This document outlines a scope of work (SOW) for the renovation of one bathroom in a US government apartment in France. The SOW requires demolition of the existing bathroom fixtures and materials, installation of new plumbing, electrical, fixtures and finishes, including ceramic floor and wall tiles, a bathtub, sink, toilet, lighting and ventilation fixtures, mirrors, cabinets and towel warmers. The contractor must follow all applicable safety and construction standards and submit drawings and product data for approval prior to work. The work must not disturb other apartment occupants and can only occur on weekdays from 9am to 5pm. The related federal contract opportunity provides additional details on the planned solicitation for these bathroom renovation services to be performed at a US Embassy apartment in Paris, France and awarded as a fixed price contract to the lowest priced technically acceptable offeror.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 – SOW (SCOPE OF WORK)

RENOVATION OF ONE BATHROOM TYPE 2 AT

BOULOGNE COMPOUND – B332

March 13, 2024

I – General

The US Embassy, Paris-France requires the renovation of bathroom type 2 at Boulogne Compound Apartment B332. The works shall be done as per drawings, scope of work, specifications and general contract conditions. This project requires an experienced contractor to execute the works.

The Contractor shall provide all labor, material, tools, equipment, daily supervision and other related items required to complete the works as per scope of work, specifications and attached drawings. Contractors are advised to visit the site and verify the existing site conditions to develop their proposal.

Prior to any work, the Contractor shall submit for approval all detailed drawings and products data requested by the Contracting Officer Representative (COR).

The Property shall be occupied during the works and the contractor shall take all necessary measures to avoid disturbances and nuisances to occupants.

The working hours shall be from 9:00 to 12:00 and from 13:00 to 17:00 Monday to Friday.

During American and French holidays, the Property shall be closed.

All work shall be performed in accordance with:

1. The safety requirements of the EM-385-1-1 http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManu als/EM_385-1-1.pdf;

2. The safety requirements within the Occupational Safety and Health Standards https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_ level=1&p_part_number=1910;

3. Local French occupational safety and health requirement laws and regulations;

4. When there is a difference with the minimum requirements, the more stringent requirement shall be followed.

For all kind of work, shall be provided a “Safety and health protection plan” or PP SPS – Plan particulier de sécurité et de protection de la santé - All work shall comply with all applicable French and European building regulations.

Important note: prior to any work, the Contractor shall submit, for approval, all detailed drawings and products data requested by Post.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910 https://www.osha.gov/pls/oshaweb/owastand.display_standard_group?p_toc_level=1&p_part_number=1910

II - Part I: renovation of bathroom type 2

The Contractor shall renovate one (1) bathroom type 2

II.1 – Site installation

The Contractor shall:

- Furnish and install all needed floor protection,

- Furnish and install all protection needed to avoid dust dispersion, II.2 - Demolition:

The Contractor shall:

- Prior to the start of the renovation, the company shall furnish and install faucets cut off valves in order to isolate the water supplies to the apartment, including associated works,

- Turn off the water supplies (hot/cold waters),

- Disconnect the water supply pipe and drain pipes then remove the existing sink, toilet cabinet, bathtub and all accessories then dispose debris away from U.S. government property,

- Turn off the circuit breaker supplying the whole concerned zone,

- Remove all existing light fixtures and dispose debris away from U.S.

government property,

- Remove all outlets, switches and unnecessary wirings then dispose debris away from U.S. government property,

- Remove all existing flooring tiles and dispose the debris from U.S.

government property,

- Remove the existing baseboards and dispose the debris away from

Property,

- Remove the existing wall tiles and dispose the debris away from Property, Note: After each day work, the contactor shall clean and avoid all dust storage on site. Debris shall be disposed appropriately in accordance with French regulations. The Contractor shall provide a destruction certificate.

- Demolish the closet and dispose debris away from Property.

II.3 – Construction:

The contractor shall:

- Sand the main door and the frames then prepare them for painting – color to be defined by COR,

- Furnish and install new wirings for light fixtures, heating system, switches and outlets,

- Furnish and install 6 light fixtures type “EGLO rond D.12cm, Ref: 82186624” from Leroy Merlin OR EQUAL and approved,

- Connect the light fixtures,

- Furnish and install 2 outlets, 16/20-Amp including wiring “Celiane” from

Legrand or equal and approved, as mentioned in the plan below

- Furnish and install wirings as needed in order to prepare for the electrical heater and other fixtures’ installation,

- Furnish and install 1 light switch type “Celiane” from Legrand OR EQUAL and approved, Note:

All placements shall be verified with the COR prior to installation, All wirings and outlets should be recessed, All finishing plates will be selected by Post, The wirings will be protected by a circuit breaker 10-mA in the electrical panel, The Contractor shall furnish and install all circuit breakers as needed,

- Furnish and install 1 recessed extraction grille, Ref. 67706842, 80-mm diameter, white from Castorama OR EQUAL and approved, Note: The actuation of the ventilation of the bathroom must be connected to the main bathrooms switch.

