19CF2026Q0010_UpdatedSolicitation.pdf
PDF 1 MB Posted
- Solicitation number
- 19CF2026Q0010
- Issued by
-
Department of State
About this file
This is a Request for Quotation (RFQ) for construction services at the U.S. Embassy in Brazzaville, Republic of Congo. The project involves constructing seven concrete caissons (2 feet by 2 feet by 4 feet in depth) to serve as foundations for a cantilevered covered waiting area at the embassy's Consular Section. The work includes layout, excavation, sub-base preparation with compacted gravel, reinforcing steel placement (3/8 inch rebar), concrete placement using M30 grade concrete (minimum 30 MPa compressive strength), curing, protection, and site cleanup. The contractor must complete all work within three consecutive weeks of receiving notice to proceed, with work hours from 7:30 AM to 5:00 PM Monday through Saturday. Quotations are due by May 28, 2026, at 12:00 PM and must be submitted electronically in MS-Word, MS-Excel, or PDF format to brazzavilleprocurement@state.gov.
Contractors must have a minimum of five years' construction experience, provide three professional references, and meet multiple requirements including English language proficiency, established business presence in Congo or plans to establish within 30 days of award, SAM registration, necessary licenses and permits, adequate insurance, and ability to post performance security (50% of contract price). The Government will award to the lowest priced, acceptable, responsible quoter. Required submissions include Standard Form 18 with completed price breakdown, construction schedule in bar chart format, business management/technical proposal, performance and payment bonds or irrevocable letters of credit, and representations and certifications. Liquidated damages of 25,000 Fcfa per day apply for delays. The anticipated contract value is less than $25,000.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE OF PAGESREQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS x IS NOT A SMALL BUSINESS SET-ASIDE 1 62
1. REQUEST NO.
19CF2026Q0010
2. DATE ISSUED
05/18/2026
3. REQUISITION/PURCHASE REQUEST NO.
PR15976551
4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY
AMERICAN EMBASSY BRAZZAVILLE
BLVD DENIS SASSOU NGUESSO 70-83 CENTREVILLE, ATTN: GSO/PROCUREMENT
BRAZZAVILLE
CONGO
6. DELIVER BY (Date) 05/28/2026
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
TELEPHONE NUMBER
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
9. DESTINATION
NAME
Glhane E Chilango
AREA CODE NUMBER
066122012
8. TO:
a. NAME OF CONSIGNEE
AMERICAN EMBASSY BRAZZAVILLE
a. NAME b. COMPANY b. STREET ADDRESS
7 LEON JACOB STREET MPILA, ATTN: GSO/WAREHOUSE
c. STREET ADDRESS c. CITY
BRAZZAVILLE
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
05/28/2026
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%)
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF QUOTATION
16. SIGNERb. STREET ADDRESS
b. TELEPHONE
c. COUNTY
a. NAME (Type or print)
AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) NUMBER
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
U.S. Embassy Brazzaville Date: May 19, 2026
Dear Prospective Offeror:
Subject: Request for Quotes 19CF2026Q00010
Enclosed is a Request for Quotes (RFQ) for the construction of concrete caissons for a cantilevered covered area at the U.S Embassy Brazzaville. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
Quotations are due May 28, 2026, at 12 pm. No quotations will be accepted after this time.
Quotations must be in English and incomplete quotations will not be accepted.
Your quotation must be submitted electronically to brazzavilleprocurement@state.gov . It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-18
2. Section A, Pricing
3. Section L Representations and Certifications
4. Additional information as required in Section J
Sincerely, Michael Armenta Contracting Officer
Enclosure:
mailto:brazzavilleprocurement@state.gov
TABLE OF CONTENTS
SF-18 OR SF-1442 COVER SHEET
A. PRICING
B. STATEMENT OF WORK
C. PACKAGING AND MARKING
D. INSPECTION AND ACCEPTANCE
E. DELIVERIES AND PERFORMANCE
F. CONTRACT ADMINISTRATION DATA
G. SPECIAL TERMS AND CONDITIONS
H. CLAUSES
I. LIST OF ATTACHMENTS
Attachment 1: Standard Form 25, “Performance and Guaranty Bond”
Attachment 2: Standard Form 25A, “Payment Bond” Attachment 3: Sample Letter of Bank Guaranty Attachment 4: Breakdown of Price by Divisions of Specifications Attachment 5: Drawings Attachment 6: Specifications
J. INSTRUCTIONS ON HOW TO SUBMIT A QUOTATION
K. EVALUATION CRITERIA
L. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
SECTION A - PRICING
A. PRICE
The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this purchase order for the following firm fixed price and within the time specified. This price shall include all labor, materials, all insurances, overhead and profit.
Total Price (including all labor, materials, overhead and profit)
A.1 VALUE ADDED TAX
VALUE ADDED TAX (VAT). The Government will not reimburse the Contractor for VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the U.S.
