19AU9024Q0015_SOW.pdf

PDF 416 KB Posted

Attached to
Installation Attic Insulation
Solicitation number
19AU9024Q0015
Issued by

About this file

This document is a specification for an attic insulation replacement project at a U.S. Government-owned residence in Vienna, Austria. The work includes site installation and delivery/installation of walk-in attic insulation, with an estimated project size between $25,000 and $100,000. Key details include:

The contractor is responsible for providing all labor, materials, supervision, equipment, insurance, taxes, and related services to complete the work per the technical specifications. The work must comply with relevant Austrian and U.S. standards and codes. The contractor will be subject to security vetting and will be escorted on-site by U.S. Embassy personnel. The project execution period is July/August 2024. Pricing is required on a unit price basis, including options for hourly labor rates and materials markup. The solicitation number is 19AU9024Q0015.

View the file

Other files

File Type Posted
19AU9024Q0015_SF1442_Attic Insulation Installation.docx DOCX document
19AU9024Q0015_Cover Letter.pdf PDF
19AU9024Q0015_Attic Insulation Installation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American Embassy Vienna Bauvorhaben / Construction project: US- Botschaftsresidenz, Tuerkenschanzstrasse 22, 1180 Wien Verlegung Dachbodendaemmung / Installation attic insulation Leistungsverzeichnis / Specification

Page | 1 Facility Management/FAC May 2024

SENSITIVE BUT UNCLASSIFIED

ALLGEMEINE BESTIMMUNGEN

GENERAL REMARKS

Allgemeine Vorbemerkungen General preliminary comments

1. Leistungsumfang Dieses Leistungsverzeichnis umfasst die Sanierung der Dachbodendaemmung fuer das Objekt Tuerkenschanzstrasse 22, 1180 Wien.

Die Arbeiten umfassen folgende Hauptleistungen:

- Baustelleneinrichtung

- Lieferung und Montage einer begehbaren Dachbodendaemmung Scope of work This tender specification covers the attic insulation replacement at Tuerkenschanzstrasse 22, 1180 Vienna.

The work consists of, but is not limited to the following:

- Site installation

- Delivery and installation of walk-in attic insulation

2. Reihenfolge der Gültigkeit Die Vertragsunterlagen gelten in folgender Reihenfolge:

• Auftragsschreiben

• Text des Leistungsverzeichnisses (Allgemeine und technische Bestimmungen vor

Leistungsbeschreibung)

• Projektpläne, Schemata, Berechnungsunterlagen, Baubeschreibung und der Bauzeitenplan

Sequence of Applicability Contract documents apply in the following sequence:

• Written order (purchase order or contract)

• Text of the Tender Specifications (General remarks and technical comments before specifications)

• Project drawings, schemata, Technical specifications and Project time-schedule

3. Gültigkeit der Normen Für dieses Projekt gelten die fachtechnischen ÖNORMEN in der zum Zeitpunkt der Auftragserteilung gültigen Fassung. US-Gesetze und Normen kommen dort zur Anwendung wenn diese explizit im Leistungsverzeichnis genannt werden bzw. wenn sich aus der Erfuellung derselben eine hoehere Qualitaet der Ausfuehrung ableitet.

Validity of the standards For this project the specialist technical AUSTRIAN STANDARDS are applicable in the version stated at the time of awarding the contract. US codes and standards shall apply to construction if specially named in the item specification or if the guidelines are requiring a higher grade of quality.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 2 Facility Management/FAC May 2024

4. Vorbehalte – Änderungen – Alternativen Insoferne der Bieter Vorbehalte, Änderungen oder Alternativen zum Leistungsverzeichnis vorbringen möchte, sind diese in einem Begleitschreiben zum Angebot beizulegen. Die neue Schlusssumme muss sich aus dem begleitenden Schreiben bei der Eröffnung sofort erkennen lassen.

Für gleichartige Anlegenteile, bei denen Fabrikat und Type freigestellt sind, sind einheitliche Fabrikate anzubieten um die Ersatzteilhaltung und Wartung zu vereinfachen.

Reservations – Modifications – Alternatives Insofar as the bidder wishes to present reservations, modifications or alternatives to the performance specification, these are to be enclosed in an accompanying letter to the quotation.

The new final sum must be immediately evident on opening the enclosed letter.

For similar type plant parts, for which brand and type are optional, uniform brands are to be offered in order to simplify the storage of spare parts and maintenance.

5. Ausführungsfristen Für die Erbringung der dem Auftragnehmer übertragenen Leistungen gelten die vereinbarten Ausführungsfristen.