- Resurface the floor, Note: the self-levelling thicknesses must be previously validated by the COR,

- Furnish and install ceramic tiles on the floor, type “Intenso effet pierre gris fame l.75 X L.75, Ref: 82757477” from Leroy Merlin OR EQUAL and approved,

- Repair the walls with plaster,

- Furnish and install ceramic tiles on the walls (full Height), type “Intense effet pierre gris fame l.30 X L.60, Ref: 82757470” from Leroy Merlin OR EQUAL and

- Furnish and install, in the outgoing corners, square chrome profiles

- Furnish and install, in the volume of the bathtub and full height, ceramic tiles on the walls, type “Carrelage mur forte blanc l.7,5 X L. 15 cm, Metro ARTENS, Ref: 70723646” from Leroy Merlin OR EQUAL and approved, Note: The Contractor shall submit the color of joints [2-mm thick] for Post’s approval,

- Modify the water supply pipes (copper) for new sink, the bathtub and toilet as needed, Note: the water supply pipes will be recessed in the walls,

- Furnish and install 1 toilet cabinet type: “Sans bride Lisso, SENSEA, Ref: 82319830” from Leroy Merlin OR EQUAL and approved,

- Connect the toilet,

- Furnish and install 1 washbasin “Meuble simple vasque l.90 X H.45 cm, chene tabac , Soho, Ref: 82356559 from Leroy Merlin OR EQUAL and

Note: The contractor shall furnish and install all additional needed material for the good functioning of the sink

- Furnish and install 1 faucet for the sink type: “Robinet de lavabo Grohe

BauEdge 23328000 chrome, S-Size, avec barre de traction, Ref. 23328000” from Obadis OR EQUAL and approved,

- Furnish and install 1 mirror/cabinet/LED above the washbasin model Aranga

Line TW from Schneider OR EQUAL and approved,

- Furnish and install 1 bathtub type “Baignoire rectangulaire L.170 X l.70 cm blanc, Jacob Delafon Ref. 80137406 from Leroy Merlin OR EQUAL and

Note: The contractor shall furnish and install all additional needed material for the good functioning of the bathtub

Note: The contractor shall furnish and install an adapted apron. The apron shall be suited to be tiled. And the contractor shall supply and install a trap.

- Furnish and install ceramic tiles on the bathtub’s apron, type “Intense effet pierre gris fame l.30 X L.60, Ref. 82757470” from Leroy Merlin OR EQUAL and

- Furnish and install 1 faucet/bar with shower head for the bathtub type:

Euphoria Smart control System 260 mono Ref.26510000 from GROHE OR EQUAL and approved,

- Furnish and install 1 curtain bar for corner bathtub Magic Universal

Ref. 83577396 OR EQUAL and approved, Note: Provide suitable fixing hooks,

- Connect the mirror’s light,

- Connect the bathtub, the sink and faucets,

- Furnish and install 2 bathroom cabinets model Perla Ref. 84770846 from Leroy Merlin OR EQUAL and approved,

- Furnish and install 1 electric heater / towel dryer type “Sèche-serviette électrique ACOVA 500W, H.96,8 X l.50 cm Tweed gris aluminum, Ref. 82730138” from Leroy Merlin OR EQUAL and approved,

- Connect the heater,

- Furnish and install bathroom accessories from Leroy Merlin

1 toilet brush model Easy Ref. 82678276 OR EQUAL and approved 1 paper holder Ref. 82000087 OR EQUAL and approved 1 extra paper support Ref. 82000091 OR EQUAL and approved 1 towel holder model Suite Ref. 8199994 OR EQUAL and approved 1 trash bin 3 liters model Sensea Ref. 701744986 OR EQUAL and approved

- Turn on the water supply pipes,

- Turn on the circuit breakers,

- Furnish and install 1 door stop,

- Apply two coats of waterproofing paint on the main door and its frames (both sides),

- Apply two coats of waterproofing paint on the ceiling, Note: color to be selected by Post,

- Remove floor protections and dispose debris away from Property,

- Clean the site.