Questions Answers - 19-AM10-27-Q-0004 - part 2.pdf
PDF 132 KB Posted
- Attached to
- Q&A 2 to RFQ # 19-AM10-27-Q-0004 for Procurement of classroom equipment for US Embassy Yerevan
- Solicitation number
- 19-AM10-27-Q-004
- Issued by
-
Department of State
About this file
This is a Questions and Answers document for RFQ 19-AM10-27-Q-0004, addressing clarifications on the procurement of classroom equipment with a response deadline of COB November 17, 2026.
The document clarifies the scope of equipment supply across four key questions. The 100-inch monitor shown in the room plan is existing, customer-furnished equipment and falls outside the contractor's supply scope, so offerors should not include it in quotations. The two electronic whiteboards (Item 010) will each be placed in separate rooms. All costs for the required dedicated control processor, user interface, and switching/interface hardware must be included within the existing 12 line items at no additional cost, specifically under Item 006 (Central Control Unit/Conference Controller), which serves as the central hub for the conference microphone system and ensures interoperability among microphones (Items 002 and 004), speakers (Item 005), mixer (Item 007), and the two 75-inch televisions (Item 009). Item 006 does not need to control the projectors (Item 008), which will operate independently in separate classrooms. The contractor must provide all cabling, adapters, connectors, and interface hardware for integration at no additional cost. For the required video call and simultaneous online presentation acceptance test, the end user will provide the camera, conferencing platform/account, and any other items or platforms needed; contractors should not include these in their quotations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & ANSWERS
RFQ 19-AM10-27-Q-0004
PROCUREMENT OF CLASSROOM EQUIPMENT
Below are answers to the questions received from the offerors for the subject solicitation by COB November 17, 2026.
1. QUESTION
1. The NISTER room plan shows a 100-inch monitor in addition to the two 75-inch monitors. Is the 100-inch monitor existing or customer-furnished equipment outside the supply scope? If the contractor must furnish it, please identify its line item and specifications.
2. The Q&A says the two Item 010 whiteboards will go in separate rooms.
ANSWER:
1. 100-inch monitor: The 100-inch monitor is existing, customer-furnished equipment. It falls outside the equipment supply scope, and offerors shall not include it in their quotations. The room plan shows it only to give a picture of the room layout.
2. Electronic whiteboards (Item 010): Correct. The two electronic whiteboards will each go in a separate room (see also answer to question No. 2 in the 1st Q&A document).
2. QUESTION
Q15 requires a dedicated control processor and user interface, while Q12 says no components beyond the equipment list are needed and Q57 refers to the listed functions. Please confirm that the required control processor/interface and any necessary switching/interface hardware are to be included within the existing
12-line quotation, and identify the preferred line for those costs.
ANSWER:
Yes. Offerors shall include these costs within the existing 12 line items. Please see the details below.
There is no new line item being added.
1. Control processor and user interface: Offerors shall include these costs under Item 006 (Central
Control Unit / Conference Controller). Item 006 serves as the central control unit for the conference microphone system. It also serves as the central hub that ensures full interoperability among the microphones (Items 002 and 004), speakers (Item 005), mixer (Item 007), and the two 75-inch televisions
(Item 009). The equipment offered under Item 006 shall meet all Item 006 specifications.
2. Displays in the system: Only the two 75-inch televisions (Item 009) will be part of this system. Item 006 does not need to control the projectors (Item 008). The projectors will go in two separate classrooms, and users will operate them individually (also see answers to question No. 15 and 45 in the 1st Q&A document).
3. Switching and interface hardware: The contractor shall provide all cabling, adapters, connectors, and interface hardware needed for integration at no additional cost (see also answer to question No. 63 in the
1st Q&A document).
3. QUESTION
For the required video call and simultaneous online presentation acceptance test (Q17), will the customer provide the camera and conferencing platform/account, or must the contractor supply these? If contractor-supplied, please give the minimum requirements.
ANSWER:
The end user will provide the camera, the conferencing platform and account, and any other items or platforms needed for the acceptance test (see also No. 17 in 1st Q&A document). The contractor does not need to supply them, and Offerors shall not include them in their quotations.
4. QUESTION
The room plan attached to the Questions and Answers of 17 November shows a "100-inch monitor" in the conference room. It is not among the 12 line items of the solicitation.
Is this monitor existing equipment, or is it to be supplied by the contractor? If it is to be supplied, under which line item should it be quoted?
ANSWER:
The 100-inch monitor is existing, customer-furnished equipment. It falls outside the equipment supply scope, and offerors shall not include it in their quotations. The room plan shows it only to give a picture of the room layout.