Durchfuehrungszeitraum: Juli/August 2024 Sollten sich aus Gründen, die der Auftragnehmer zu vertreten hat, Verschiebungen von Terminen ergeben, so ist ein neuer Terminplan zu erstellen. Die neuen Fristen erlangen nach ihrer Bekanntgabe durch den Auftraggeber die gleiche Rechtswirksamkeit wie die ursprünglich vereinbarten Termine.

Execution periods For completion of the work given to the contractor, the agreed execution periods apply.

If, for reasons which the contractor has to justify - deadlines are postponed then a new schedule is to be drawn up. After their announcement these new periods acquire the same legal effectiveness as the originally agreed deadlines.

Execution date: July/August 2022

6. Vertragsgrundlagen Im Falle einer Beauftragung finden auch die vertragsrechtlichen Bedingungen der U.S. Regierung Anwendung.

Im Detail können diese Bestimmungen bei der ausschreibenden Stelle der Einkaufs- und Vertragsabteilung (Procurement / Contracting Office) der U.S. Botschaft eingesehen werden.

Etwaige eigene Lieferbedingungen des Bieters werden für die Erfüllung des Vertrages nicht anerkannt.

Basics of contract In the event of being appointed to do the work, the legal contract provisions of the U.S. Government apply.

In detail these provisions can be seen or requested at the Procurement / Contracting Office of the U.S.

Embassy.

Any supply requirements of the bidder himself are not recognized for the fulfillment of this contract.

7. Schadenersatz Bei Nichteinhaltung der vereinbarten Termine ist der Auftraggeber berechtigt, Schadenersatzansprüche (“Liquidated Damages”) entsprechend den vertragsrechtlichen Bestimmungen geltend zu machen.

Compensation, Liquidated damages If the agreed deadlines are not met, the client is entitled to enforce compensation claims (“Liquidated Damages”) in accordance with the legal contractual requirements.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 3 Facility Management/FAC May 2024

8. Gewährleistung, Mängel Der Auftragnehmer haftet für die einwandfreie Ausführung der gewöhnlich vorausgesetzten und vertraglich bedungenen Leistungserbringung sowie für die einwandfreie Beschaffenheit aller von ihm verwendeten Baustoffe und Materialien.

Werden vom Auftraggeber Materialien beigestellt, so hat der Auftragnehmer sie auf ihre Tauglichkeit zu überprüfen.

Die Gewährleistungsfrist beträgt drei Jahre und beginnt mit dem Tag der Übernahme der Leistung durch den Auftraggeber.

Innerhalb dieser Gewährleistungfrist sind auftretende Mängel sowie etwaige Mängelfolgeschäden unverzüglich, längstens jedoch 14 Tage nach Aufforderung zu beheben. Bei Gefahr in Verzug, ist die Mängelbehebung sofort durchzuführen.

Wird einer diesbezüglichen Aufforderung nicht Folge geleistet, steht dem Auftraggeber das Recht zu, diese Mängel durch Dritte auf Kosten und Gefahr des Auftragnehmers beheben zu lassen.

Warranty, defects The contractor is liable for perfect execution of the normal presupposed and contractually necessitated work as well as for the perfect quality of all constructional substances and materials which are used by him.

If materials are provided by the client, the contractor has to check then for suitability.

The warranty period is 3 years and begins with the day of final acceptance of work by the COR.

Within the guarantee period, faults which arise – as well as any consequential damages due to faults – are to be corrected immediately and, at the latest, 14 days after request. If danger is imminent, the fault correction is to be carried out immediately.

If such a request is not complied with, the client is entitled to have these faults corrected by a third party at the cost and risk of the contractor.

9. Sicherstellungen Bei Aufträgen mit einer Vertragssumme von US$ 30.000 (Netto-Herstellungssumme) oder darüber ist vom Auftraggeber eine Sicherstellung in Höhe von 20% der Vertragssumme in Form einer abstrakten Bankgarantie eines anerkannten in- oder ausländischen Bankinstitutes zu legen.

Bonds For orders with a contractual Total of US$ 30,000 (excl. VAT) or above, a bond in the amount of 20% of the contractual total is to be deposited by the contractor in form of an abstract bank guarantee letter of a recognized local or foreign banking institute.

10. Zahlung Die Leistungen sind nach Fertigstellung der Leistung und mängelfreier Übernahme mit Schlussrechnung abzurechnen.

Vorrangig gelten die Zahlungsbedingungen laut Auftragsschreiben.