Embassy has a tax exemption certificate with the host government.
SECTION B - STATEMENT OF WORK
The character and scope of the work are set forth in the contract. The Contractor shall furnish and install all materials required by this contract.
In case of differences between small and large-scale drawings, the latter will govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all other portions of the work.
1. 1.0 General
1.1 Introduction
The U.S. Embassy in Brazzaville requires the services of the contractor to construct the concrete caissons for a cantilevered covered area at the U.S Embassy Brazzaville. The work includes layout, excavation, sub-base preparation, reinforcing steel placement, concrete placement, curing, protection, and clean-up, limited to the concrete caissons only, as part of the U.S.
Mission to the Republic of Congo, Embassy Brazzaville. Bids should include all labor, materials, equipment, debris/trash removal, transportation and services for completion of work outlined and shall be in accordance with Local and US Standard construction specifications. All bidders need to possess a minimum of five (5) years’ experience. All bidders must provide three (3) references (telephone numbers of the companies the bidder has done similar jobs in the past five (5) years.
The contractor shall be required to take his own measurements and prepare a bill of materials, quality control schedules, a safety plan and drawings. These documents shall provide the necessary interfaces, coordination, and communication between the Embassy and the contractor.
1.1. Background
1.2. The Consular Section regularly serves a high volume of customers who must wait outdoors before accessing services. Currently, there is no designated covered area to protect visitors from adverse weather conditions, including rain, excessive sun exposure, and other environmental elements. This lack of shelter creates discomfort and inconvenience for customers, particularly during periods of extreme weather. It may also disproportionately affect vulnerable individuals such as the elderly, children, and those with medical conditions. Additionally, prolonged exposure to weather conditions can negatively impact the overall customer experience and perception of service delivery.
The proposed project aims to address this gap by constructing a covered parking and waiting area at the main CAC. The structure will provide adequate protection from weather elements, improve safety and comfort, and support orderly queue management.
By enhancing the physical environment, the project will contribute to more efficient operations and a higher standard of customer service within the Consular Section.
1.3. Scope
1.3.1. The contractor shall prepare a work plan for structural repairs including the driveway platform repairs and finish work. Build an additional pit to supplement the existing undersized structures. Build a concrete slab base for the new skid pump installation. Perform miscellaneous concrete repairs. This schedule must be approved by the Contracting Officer Representative (COR).
1.3.2. The Contractor shall locate and stake out seven (7) caisson locations as indicated on the engineered drawings approved for the project at U.S. Embassy Brazzaville, then excavate for each caisson to achieve a finished concrete size of 2 feet by 2 feet by 4 feet in depth, or as otherwise shown on the engineered drawings. The Contractor shall ensure that the sides of the excavation remain stable and safe, and that the bottom of each excavation is level and suitable for placement of the gravel sub-base.
1.3.3. At the bottom of each caisson excavation, the Contractor shall place a compacted gravel sub-base. The gravel layer must be at least 15 centimeters (approximately 6 inches) thick. The Contractor shall compact the gravel to a firm, stable condition that provides uniform support for the concrete caisson and is acceptable to the COR or designated Engineer. The Contractor shall verify and document the thickness and compaction of the gravel sub-base for each caisson as part of the quality control process. Where required by site conditions or the drawings, the Contractor shall provide and install forms
1.3.4. Work out concrete form tube to achieve the specified 2 foot by 2 foot by 4 foot caisson dimensions. The formwork shall be set true to line and grade and shall be capable of maintaining alignment and shape during concrete placement and curing in the Embassy’s environmental conditions.
1.3.5. The Contractor shall furnish and install all reinforcing steel as indicated on the engineered drawings. The reinforcing shall consist of 3/8 inch (No. 3) rebar for each caisson, placed and tied in accordance with the engineered drawings. The Contractor shall maintain the required concrete cover and spacing of bars using appropriate chairs, spacers, and ties. Rebar placement shall be made available for inspection by the COR or designated Engineer prior to concrete placement. Any discrepancies noted by the COR shall be corrected at the Contractor’s expense before concrete is poured.
1.3.6. The Contractor shall supply concrete of appropriate strength to support the structure. A minimum M30 grade concrete with a compressive strength of 30MPa and 4350 psi must be used. Where local materials or production standards differ, the Contractor shall propose an equivalent mix design for COR approval prior to use.
The Contractor shall place concrete in each caisson in a continuous operation to avoid cold joints and shall consolidate the concrete by vibration (use commercial concrete vibrator) or other approved means to eliminate voids and ensure full encapsulation of the reinforcing steel. The top of each caisson shall be struck off and finished in accordance with the engineered drawings, including required top elevation, surface finish, and installation of any anchor bolts, embedded plates, or hardware that must be set at the time of the pour. The Contractor shall protect the fresh concrete from rain, direct sun, rapid drying, and mechanical damage during the curing period. The Contractor shall ensure that construction activities within the Embassy compound do not damage the caissons during curing, using barricades, signage, or other protective measures as required by the COR.
