195-25_Pricing.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Competitive Selection OH|DOT19525-1
- Contract number
- DOT19525-1
- Issued by
- Ohio
About this file
The document is a detailed pricing spreadsheet for a state and local contract indefinite delivery vehicle with Winner Aviation, specifically outlining inspection and maintenance pricing for King Air B300 and B200GT aircraft. The pricing document appears to be related to contract 195-25, focusing on OEM parts, components, accessories, and comprehensive aircraft inspection and maintenance services.
The contract provides itemized pricing for multiple inspection phases across different aircraft models, with hourly labor rates ranging from $131.00 to $196.50 per hour. Specific inspection services are meticulously broken down by phase, including tasks for different flight hour intervals, cycles, and time-based maintenance requirements. The pricing covers detailed inspections for specific aircraft serial numbers (FL977 for B300 and BY183 for B200GT), including engine maintenance for Pratt & Whitney Canada PT6A-60A and PT6A-52 engines. Notable pricing includes comprehensive inspection packages ranging from $100 to $15,865, with parts and labor costs clearly delineated. The contract explicitly notes that all parts pricing includes necessary oil for service performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AAC.pdf | ||
| Capabilities_List.pdf | ||
| Copy_of_MX_and_Parts_Roster_with_Job_Titles_11-1-23.xls | XLS spreadsheet | |
| Winner_Aviation_References.pdf | ||
| 195-25_Bid_Document.pdf | ||
| Antidrug_Plan__1_.docx | DOCX document | |
| Signature.pdf | ||
| Work_History.pdf | ||
| Affirmation_and_Disclosure__1_.pdf | ||
| Insurance.pdf | ||
| Ops_Spec.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing
| 195-24 Pricing | ||||
| Vendor Name: | Winner Aviation | |||
| Please quote and insert below, your lowest net delivered prices for the commodities (or services) herein described, guaranteed firm for the contract duration for : King Air B300 and/or B200GT, OEM parts, components, accessories, and the inspection and/or maintenance/repair. Please note the "Parts" sections noted with an asterisk as these inspections are to be inclusive of the cost of oil. | ||||
| Bid Item | Item Description | Quote Hourly Labor/Travel Rates | ||
| 1 | Inspection | $131.00 | per hour | |
| 2 | Maintenance | $131.00 | per hour | |
| 3 | Overtime | $196.50 | per hour | |
| 4 | Travel Time | $95.00 | per hour |
| Total cost of Inspections on a B300 Series Serial Number FL977 per Beechcraft Maintenance Manual 130-590031-11. Revision & Date entered below; | ||
| Revision: C4, Revision Date: Apr 15, 2023 | ||
| 1.1 | Inspection Phase 5 gives a list of tasks to be completed at the first dual inspection interval. The first dual inspection interval contains all Phase 1 and Phase 2 inspections, without duplicates. | Total Cost |
| a. Parts* | $800.00 | |
| b. Labor | $15,065.00 | |
| Total Cost Item 1.1a & 1.1b | $15,865.00 | |
| 1.2 | Inspection Phase 6 gives a list of tasks to be completed at the second dual inspection interval. The second dual inspection interval contains all Phase 3 and Phase 4 inspections, without duplicates. | Total Cost |
| a. Parts* | $800.00 | |
| b. Labor | $13,755.00 | |
| Total Cost Item 1.2a & 1.2b | $14,555.00 | |
| 1.3 | Inspection Phase 8 gives a list of tasks to be completed every 12 months. | Total Cost |
| a. Parts* | ||
| b. Labor | $1,965.00 | |
| Total Cost Item 1.3a & 1.3b | $1,965.00 | |
| 1.4 | Inspection Phase 9 gives a list of tasks to be completed every 1200 hours. | Total Cost |
| a. Parts* | ||
| b. Labor | $1,965.00 | |
| Total Cost Item 1.4a & 1.4b | $1,965.00 | |