Payment The entire work is to be invoiced for by means of a final invoice after completion of the work and fault-free acceptance.

The payment conditions apply in priority as in the written order.

11. Preisbildung Der Bieterpreis gilt fuer die vollstaendige, richtige, angemessene und professionelle, fertige Verarbeitung einschliesslich Material, wenn auch nicht ausdruecklich erwaehnt und darueber hinaus damit verbundene Dienstleistungen, wie folgt:

Alle Maschinen, Werkzeuge, Geraete, Gerueste, Hebewerkzeuge, Krane, Sicherung und Schutzmassnahmen, alle Verpackungen, Transporte, Lagerungen und Manipulationen und Entsorgungen.

Schutz von Bauteilen, Verkehrsanlagen, Geraeten um Bauschaeden oder Verletzungen zu vermeiden.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 4 Facility Management/FAC May 2024

Pricing The bidders price is for the complete, proper, appropriate and professional, ready to use workmanship, including all material, even if not specifically mentioned and beyond basics, manpower and associated services, in particular the following:

All machinery, tools, equipment, scaffolding, lifting gear, cranes, safeguarding and protection measure, all packaging, transportation, storage, manipulation and disposal Protection of already built elements from dirt and damage until acceptance, the establishment, maintenance, opening and closing and dismateling of transport routes and openings, all connection and adapting work to adjacent components, regardless of the execution time inclusive all waste and material consumption and all appropriate action needed to prevent harassment of e.g. neighbors.

12. Leistungserbringung Der Auftragnehmer bestätigt durch die Unterfertigung des Anbotes, dass er über alle erforderlichen Materialien, Arbeitskräfte, Geräte und Einrichtungen sowie über die erforderlichen Erkenntnisse verfügt, um die bedungenen Leistungen fach- und termingerecht ausführen zu können.

Der Einsatz der Arbeitskräfte und Maschinen hat sich den jeweiligen Erfordernissen des Baufortschrittes anzupassen.

Performance of work By signing the offer, the contractor confirms that he has all the required materials, manpower, devices and equipment – as well as the required knowledge and skills-, in order to be able to carry out the stipulated work expertly and on schedule.

13. Zusammenwirken mehrerer Auftragnehmer Jeder Auftragnehmer ist verpflichtet, von sich aus Koordination und Absprache mit den anderen auf der Baustelle beschäftigten Auftragnehmern zu suchen.

Collaboration of several contractors Each contractor is obliged to seek coordination and agreement with the other contractors working on the construction site.

14. Prüfpflicht, Naturmasse Der Auftragnehmer hat Vorgewerke hinsichtlich termingerechter Erbringung von Vorleistungen und Qualität zu prüfen und den Auftraggeber rechtzeitig über etwaige Probleme zu informieren.

Duty of checking on-site conditions The contractor has to check on-site conditions and advanced work from other contractors in regard of scheduled completion and quality and in case of problems has to inform the client timely.

Before starting production or the work, on-site measurements have to be taken in good time.

15. Recht, Vertragsstreitigkeiten Für die Erfüllung dieses Vertrages gilt auch amerikanisches Recht. Vertragsstreitigkeiten werden nach dem U.S.”Contract Disputes Act of 1978, as amended (U.S.C.601-613) abgehandelt.

Law, Contract disputes For the fulfilling of this contract, U.S. law applies.

Contract disputes will be dealt with in accordance with the U.S. “Contract Disputes Act of 1987, as amended (U.S.C. 601-613)”.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 5 Facility Management/FAC May 2024

16. Teilvergaben Es ist möglich, dass verschiedene ausgeschriebene Teilleistungen auf Entscheid des Auftraggebers nicht ausgeführt warden.

Der Auftragnehmer kann daraus keinerlei Mehrforderungen ableiten und hat die verbleibenden Leistungen zu den auf Grund der Ausschreibung gültigen Einheitspreisen zu erbringen.

Partial allocation It is possible that various tendered sub-tasks are, at the decision of the client, not executed. The contractor cannot make any additional demands, whatsoever from this and has to complete the remaining work at the unit prices which apply, based on the tender.

17. Weitergabe des Auftrages – Subunternehmer Die Weitergabe des Gesamtauftrages ist nicht gestattet.

Die Übertragung von Teilen des Auftrages an Subunternehmer ist zulässig, soweit dies branchenüblich ist und die Zustimmung des Auftraggebers vorher in jedem Fall eingeholt wurde.

In jedem Fall bleibt der Ersteher gegenüber dem Auftraggeber allein verantwortlich und haftet für seine Subunternehmer.