1.3.7. Upon completion of the concrete work, the Contractor shall remove all excess materials, debris, and formwork from the site and shall leave the work area clean and in an orderly condition, suitable for subsequent construction of the cantilevered covered area. Disposal of waste and surplus materials shall comply with Embassy guidance and local environmental regulations, as directed by the COR. After the concrete is poured the garden area and sidewalk shall look as before the contractor began work. Before and after photos will be added to the record to verify any shortcomings or any extra-needed cleaning required of the contractor.
1.3.8. All work shall conform to the latest approved engineered structural drawings for the cantilevered covered area, applicable U.S. Government design and safety requirements, and local building codes and concrete and reinforcing standards as required by the local authority having jurisdiction. In the event of a conflict between U.S. Government requirements and local codes, the Contractor shall notify the CO/COR and await written direction before proceeding. Any field condition or issue that prevents compliance with the drawings or these requirements shall be promptly reported to the CO/COR for written direction before the Contractor proceeds.
Concrete testing, if required, shall be performed by an independent testing agency approved by the CO/COR, and results shall be provided to the COR for review.
1.3.9. The deliverable under this Statement of Work consists of seven (7) completed concrete caissons, each nominally 2 feet by 2 feet by 4 feet, installed within the U.S.
Embassy Brazzaville compound on a compacted gravel sub-base at least 15 centimeters thick and reinforced with 3/8 inch rebar set in accordance with the engineered drawings. Upon acceptance by the COR, these caissons shall be ready to receive and support the cantilevered covered area structure serving the U.S. Mission to the Republic of Congo.
1.3.10. Finish works as required, including base coat mortar plaster on both sides of the wall and finish paint work. Miscellaneous concrete repairs.
1.3.11. General clean-up of the jobsite.
1.4. Contract Type
1.4.1. The contract type is firm and has a fixed price based on competition. All proposals will be evaluated based on Lowest Priced and technical Acceptability.
1.5. Place of Performance/Hours of Operation
1.5.1. All work will be done onsite at the USG owned property named NEC consular waiting area. Work hours are from 7:30 AM to 5:00 PM Monday through Saturday.
1.6. Period of Performance
1.6.1. Contractor shall commence work under this contract promptly, execute the work diligently, and achieve final completion and acceptance, including final cleanup of the premises for three (3) consecutive weeks. Requests for extended period of performance must be agreed upon in advance by the Contracting Officer. This request for schedule extension will be brought to the Contracting Officer through the COR.
1.7. Security requirement
1.7.1. The work to be performed under this contract requires that the contractor submits the list of employees and sub-contractors for security review by the Embassy. This must be given to the COR. Information submitted by the contractor will not be disclosed beyond the Embassy. The contractor shall submit this information including construction vehicle requirements within 5 business days of the notice to proceed and 10 business days before the work commencement.
1.8. Safety
1.8.1. The contractor is required to meet with the Contracting Officer Representative (COR) for a hazard analysis and review prior to the award of a contract.
1.8.2. The contractor will submit a safety plan to the Contracting Officer (CO) that must be approved by the POSHO or designated alternate such as the APOSHO prior to the award of contract.
1.8.3. The safety plan will include Activity Hazard Analysis (AHA) that covers the hazards related to the work to be performed.
1.8.4. The latest revision of the U.S. Army Corps of Engineering Safety and Health Requirements Manual EM 385-1-1 will be used as the source for minimum standards for health and safety requirements.
1.8.5. The contractor must assure compliance with the following Department Of State Acquisitions Regulation (DOSAR) Accident Prevention clause 652-236-70:
ACCIDENT PREVENTION (APR 2004)
(a) General. The contractor shall provide and maintain work environments and procedures which will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities; avoid interruptions of Government operations and delays in project completion dates; and control costs in the performance of this contract. For these purposes, the contractor shall:
(1) Provide appropriate safety barricades, signs and signal lights:
(2) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and,
(3) Ensure that any additional measures the contracting officer determines to be reasonably necessary for this purpose are taken.
(4) For overseas construction projects, the contracting officer shall specify in writing additional requirements regarding safety if the work involves:
(i) Scaffolding.
(ii) Work at heights above two (2) meters.
(iii) Trenching or other excavation greater than one (1) meter in depth.
(iv) Earth-moving equipment.
(v) Temporary wiring, use of portable electric tools, or other recognized Electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits.
other electrical hazards may also require the use of a GFCI.
(vi) Work in confined spaces (limited exits, potential for oxygen less than
19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.);
(vii) Hazardous materials - a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(viii) Hazardous noise levels.
(b) Records. The contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.
