 1” stub-up into ceiling as indicated in the plan.
➢ Install a new 1” sleeved penetration from the hallway into room 216 as indicated in the plan.
➢ Install a new 1” sleeved penetration from the hallway into room 209 as indicated in the plan.
➢ Install a new 1” sleeved penetration from the hallway into room 207C as indicated in the plan.
➢ Install a new 1” sleeved penetration from the hallway into room 203A as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway into room 203 as indicated in the plan.
3.2. Chancery - B Building
3.2.1. First Basement
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved vertical penetration from room BLL28 into TR B02A as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from room BLL28 into BLL28B as indicated in the plan.
➢ Install a new 2” sleeved penetration from room BLL21D into BLL17 as indicated in the
3.2.2. Ground Floor
• Provide a new vertical penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved vertical penetration from room B09 into TR B104 as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from room B15 into room B15B as indicated in the plan.
➢ Install a new 2” sleeved penetration from room B09 into room B13 as indicated in the plan.
➢ Install a new 2” sleeved penetration from room B13 into the hallway kitchen, located to the left of room B13 as indicated in the plan.
3.2.3. First Floor
• Provide a two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 105 into room
105 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 104 into room
104 (right side of the room) as indicated in the plan.
➢ Install a new 2” sleeved penetration from room 104 out to the hallway outside room
104 (left side of the room) as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 102 into room
102 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside (TR B104) into (TR
B104) as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 107 into room
107 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 108 into the hallway leading into the stairwell as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 111 into room
111 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway outside room 108 into the hallway outside 110 (RM110 aera floorplan is not accurate).
3.3. Raphael Building
3.3.1. First Basement
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a 2” vertical penetration from the TR G18 office on the first basement level into the TR on the Ground Floor as indicated in the plan.
➢ Install a 2” vertical penetration from the Gym in Annex A to the Canteen TR in Annex
A as indicated in the plan.
➢ Install a 2” vertical penetration from the First Basement to Annex B TR as indicated in the plan.
• Provide a two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from the room to the right of the PBX into the
PBX as indicated in the plan.
➢ Install new 2” sleeved penetration from room G11 into room G12 as indicated in the plan.
➢ Install new 2” sleeved penetration from room G12 into room G13 as indicated in the plan.
➢ Install new 2” sleeved penetration from room G13 into room G14 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway outside G12 into room G12 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway outside G26 into the hallway leading to the PBX. This installation requires a 8x8x6 box to accommodate the multiple 6-strand fiber being pulled to the PBX as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway outside G26 into room G26 as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway outside G24 into room G24 as indicated in the plan.
➢ Install new 2” sleeved penetration from room G24 into room G23 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the First Basement tunnel into the First
Basement TR G18 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the Electrical room on the right side of the building into the hallway leading to the PBX as indicated in the plan.
• Provide a one-inch EMT conduit for the designated location as specified in the attached plan.
➢ Install a new 1” conduit from the Gym (located in Annex A) into the room right of the
Gym to the location of AP02 on the wall. Mount a 4-11/16” x 4-11/16” dual gang box as indicated in the plan.
➢ Install a new 1” conduit from the existing penetration between the garage and the generator room over to the existing penetration that leads to the hallway going to
PBX as indicated in the plan.
3.3.2. Ground Floor
• Provide a new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a 2” vertical penetration from behind the guard desk in the entrance down to
Electrical room on the First Basement Floor as indicated in the plan.
➢ Install a 2” vertical penetration from the Annex B TR down to the cable tray in the
First Basement as indicated in the plan.
➢ Install a 2” vertical penetration from the Annex A TR down to the Gym in the First
Basement as indicated in the plan.
➢ Install 2” vertical penetration from the Annex A TR up to the wall cabinet in the local
Guard Force Supervisor office as indicated in the plan.
➢ Install a 2” vertical penetration from the Ground Floor TR down to the TR in the First
Basement as indicated in the plan.
• Provide two-inch sleeved penetration for the following location as specified in the attached plan.
➢ Install new 2” sleeved penetration from the Ground floor TR into the hallway as indicated in the plan.
➢ Install new 2” sleeved penetration from the hallway below the Ground TR into room
16 as indicated in the plan.
➢ Install new 2” sleeved penetration from the Ground floor TR into the backside of A/V closet in room 13 as indicated in the plan.
➢ Install new 2” sleeved penetration from the bottom of the wall in room 24 into room
25 as indicated in the plan.
➢ Install new 2” sleeved penetration from the Mail Room into room Annex B TR as indicated in the plan.
• Provide new one-inch EMT conduit for the following location as specified in the attached plan.
➢ Install new 1” conduit from vertical penetration in the entrance up to AP24 location.
Mount a 4-11/16” x 4-11/16” dual gang box as indicated in the plan.
Annex A
Annex B
3.3.3. First Floor
• Provide new two-inch sleeved vertical penetration for the designated location as specified in the attached plan.
➢ Install a 2” vertical penetration from the wall cabinet in the local Guard Force
Supervisor office in Annex A, down to the TR on the Ground Floor in Annex A as indicated in the plan.
• Provide a new two-inch sleeved penetration for the designated location as specified in the attached plan.
➢ Install a new 2” sleeved penetration from the hallway into the room located next to
RM 113 with AP31 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the hallway into the First Floor TR as indicated in the plan.
➢ Install a new 2” sleeved penetration from the Corridor into the First Floor TR as indicated in the plan.
➢ Install a new 2” sleeved penetration from the Corridor into room 113 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the Corridor into room 111 as indicated in the plan.
➢ Install a new 2” sleeved penetration from room 111 into room 105 as indicated in the plan.
➢ Install a new 2” sleeved penetration from the Mail Room into room Annex B TR as indicated in the plan.
• Provide a new one-inch EMT conduit for the following location as specified in the attached plan.
➢ Install a new 1” conduit from the First Floor TR penetration down to the Corridor into room 111 with AP33 as indicated in the plan.
➢ Install a new 1” conduit from room 111 to the penetration between room 111 and room 105 as indicated in the plan.
➢ Install a new 1” conduit from the Corridor into room 113 as indicated in the plan.
Annex A
3.3.4. Third Floor
Provide two-inch sleeved penetrations for the following locations:
• Install a new 2-inch sleeved penetration from room 302 into the room above.
• Install a new 2-inch sleeved penetration from room 328 into the room above room 302.
File details come from the government source that posted it. Updated .