Passing on of the contract – Subcontractors The passing on of the complete contract is not permitted:

The transfer of parts of the contract to subcontractors is permitted, insofar as this is common in the branch and the consent of the ordering party has in all casee been obtained beforehand.

In all cases, the purchaser remains solely responsibly towards the ordering party and is liable for his subcontractors.

18. Baustellenbesichtigung Vor Angebotsabgabe muss sich der Bieter über den Zustand der Anlage/Baustelle, die Zufahrts- und Lagermöglichkeiten sowie sonstige örtliche Besonderheiten (zB Arbeitszeiten) ausreichend informieren.

Building site inspection Before formulating the quotation, the bidder must obtain adequate information about the condition of the building site, the access and storage possibilities as well as other local peculiarities (eg: worktime).

19. Sicherheitsbestimmungen Es wird auf die besonderen Sicherheitsbestimmungen bei Arbeiten in Gebäuden der Botschaft der Vereinigten Staaten hingewiesen.

Das für den Arbeitseinsatz vorgesehene Personal ist einer Sicherheitsüberprüfung durch die Sicherheitsabteilung der Botschaft zu unterziehen. Dazu ist es notwendig, die entsprechenden Formblätter mit den Personalien spätestens zwei Wochen vor Arbeitsbeginn einzusenden.

Der Auftraggeber behält sich vor, Personal des Auftragnehmers ohne Angabe von Gründen abzulehnen, ohne dass daraus dem Auftragnehmer irgendwelche Rechte erwachsen.

Security Regulations Reference is made to the special security regulations for work to be done in buildings of the Embassy of the United States of America.

Personnel, intended for employment in the work are to be subjected to a security check by the Embassy’s Security Department. For this, it is necessary to send in the appropriate forms with the personal details two weeks before the start of the work at the latest. The client reserves the right to reject personnel of the contractor without giving reasons and without any rights accruing to the contractor from this.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 6 Facility Management/FAC May 2024

20. Geheimhaltung Der Auftragnehmer verpflichtet sich, Informationen, welche er im Zusammenhang mit der Durchführung des Projektes erhält, geheimzuhalten und wird seine Mitarbeiter, Subunternehmer und Erfüllungsgehilfen verpflichten, sämtliche ihnen zukommenden Informationen vertraulich zu behandeln.

Der Auftraggeber behält sich rechtliche Schritte und Schadenersatzforderungen im Falle des Verstosses gegen diese Vertragsbestimmungen vor.

Secrecy The contractor commits himself to keep information which he receives in connection with the carrying out of the project and will commit his employees, subcontractors and people employed in performance of his obligations, to handle all informations which come to them as strictly confidential.

The client retains the right to legal action and claims for compensation in the event of a breach of this condition of contract.

21. Personalbeaufsichtigung durch AG Der Auftraggeber beaufsichtigt ständing das Personal des Auftragnehmers. Arbeitsgruppen, welche unter der Aufsicht eines Sicherheitsorganes der US Botschaft arbeiten, können sich nur insoweit im Arbeitsbereich frei bewegen, als jederzeit der Überblick über die gesamte Arbeitsgruppe gegeben sein muss.

Sicherheitsanweisungen des Aufsichtspersonals ist sofort Folge zu leisten.

Die Anzahl der gleichzeitig am Projekt beschäftigbaren Arbeitskräfte ist abhängig von der Anzahl der Aufsichtsorgane und wird vom Auftraggeber festgelegt.

Erschwernisse infolge der vorstehenden Sicherheitsbestimmungen sind in die Einheitspreise einzurechnen.

Ausser vom Auftraggeber angeordneten Arbeitsunterbrechungen sind Mehrforderungen aufgrund Behinderungen ausgeschlossen.

Escorting of personnel by the client The client continuously escorts the personal of the contractor. Work groups which work under the attendance of a security escort of the U.S. Embassy can only move freely in the work area in this respect as at all times there must be an overview over the entire work group.

Security instructions of the supervisory personal must be obeyed immediately.

The number of workers which can work at one time on the project is dependent on the number of supervisory agents and layd down by the client.

Difficulties as a consequence of these security regulations are to be calculated into the unit prices. Except for work interruptions ordered by the client, additional demands due to hindrances are excluded.

22. SAM - Registrierung Bei Aufgrägen mit einer Brutto-Vertragssumme von US$ 30,000 oder darüber, ist eine Registrierung in SAM (Vergabeverwaltungssystem = Auftragskataster) vor der Bauftragung erforderlich.