(c) Subcontracts. The contractor shall be responsible for its subcontractor’s compliance with this clause.
(d) Written program. Before commencing work, the contractor shall:
(1) Submit a written plan to the contracting officer for implementing this clause.
The plan shall include specific management or technical procedures for effectively controlling hazards associated with the project; and,
(2) Meet with the contracting officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
(e) Notification. The contracting officer shall notify the contractor of any non-compliance with these requirements and the corrective actions required. This notice, when delivered to the contractor or the contractor’s representative on site, shall be deemed sufficient notice of the non-compliance and corrective action required. After receiving the notice, the contractor shall immediately take corrective action. If the contractor fails or refuses to promptly take corrective action, the contracting officer may issue an order suspending all or part of the work until satisfactory corrective action has been taken. The contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any suspension of work order issued under this clause.
1.8.6. The COR will monitor the contracture to ensure compliance with the safety plan.
1.9. Points of Contact
1.9.1. Contracting Officer (CO): FM/Facility Manager: Michael ARMENTA
1.9.2. Contracting Officer Representative (COR): Facilities Maintenance Manager /
Emmanuel MBEDI
1.9.3. Contracting Officer Technical Representative (COTR): Mechanical Team Lead
/Rufin MAYAMBA
1.10. Quality Control
1.10.1. The contractor must demonstrate technical experience in the construction trade.
Perform work in accordance with applicable standards and specifications as specified in section 2.3.1 of this SOW.
2. Definitions
2.1. Government Furnished Items
2.1.1. None
2.2. Contractor Furnished Items
2.2.1. The contractor shall provide all equipment, materials, tools, personnel and supervision as needed to perform the work and meet the technical requirements in this SOW.
2.3. Applicable Standards
2.3.1. EXAMPLES: American Society for Testing and Materials (ASTM), American
Association of State Highway and Transportation Officials (AASHTO), WA State
Standard Specifications for Road, Bridge, and Municipal Construction etc… are incorporated in these Standard construction specifications for asphalt surfacing Division 40:
http://www.muni.org/Departments/works/project_management/Documents/Division %2040%20-%20Rev%203%20-%20Grey.pdf
3. Status Reporting
3.1. Status reporting will be at the request of the COR or the CTR and could be daily or more frequently. Daily reporting can be verbally unless the report is expressing a cost increase or change in scope. These reports must be in writing in English and before any cost is incurred. All cost increases must be approved in advance by the Contracting Officer(CO).
4. Inspection and Acceptance
4.1. Upon completion of the work, the COR shall inspect the finish work to insure that work was completed in a manner satisfactory to the US Embassy. Any deficiencies in material and workmanship shall be corrected by the contractor at no additional cost to the US Government.
5. Attachments
5.1. Attachment A: (N/A)
5.2. Attachment B: (N/A)
http://www.muni.org/Departments/works/project_management/Documents/Division%2040%20-%20Rev%203%20-%20Grey.pdf http://www.muni.org/Departments/works/project_management/Documents/Division%2040%20-%20Rev%203%20-%20Grey.pdf
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
760-967-8464
MGMT@APMFG.NET
40 FOOT CANTILEVER
DATE: 9/10/24
40 FOOT CANTILEVER SHELTER
40’-0”
.032 THICK # 4 BRUSH
STAINLESS STEEL ROOF SKIN
1 of 6SCALE: 3/8”=1ft
FRONT VIEW
40 FOOT CANTILEVER SHELTER
END VIEW
.035 THICK # 4 BRUSH
STAINLESS STEEL ROOF SKIN
6” SCH. 40 ALUMINUM
PIPE COLUMNS
5” SCH. 40 ALUMINUM 6061 T-6
PIPE BACKBONE
1/8” THICK ALUMINUM
BASE PLATE COVERS
2’-0”
6’-6”
ALUMINUM TUBE FRAME TO SUPPORT
ALUMINUM PERFORATED PANELS WITH
PLANT ON FIGURES
3” X 5” X 1/4” RECTANGLE TUBE 6061 O CONDITION
ROLLED-CAP RECTANGLE TUBE WITH 1/4” END CAPS
1” THICK ALUMINUM
BASE PLATES
CONCRETE PAD LAYOUT
18” THICK
WITH # 6 REBAR 12” ON CENTERS BOTH WAYS
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
760-967-8464
MGMT@APMFG.NET
40 FOOT CANTILEVER
DATE: 9/10/24
SCALE: 3/8”=1ft
2’-0”
ROUND
TYP.
DATE: 4/7/25
QTY 3
#3 TIES @ 3” O.C.
#3 REBAR
TIES
#3 TIES
@ 6” O.C.
QTY 4
#5 DOWELS
W/STD.
HOOK TYP.