SAM registration For orders with a contractual total amount of US$ 30,000 including Value Added Tax or above, registration in SAM (System for Award Management) is required prior to contract award.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 7 Facility Management/FAC May 2024

TECHNISCHE VORBEMERKUNGEN BAUTECHNIK

TECHNICAL COMMENTS CONSTRUCTION ENGINEERING

Mit dem Auftrag uebernimmt der Auftragnehmer/AN die volle und uneingeschraenkte Verantwortung sowohl fuer die richtige Wahl und Verarbeitung bestens geeigneter, einwandfreier Materialien als auch fuer die sach- und fachgerechte Ausfuehrung.

Fuer die Leistungserbringung sind grundsaetzlich, in jeweils letztgueltiger Fassung, alle einschlaegigen OENORMEN, Gesetze und Verordnungen, behoerdliche Auflagen, Bestimmungen und Anordnungen, die Richtlinien, Beschreibungen, Verarbeitungshinweise und Typenblaetter der Herstellwerke sowie die anerkannten Regeln des Handwerks und der Technik verbindlich. US Gestze und Normen kommen dort zur Anwendung, wenn diese besonders in den Leistungsverzeichnissen genannt werden bzw. Wenn sich aus der Erfuellung derseleben eine hoehere Qualitaet der Ausfuehrung ableitet.

Insbesondere sind dies:

OENORM B2210 Allgemeine Vertragsbestimmungen fuer Bauleistungen B 4300-7, B4600-7, EN 1090, OEVE/OENORM E 8001-4 Errichtung von elektrischen Anlagen mit Nennspannungen bis AC 1000V

OENORM B6000, EN 13501-1, DIN 4102

Under this contract, the contractor assumes full and unlimited responsibility both for the right choice and processing of best possible, defect-free materials and for proper and professional workmanship.

The services shall be performed in compliance with all relevant Austrian Standards (OENORMEN), laws and regulations (e.g. health and safety at work acts, occupational health and safety regulation for constructionm workers etc.), regulatory requirements, laws and circulars, the guidelines, descriptions, processing instructions and data sheets of the plants and the recognised trade and technical rules, as amended. US codes and standards ahall apply to construction if specially named in the item specifications or if the guidelinesare requiring a higher grade of quality.

In particular named:

OENORM B2210 General conditions for constructions B 4300-7, B4600-7, EN 1090, OEVE/OENORM E 8001-1 Erection of electrical installation with rated voltages up to 1000V AC

OENORM B6000, EN 13501-1, DIN 4102

Der AN hat alle Arbeitsleistungen, Materialien, Ueberwachung, Ausruestung, Versicherung, Steuern, Verwaltung und Dienste zu liefern, die erforderlich sind, um die Arbeiten entsprechend der Leistungsbbeschreibung abzuschliessen.

Die Ausfuehrung umfasst jeweils die kompletten Leistungen, auch wenn diese in der Beschreibung oder den Plaenen nicht mehr ausdruecklich erwaehnt werden, dh zB Durchbrueche, Stemmarbeiten, Verputzarbeiten , Unterkonstruktionen, Verankerungsmaterial, Duebel etc. , sowie saemtliche damit verbundenen Nebenleistungen. Saemtliche Teile sind lagerichtig, fluchtend und auf das Achsensystem der Baustell abgestimmt, geradlinig, plan und ebenflaechig zu versetzen.

Alle Anlagenteile sind in höchstmöglicher Qualitàt nach dem Ietzten Stand der Technik zu liefern und zu montieren.

Ein einwandfreier Korrosionsschutz aller Anlagenteile muss gewährleistet sein. Fuer Anstriche gelten die einschlaegigen Normen.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 8 Facility Management/FAC May 2024

In accordance to this scoppe of work, Contractor shall furnish all labor, materials, supervision, equipment, insurance, taxes, overhead and all things and services necessary to complete the work required.

The execution to be performed includes all services, even if they are no longer expressly mentioned in the specifications or plans, i.e.penetrations, chiseling work, plastering, substructures, anchor materials, dowels, etc. As well as all related ancillary services. All parts must be offset and adjusted in absolutely correct position and aligned in a linear manner to the axis system of the construction site.

All components shall be supplied and mounted in the highest quality possible and in accordance with the latest technological advances.

Effective corrosion protection of all components must be ensured. The relevant legislation applies to painting.

Der AN ist fuer die Sicherheit am Bau verantwortlich und muss das regionale Arbeitsrecht, Regelungen, Zollvorschriften und Auflagen betreffend Arbeit, Sicherheit und dergleichen erfuellen. Der AN muss alle Unfaelle, die zu Zeitverzoegerungen fuehren, sowie das Eisnstellen der Arbeitsleistung oder lebensgefaehrliche Verletzungen dem COR (Projektleiter US Botschaft, Saurer Erwin) unverzueglich anzeigen.

Der AN ist in Uebereinstimmung mit anwendbaren Gestzen gegenueber der Botschaft fuer alle Schaeden an der Botschaft verantwortlich, welche durch fahrlaessige Leistungserbringung des AN innerhalb des Auftrages verursacht werden. Die Rechte und Rechtsbehelfe resultierend aus diesem Vertrag zugunsten der Botschaft gelten zusaetzlich zu sonstigen Rechten und Rechtsbehelfen auf Basis von Gesetzen.

Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs and prcactices pertaining to labor, safety and similar matters. The contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the COR (Saurer Erwin).

Contractor shall be and remain liable to the Embassy in accordance with applicable law for all damages to the Emabssy caused by the Contractors negligent performance of any of the services furnished under this contract. The rights and remedies for the Embassy provided for under this contract are in addition to any other rights and remedies provided by law.

Baurestmassenentsorgung/- trennung:

Der AN ist verpflichtet die Baurestmassenentsorgung/- trennung und deren Nachweis, beides gemaess:

- Abfallwirtschaftsgestz (AWG)\

- Verordnung ueber die Trennung von Bauabfaellen

- Abfallnachweisverordnung

- Problemstoffverordnung

- Verordnung ueber die die Festsetzung gefaehrlicher Abfaelle

- und gemaess allen sonstigen zutreffenden gestzlichen Vorschriften in jeweils letztgueltiger Fassung zu liefern.

Der AN verpflichtet, sich spetestens bis zur Uebergabe der eigenen Leistungen die ausgefuellten, firmenmaessig unterfertigten Baurestmassennachweisformulare dem AG zu uebergeben.

Alle sich aus dem oben angefuehrten Leistungen ergebenden Kosten werden nicht gesondert verguetet und sind in die Einheitspreise einzurechnen.

Der AG behaelt sich vor, im Falle des nicht Beibringens des Nachweises fuer vorschriftsmaessige Baurestmassentrennung durch den AN, seine Schlussrechnung nicht anzuerkennen.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 9 Facility Management/FAC May 2024

Construction waste disposal / separation:

The contractor shall provide for the disposal / seperation of construction waste and prove such disposal or seperation pursant to the:

- Waste Management Act (WMA)

- Construction waste seperation ordinance

- Ordinance on waste evidence

- Hazardous waste ordinance

- Hazardous waste determination ordinance

- Pursant to all other applicable legal provison, as amended.

The contractor shall hand over the filled out and duly signed construction waste evidence forms to the principal not later than upon the delivery of its services.

All costs arising from the services referred to above will not be paid seperately but included in the unit prices.

The principal reserves the right to refuse recognition of contractor’s final invoice if he has failed to provide evidence for the due seperation of construction waste.

Qualitaetsanforderungen:

Sind im Leistungsverzeichnis Erzeugnisse beispielhaft angefuehrt, so weist der Bieter fuer angebotene gleichwertige Erzeugnisse auf Verlangen bei Angebotspruefung die Qualitaetsgleichwertigkeit durch Pruefzeugnisse einer akkreditierten Pruef- oder Ueberwachungsstelle nach. Falls der Nachweis der Qualitaetsgleichwertigkeit nicht erbracht wird, werden die im Leistungsverzeichnis vom AG namentlich angefuehrten Erzeugnisse zum Angebotspreis verwendet. Erfordern die angebotenen Erzeugnisse das Aendern von Plaenen oder/und von Berechnungen, die zum Zeitpunkt des Zuschlages vorhanden sind, so kann der AG auf die Ausfuehrung der beispielhaft angefuehrten Erzeugnisse bestehen. Der AG kann seine Zustimmung unter der Bedingung erklaeren, dass der AN die Kosten der genannten Aenderunegn uebernimmt.

Massgebliche Kriterien fuer die Beurteilung der Gleichwertigkeit sind Konstruktion, Funktion und formale Gestaltung, technische Daten, Wirtschaftlichkeit und geringer Instandhaltungsaufwand.