NOT TO SCALE:
DATE: 5/22/25
.034” BRUSH FINISH STAINLESS STEEL
TYPE 304
CL
FRONT OF SHELTER
PLAN VIEW
3”X 1/8”
S.S. FLAT BAR
TOP CAPS
1/4”-TEK S.S. SCREWS
WITH RUBBER GASKETS
6’-5”
CUSTOMER NAME:
DRAWN BY: OV
DESCRIPTION:
PLAN VIEW
SCALE: 3/8”=1ft
DWG. NO.:
40’
6’-5”
5’
6’-5”6’-5”
9”9”
5’ 5’ 5’ 5’ 5’5’5’
6’-5” 6’-5”
40 FOOT CANTILEVER
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
760-967-8464
MGMT@APMFG.NET
CUSTOMER NAME:
DRAWN BY: OV
DESCRIPTION:
PLAN VIEW
SCALE: 3/8”=1ft
DWG. NO.:
40 FOOT CANTILEVER
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
760-967-8464
MGMT@APMFG.NET
3”X5” X 1/4” ALUMINUM RECTANGLE TUBE
6061 T0 ROLLED RIBS
CL
6” SCH 40 ALUM
PIPE COLUMNS
78”
40’
78”
5’
78”78” 6”6”
5’ 5’ 5’ 5’ 5’
5” SCH. 40 ALUMINUM
PIPE BACKBONE
5’5’
78” 78”
1/4” 1/4”
1” x 2” alum. rect.
tubes
1/8” typ
1/8” typ
CENTER SPLICE
57"
55 1/2"
57"57"57"57"57"55 1/2" I.D.
0 78” 156” 234” 312” 390” 468”
1 1/2” 58 1/2” 60”
84”
162"
240"
318"
396"
474"
1”X2” X 1/8” ALUMINUM RECTANGLE TUBE
6061 CROSS TUBES
5” SCH. 40 ALUMINUM
PIPE BACKBONE
5.057 lbs/ft @ 101.14 20ft lbs
2”
1/4”
6”
3”
4 3/4” O.D. X 1/4”
WALL ALUMINUM
INSERT
3/4” HOLE FOR
5/8”S.S. CAP BOLT
&LOCK WASHER & NUT
C
3”PLUG WELD
5” SCH. 40 ALUMINUM
PIPE BACKBONE
5.057 lbs/ft @ 101.14 20ft lbs
ROOF SPLICE WITH RIB FOR TWO 20FT SECTIONS TO BE POWDER COATED
1/4”
CL
DETAIL 1
CUSTOMER NAME:
DRAWN BY: OV
DESCRIPTION:
ROOF PLAN VIEW
SCALE: 3/8”=1ft
DWG. NO.:
40 FOOT CANTILEVER
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
A SCALE: ½”=1ft
ROLL TOP 4” x 1/8” STAINLESS
STEEL USE 1/8” PVC RUBBER
GASKET
C
3” x 5” x 1/4” ALUMINUM
RECT TUBE
CUT 10’ FOR ROLLING
SIDE VIEW
WELD ASSEMBLY
ROOF RIB
79 5/8” RADIUS LENGTH
4”
B
1”2”2” 18 15/16”18 15/16”18 15/16”18 15/16”18 15/16”
O 5/16” DIA HOLES
1/4”
5” SCH. 40 ALUM.
PIPE BACKBONE
SCALE: ½”=1ft
SCALE: ½”=1ft
RIB LOCATION
SCALE: 1 ½”=1ft
SCALE: ½”=1ft
6'-6”
6'-6 1/4" + -
7/8”-9 S.S. BOLT
CONNECTION
1” X 7.50” ALUMINUM PLATE
MACHINED ROUND
7.50”
1” HOLES TYP.
5 9/16" O.D.
5” SCH. 40 PIPE
1” X 7.50” ALUM. PLATE
MACHINED ROUND WITH
MACHINED STEP TO RECEIVE PIPE
1/4”
TOP CAP 6” PIPE COLUMNCOUNTERSINK
90DEG FOR
FLAT HEAD
BOLT 1/4”
6” SCH. 40 PIPE WITH
1” X 4” ALUM. PLATE
WITH TWO 7/8”-9 TAPED THREADS
USE LOCTITE BLUE 242 WHEN
CONNECTING BOLTS ARE USED
8”
39"
ROTATE 2 DEG
WELD END CAPS
1/8” X 3” X 5”
BOTH ENDS
1/8”
1/4”
3”X5”X1/4” ALUM. WELDMENT
TO 5” SCH. ALUM. PIPE TO
1/2” X 6” CONNECTION
1/2” THICK ALUM. WATER JET
PLATE 6” X 5”
BEVEL PRIOR
TO WELD
BEVEL PRIOR
TO WELD
BEVEL PRIOR
TO WELD
CL
BEVELQty 14
C
D
6”
PG 14
CUSTOMER NAME:
DRAWN BY: OV
DESCRIPTION:
ROOF PLAN VIEW
SCALE: 3/8”=1ft
DWG. NO.:
40 FOOT CANTILEVER
APMFG FABRICATORS INC.