Quality requirements:

If the tender document issued by the purchaser provides examples of products, the tender shall prove, upon request by means of certificates issued by an accredited inspection or supervison body, the equal quality of offered equivalent products if the purchaser has doubts in that respect. If the tender fails to prove the equal quality of these products, the products named by the purchaser in the tender document shall be used at the tender price. If the offered products require plan amendments and/or calculations existing at the time of the award, the customer may insist on the execution of the products indicated by way of example. The customer may make it a condition of its consent that the Contrator bears the costs of the plan amendements.

The structure, function, formal design, technical data, economic viability, and low maintenance costs shall be used as criteria for assessing the equal quality of the products offered.

Pruef- und Warnpflicht:

Der AN hat die Pflicht, das Leistungsverzeichnis und die dem Leistungsverzeichnis beiliegenden Skizzen und sonstigen Planunterlagen zu pruefen und die aufgrund der ihm zumutbaren Fachkenntnis bei Anwendung pflichtgemaesser Sorgfalt erkennbaren Mangel und Bedenken gegen die vorgesehene Art der Ausfuehrung sowie im LV fehlende Leistungen dem AG im Zuge der Anbotslegung schriftlich mitzuteilen.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 10 Facility Management/FAC May 2024

Duties of inspection and warning:

The bidder shall review the specifications and the enclosed drawings and other planning documents and inform the customer in writing about any defects identified and about its concerns about the provided type of execution and the services not included in the specifications as can be expected from its know-how when applying due diligence.

Genehmigung, Gutachten:

Der AN hat die fuer die Ausfuehrung der Arbeiten erforderlichen behoerdlichen Genehmigungen rechtzeitig und unentgeltlich zu erwirken (zB fuer Grabungsarbeiten, Nutzung und Schutz von oeffentlichen Bereichen, die Lagerung von Materialien, Baugenehmigungen, statische Berschnungen, Laermschutz, etc.).

Der AN ist darueber hinaus fuer die Zustimmung jener Nachbarn verantwortlich, deren Rechte durch die Baumassnahmen beeinflusst werden. Alle in diesem Zusammenhang anfallenden Kosten gehen zu Lasten des AN.

Permits, Opinions:

The contractor shall obtain in due time the official permits required for the execution of its works at no charge to the principal (e.g. digging permit, permit for protection of public areas, access to and storage of materials, building permits, structural analyses, noise protection opinions etc.). The Contractor shall furthermore obtain the consent of neighbours for works affecting their rights.

The costs arising in this connection will not be paid separately but must be included in the offered prices.

Zugaenglichkeit von Gebaeuden:

Von besonderer Bedeutung in diesem Zusammenhang ist die eingeschraenkte Zugaenglichkeit der Objekte, da ein Mitarbeiter der Botschaft diesen Zugang sicherstellen muss. Entsprechende Kontaktpersonen werden bei Auftragsvergabe beiderseits festgelegt, eine Aenderung ist dem jeweils anderem Vertragspartner nachwesilich zur Kenntnis zu bringen.

Accessibility of buildings:

Special consideration must be taken due to the restricted access of the objects as a representative of the Embassy has to be present for access. Points of contact need to be assignment on both sides, changes have to be brought to each others knowledge in a verifyable manner.

Schallschutz:

Die Konstruktion muss den Anforderungen der OENORM B 8115 entsprechen. Es duerfen keine Schallbruecken durch Kontakte zu verbindenden Komponenten verursacht werden, Es muessen angemessene Massnahmen gesetzt werden um eine Schallausbreitung zu verhindern.

Sound protection:

The structures must meet the requirements of OENORM B 8115. There are no acoustic bridges allowed caused by connections to adjacing components. Approraite measures need to be taken to prevent sound spread.

Brandschutz:

Materialien muessen die Brandlast moeglich geringhalten und duerfen keine Schaeden durch Freisetzung von Chloriden oder aetzenden Daempfen verursachen.

Fire protection:

Materials need to keep the fire load to a minimum and no damage will be caused by release of chlorid or corrosive vapors.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 11 Facility Management/FAC May 2024

Waermedaemmung:

Die Einhaltung der erforderlichen technischen und physikalischen Eigenschaften der isolierenden Materialien muessen vor der Ausfuehrung nachgewiesen werden. Alle Produkte muessen FCKW frei gemaess des Uebereinkommens von Montreal sein. Zusaetzliche Kosten fuer spezielle Zuschnitte, Kamineinfassungen und Ausschaeumungen der Hohlraeume, sowie die Begradigung unebener Deckenbereiche sind in die Einheitspreise einzurechnen. Die Befestigung der Isolierung muss durch geeignete mechanische Befestigungsmaterialien sichergestellt werden.