606 BOARDWALK #B
SAN MARCOS, CA 92078
SECTION C - PACKAGING AND MARKING
Mark materials delivered to the site as follows:
No markings are needed.
SECTION D - INSPECTION AND ACCEPTANCE
The COR, or his/her authorized representatives, will inspect from time to time the services being performed and the supplies furnished to determine whether work is being performed in a satisfactory manner, and that all supplies are of acceptable quality and standards.
The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the Contracting Officer as a result of such inspection.
D.1 SUBSTANTIAL COMPLETION
(a) "Substantial Completion" means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:
(1) do not interfere with the intended occupancy or utilization of the work, and
(2) can be completed or corrected within the time period required for final completion.
(b) The "date of substantial completion" means the date determined by the Contracting Officer or authorized Government representative as of which substantial completion of the work has been achieved.
Use and Possession upon Substantial Completion - The Government shall have the right to take possession of and use the work upon substantial completion. Upon notice by the Contractor that the work is substantially complete (a Request for Substantial Completion) and an inspection by the Contracting Officer or an authorized Government representative (including any required tests), the Contracting Officer shall furnish the Contractor a Certificate of Substantial Completion. The certificate will be accompanied by a Schedule of Defects listing items of work remaining to be performed, completed, or corrected before final completion and acceptance.
Failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government's possession or use upon substantial completion shall not be deemed an acceptance of any work under the contract.
D.2 FINAL COMPLETION AND ACCEPTANCE
D.2.1 "Final completion and acceptance" means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.
D.2.2 The "date of final completion and acceptance" means the date determined by the Contracting Officer when final completion of the work has been achieved, as indicated by written notice to the Contractor.
D.2.3 FINAL INSPECTION AND TESTS. The Contractor shall give the Contracting Officer at least five (5) days advance written notice of the date when the work will be fully completed and ready for final inspection and tests. Final inspection and tests will be started not later than the date specified in the notice unless the Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.
D.2.4 FINAL ACCEPTANCE. If the Contracting Officer is satisfied that the work under the contract is complete (with the exception of continuing obligations), the Contracting Officer shall issue to the Contractor a notice of final acceptance and make final payment upon:
• Satisfactory completion of all required tests,
• A final inspection that all items by the Contracting Officer listed in the Schedule of Defects have been completed or corrected and that the work is finally complete (subject to the discovery of defects after final completion), and
• Submittal by the Contractor of all documents and other items required upon completion of the work, including a final request for payment (Request for Final Acceptance).
SECTION E - DELIVERIES AND PERFORMANCE
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to:
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and,
(c) complete the entire work ready for use not later than 21 days after NTP.
The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay liquidated damages to the Government in the amount of 25,000 Fcfa for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Default clause.
CONTRACTOR'S SUBMISSION OF CONSTRUCTION SCHEDULES
(a) The time for submission of the schedules referenced in FAR 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as 10 calendar days after receipt of an executed contract".
(b) These schedules shall include the time by which shop drawings, product data, samples and other submittals required by the contract will be submitted for approval.
(c) The Contractor shall revise such schedules (1) to account for the actual progress of the work, (2) to reflect approved adjustments in the performance schedule, and (3) as required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors used by the Government. The Contractor shall submit a schedule, which sequences work so as to minimize disruption at the job site.
(d) All deliverables shall be in the English language and any system of dimensions (English or metric) shown shall be consistent with that used in the contract. No extension of time shall be allowed due to delay by the Government in approving such deliverables if the Contractor has failed to act promptly and responsively in submitting its deliverables. The
Contractor shall identify each deliverable as required by the contract.
(e) Acceptance of Schedule: When the Government has accepted any time schedule, it shall be binding upon the Contractor. The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer. Acceptance or approval of any schedule or revision thereof by the Government shall not:
(1) Extend the completion date or obligate the Government to do so,
(2) Constitute acceptance or approval of any delay, or
(3) Excuse the Contractor from or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
NOTICE OF DELAY
If the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the Contractor believes may result in late completion of the project, the Contractor shall notify the Contracting Officer. The Contractor’s notice shall state the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule, or the completion date should be revised. The Contractor shall give such notice promptly, not more than ten (10) days after the first event giving rise to the delay or prospective delay. Only the Contracting Officer may revise the approved time schedule.
NOTICE TO PROCEED
(a) After receiving and accepting any bonds or evidence of insurance, the Contracting Officer will provide the Contractor a Notice to Proceed. The Contractor must then prosecute the work, commencing and completing performance not later than the time period established in the contract.
(b) It is possible that the Contracting Officer may elect to issue the Notice to Proceed before receipt and acceptance of any bonds or evidence of insurance. Issuance of a Notice to Proceed by the Government before receipt of the required bonds or insurance certificates or policies shall not be a waiver of the requirement to furnish these documents.
WORKING HOURS
All work shall be performed during work hours from 7:30 AM to 5:00 PM Monday through Saturday. Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative (COR). The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase.
PRECONSTRUCTION CONFERENCE
A preconstruction conference will be held 10 days after contract award at the US Embassy Brazzaville Chancery to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that affect construction progress. See FAR 52.236-26, Preconstruction Conference.
DELIVERABLES - The following items shall be delivered under this contract:
Description Quantity Deliver Date Deliver To
Section G. Securities/Insurance 1 10 days after award CO Section E. Construction Schedule 1 10 days after award COR Section E. Preconstruction Conference 1 10 days after award COR Section G. Personnel Biographies 1 10 days after award COR
Section F. Payment Request 1 Last calendar day of each month COR
Section D. Request for Substantial Completion 1 15 days before inspection COR
Section D. Request for Final Acceptance 1 5 days before inspection COR
SECTION F – CONTRACT ADMINISTRATION DATA
652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR).
Such designation(s) shall specify the scope and limitations of the authority so delegated;
provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer, and this authority is delegated in the designation.
(b) The COR for this contract is Facilities Maintenance Manager.
Payment: The Contractor's attention is directed to Section H, 52.232-5, "Payments Under Fixed-Price Construction Contracts". The following elaborates on the information contained in that clause.
Requests for payment may be made no more frequently than monthly. Payment requests shall cover the value of labor and materials completed and in place, including a prorated portion of overhead and profit.
After receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount, which is then due. If the Contracting Officer does not approve payment of the full amount applied for, less the retainage allowed by in 52.232-5, the Contracting Officer shall advise the Contractor as to the reasons.
Under the authority of 52.232-27(a), the 14-day period identified in FAR 52.232-27(a)(1)(i)(A) is hereby changed to 30 days.
brazzaville-usembassy-bills@state.gov or
Boulevard Denis Sassou Nguesso 70-83 Section D (face maternité Blanche Gomes)
Brazzaville, Republic of Congo
SECTION G - SPECIAL TERMS AND CONDITIONS
G.1.0 PERFORMANCE/PAYMENT PROTECTION - The Contractor shall furnish some form of payment protection as described in 52.228-13 in the amount of 50% of the contract price.
G.1.1 The Contractor shall provide the information required by the paragraph above within ten
(10) calendar days after award. Failure to timely submit the required security may result in rescinding or termination of the contract by the Government. If the contract is terminated, the Contractor will be liable for those costs as described in FAR 52.249-10, Default (Fixed-Price Construction), which is included in this purchase order.
G.1.2 The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time. This security shall also guarantee the correction of any defects after completion, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.
G.1.3 The required securities shall remain in effect in the full amount required until final acceptance of the project by the Government. Upon final acceptance, the penal sum of the performance security shall be reduced to 10% of the contract price. The security shall remain in effect for one year after the date of final completion and acceptance, and the Contractor shall pay any premium required for the entire period of coverage.
G.2.0 INSURANCE - The Contractor is required by FAR 52.228-5, "Insurance - Work on a Government Installation" to provide whatever insurance is legally necessary. The Contractor shall at its own expense provide and maintain during the entire performance period the following insurance amounts:
G.2.1 GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury):
(1) BODILY INJURY, ON OR OFF THE SITE, IN U.S. DOLLARS
Per Occurrence $2,000
Cumulative $10,000
(2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN U.S. DOLLARS
Per Occurrence $5,000
Cumulative $30,000
G.2.2 The foregoing types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
G.2.3 The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.
G.2.4 The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
G.2.5 The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
G.3.0 DOCUMENT DESCRIPTIONS
G.3.1 SUPPLEMENTAL DOCUMENTS: The Contracting Officer shall furnish from time to time such detailed drawings and other information as is considered necessary, in the opinion of the Contracting Officer, to interpret, clarify, supplement, or correct inconsistencies, errors or omissions in the Contract documents, or to describe minor changes in the work not involving an increase in the contract price or extension of the contract time. The Contractor shall comply with the requirements of the supplemental documents, and unless prompt objection is made by the Contractor within 20 days, their issuance shall not provide for any claim for an increase in the Contract price or an extension of contract time.
G.3.1.1. RECORD DOCUMENTS. The Contractor shall maintain at the project site:
(1) a current marked set of Contract drawings and specifications indicating all interpretations and clarification, contract modifications, change orders, or any other departure from the contract requirements approved by the Contracting Officer; and,
(2) a complete set of record shop drawings, product data, samples and other submittals as approved by the Contracting Officer.