Thermal insulation:

The compliance with the required technical and physical properties of insulating materials must be demonstrated prior to execution. All products CFC free according to the Montreal convention. Additional expenses for special shapes, chimney connections and foaming of openings/hollows and floor levelling need to be encluded at the unit price. The fastening of the insulation must be made by applying appropriate mechanical fasteners to prevent slippage of the insulation or reduction of the ventilation width.

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 12 Facility Management/FAC May 2024

LEISTUNGSBESCHREIBUNG

SPECIFICATION

1) Baustelleneinrichtung/Site execution

Zu- und Abfuhr der Werkzeuge und Geraete sowie Baustellenraeumung und Reinigung.

Auf- und Abbau eines Treppenturms ~10m fuer den Dachzugang von aussen ueber die Dachflaeche.

Delivery and removal of tools and equipment as well as clearing of construction sites.

Installation- and de-installtion of a scaffold stair tower for the access to the attic.

1 PA/lumpsum EHP/unit price………… Gesamt/total………

2) Demontage/Demolition

Abbruch, Verbringung und fachgerechte Entsorgung von ~5m³ Baurestmassen (Schuettgut und Sondermuell).

Demolition and proper disposal of ~5m³ residual- and hazardous waste.

3) Montage/Installation Lieferung und Montage einer ~170m² nivellierten, atmungsaktiven hoch belastbaren Dachbodendämmung inkl. Dachlatten, Gipsfaser- Brandschutzplatten 10mm und allen dazu notwendigen Daemm-und Montagematerialien. Die Materialeinbringung erfolgt ueber das Dach, mit Kran-LKW~ 24m.

Lieferung und Montage von ~ 60lfm hoehenverstellbaren Stelzenlager fuer die Bestands Dachbodenrinnenkaesten- und Lueftungsanlagen.

Delivery and installation of ~170m² levelled attic insulation, consisting of walkable rigid foam panels incl. roof battens, 10mm gypsum boards with all necessary insulation- and installtion material- material delivery via the roof with a truck crane ~24m.

Approx. 60 lfm of height-adjustable pedestal bearings are to be supplied and installed for the existing attic guttering and ventilation systems.

Produkt/Product: Alpor GD Plus 160mm mit Fermacell Gipsfaserplatten 10mm (www.alpor.at) oder gleichwertig/ Alpor GD Plus 160mm with Fermacell gypsum fiberboards 10mm (www.alpor.at) or equal

Verlegung Dachbodendaemmung / Installation attic insulation

Page | 13 Facility Management/FAC May 2024

4) DIENSTLEISTUNGEN/ SERVICES

4.1) Regieleistungen Stundenlöhne Die angebotenen Stundensätze sind für kollektivvertragliche Normalstunden berechnet. Die Preise für angeordnete Überstunden in Regie werden wie folgt verrechnet: Der 50-prozentige Überstundenzuschlag ist ein Drittel vom vereinbarten Regiepreis.

Hourly rates The offered hourley rates are calculated for the regular working time. The rates for overtime (50%) if directly ordered by the principal will be charged with 1/3 extra charge of regular hourley rate.

4.1.1) Facharbeiter (Monteur) Skilled worker

10 HR/hours EHP/unit price……………… Gesamt/total…………….

4.1.2) Hilfsarbeiter (Helfer) Unskilled worker

10 HR/hours EHP/unit price……………… Gesamt/total…………….

4.2) Regieleistungen Materialbeistellung Beistellung von Materialien aller Art nach Verrechnungseinheiten.

Fuer die Beistellung mit den nachzuweisenden Einkaufspreisen, in der vorerst angenommen Hoehe von

1.000 € wird ein Auf- bzw. Abschlag von x% verrechnet. Als Einheitspreis ist der Auf- bzw. Abschlag als Faktor einzusetzen. (zB 1,10 fuer 10% Aufschlag, 0,90 fuer 10% Abschlag)

Provison of materials of all kinds For the provision of material based on the purchase price, initially presumed in the amount of 1,000 € a premium of discount of x% will be charged. As a unit price use the premium or discount as a factor (eg

1.10 for 10% premium, 0.90 for 10 % discount)

1000VE/ EHP/unit price……………… Gesamt/total…………….

Accounting units for pertaining material

GESAMTPREIS ohne USt. / EUR (total excl. VAT) …………………….

20% Umsatzsteuer / EUR (VAT) …………………….

GESAMTPREIS inkl. USt. / EUR (total incl.VAT) …………………….

Rechtsgueltige Unterschrift/Legally valid signature

File details come from the government source that posted it. Updated .