G.3.1.2 . "As-Built" Documents: After final completion of the work, but before final acceptance thereof, the Contractor shall provide:
(1) a complete set of "as-built" drawings, based upon the record set of drawings, marked to show the details of construction as actually accomplished; and,
(2) record shop drawings and other submittals, in the number and form as required by the specifications.
G.4.0 LAWS AND REGULATIONS - The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the construction site without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations, and orders and of the contract. In the event of a conflict between the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.
G.4.1 The Contractor shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
G.4.2 The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
G.4.3 The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause.
G.5.0 CONSTRUCTION PERSONNEL - The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous, or disorderly conduct by or among those employed at the site. The Contractor shall ensure the preservation of peace and protection of persons and property in the neighborhood of the project against such action. The Contracting Officer may require, in writing that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
G.5.1 If the Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately give notice, including all relevant information, to the Contracting Officer.
G.5.2 After award, the Contractor has ten calendar days to submit to the Contracting Officer a list of workers and supervisors assigned to this project for the Government to conduct all necessary security checks. It is anticipated that security checks will 30 days to perform. For each individual, the list shall include:
Full Name Place and Date of Birth Current Address Identification number
Failure to provide any of the above information may be considered grounds for rejection and/or resubmittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. This badge may be revoked at any time due to the falsification of data, or misconduct on site.
G.5.3 The Contractor shall provide an English-speaking supervisor on site at all times. This position is considered as key personnel under this purchase order.
G.6.0 Materials and Equipment - All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified. All workmanship shall be of good quality and performed in a skillful manner that will withstand inspection by the Contracting Officer.
G.7.0 SPECIAL WARRANTIES
G.7.1 Any special warranties that may be required under the contract shall be subject to the stipulations set forth in 52.246-21, "Warranty of Construction", as long as they are not in conflict.
G.7.2 The Contractor shall obtain and furnish to the Government all information required to make any subcontractor's, manufacturer's, or supplier's guarantee or warranty legally binding and effective. The Contractor shall submit both the information and the guarantee or warranty to the Government in sufficient time to permit the Government to meet any time limit specified in the guarantee or warranty, but not later than completion and acceptance of all work under this contract.
G.8.0 EQUITABLE ADJUSTMENTS
Any circumstance for which the contract provides an equitable adjustment that causes a change within the meaning of paragraph (a) of the "Changes" clause shall be treated as a change under that clause; provided, that the Contractor gives the Contracting Officer prompt written notice (within 20 days) stating:
(a) the date, circumstances, and applicable contract clause authorizing an equitable adjustment and
(b) that the Contractor regards the event as a changed condition for which an equitable adjustment is allowed under the contract
The Contractor shall provide written notice of a differing site condition within 10 calendar days of occurrence following FAR 52.236-2, Differing Site Conditions.
G.9.0 ZONING APPROVALS AND PERMITS
The Government shall be responsible for:
- obtaining proper zoning or other land use control approval for the project
- obtaining the approval of the Contracting Drawings and Specifications
- paying fees due for the foregoing; and,
- for obtaining and paying for the initial building permits.
SECTION H - CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. In addition, the full text of a clause may be accessed electronically at: Acquisition.gov this address is subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the location indicated above, use the Department of State Acquisition website at e-CFR to see the links to the FAR. You may also use an Internet “search engine” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSE(S) IS/ARE
INCORPORATED BY REFERENCE (48 CFR CH. 1):
CLAUSE TITLE AND DATE
52.202-1 DEFINITIONS (JUN 2020)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (JUN 2020)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT
2018)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(AUG 2020)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.225-5 TRADE AGREEMENTS (NOV 2023)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION
OF CONTRACT (FEB 2000)
52.228-3 WORKERS’ COMPENSATION INSURANCE (DEFENSE BASE ACT)
(JUL 2014)
https://acquisition.gov/browse/index/far https://gov.ecfr.io/cgi-bin/text-idx?SID=d9a7851186785ba2b1896db79b1b6b29&mc=true&tpl=/ecfrbrowse/Title48/48tab_02.tpl
52.228-4 WORKERS’ COMPENSATION AND WAR-HAZARD INSURANCE
OVERSEAS (APR 1984)
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-11 PLEDGES OF ASSETS (FEB 2021)
52.228-13 ALTERNATIVE PAYMENT PROTECTION (JULY 2000)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN 2020)
52.229-6 TAXES - FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
52.229-7 TAXES- FIXED PRICE CONTRACTS WITH FOREIGN GOVERNMENTS
(FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
(MAY 2014)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232-11 EXTRAS (APR 1984)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
52.232-22 LIMITATION OF FUNDS (APR 1984)
52.232-25 PROMPT PAYMENT (JAN 2017)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER – OTHER THAN
SYSTEM FOR AWARD MANAGEMENT (JULY 2013)
52.233-1 DISPUTES (MAY 2014)…
This is the start of the file's text. The full file is on GovTribe.