| 1.5 | Inspection Phase 10 gives a list of tasks to be completed every 1000 cycles. | Total Cost |
| a. Parts* | ||
| b. Labor | $786.00 | |
| Total Cost Item 1.5a & 1.5b | $786.00 | |
| 1.6 | Inspection Phase 11 gives a list of tasks to be completed every 2400 hours or 30 months, whichever occurs first. | Total Cost |
| a. Parts* | $100.00 | |
| b. Labor | $1,572.00 | |
| Total Cost Item 1.6a & 1.6b | $1,672.00 | |
| 1.7 | Inspection Phase 12 gives a list of tasks to be completed every 24 months. | Total Cost |
| a. Parts* | ||
| b. Labor | $1,441.00 | |
| Total Cost Item 1.7a & 1.7b | $1,441.00 | |
| 1.8 | Inspection Phase 15 gives a list of tasks to be completed in accordance with the King Air Structural Inspection and Repair Manual (P/N 98-39006) that occur at the same inspection interval. Refer to the Table 201 Inspection Interval for Index Items (9), (12), and (13) in Chapter 57-18-02, 201. | Total Cost |
| a. Parts* AND SERVICES | $3,200.00 | |
| b. Labor | $4,192.00 | |
| Total Cost Item 1.8a & 1.8b | $7,392.00 | |
| 1.9 | Inspection Phase 25 gives a list of tasks to be completed at the first 200 flight hours on a new airplane / first 200 flight hours after new cable installation or rigging break initial, then every 48 months thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $3,144.00 | |
| Total Cost Item 1.9a & 1.9b | $3,144.00 | |
| 1.10 | Inspection Phase 29 gives a list of tasks to be completed at the first 200 flight hours, then every 1200 flight hours thereafter or any time the landing gear hydraulic system is contaminated. | Total Cost |
| a. Parts* | ||
| b. Labor | $65.50 | |
| Total Cost Item 1.10a & 1.10b | $65.50 | |
| 1.11 | Inspection Phase 31 gives a list of tasks to be completed at the first 600 flight hours, then every 18 months thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 1.11a & 1.11b | $524.00 | |
| 1.12 | Inspection Phase 32 gives a list of tasks to be completed every 2500 cycles until 10,000 cycles, then every 1000 cycles thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $5,895.00 | |
| Total Cost Item 1.12a & 1.12b | $5,895.00 | |
| 1.13 | Inspection Phase 33 gives a list of tasks to be completed 60 months after being placed in service but no longer than 63 months after date of manufacture. | Total Cost |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.13a & 1.13b | $131.00 | |
| 1.14 | Inspection Phase 34 gives a list of tasks to be completed at the first 72 months then every 12 months thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $786.00 | |
| Total Cost Item 1.14a & 1.14b | $786.00 | |
| 1.15 | Inspection Phase 35 gives a list of tasks to be completed 120 months from the date of manufacture. | Total Cost |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.15a & 1.15b | $131.00 | |
| 1.16 | Inspection Phase 36 gives a list of tasks to be completed in accordance with the applicable vendor manual. | Total Cost |
| a. Parts* | ||
| b. Labor | $786.00 | |
| Total Cost Item 1.16a & 1.16b | $786.00 | |
| 1.17 | Inspection Phase 37 gives a list of tasks to be completed in accordance with the crew oxygen mask manufacturer's component maintenance manual. | Total Cost |
| a. Parts* | ||
| b. Labor | $262.00 | |
| Total Cost Item 1.17a & 1.17b | $262.00 | |
| 1.18 | Inspection Phase 38 gives a list of tasks to be completed in accordance with the landing gear wheel manufacturer's component maintenance manual. | Total Cost |
| a. Parts* | ||
| b. Labor | $917.00 | |
| Total Cost Item 1.18a & 1.18b | $917.00 | |
| 1.19 | Inspection Phase 41 gives a list of tasks to be completed in accordance with 174095-SIL-1 or subsequent. | Total Cost |
| a. Parts* | ||
| b. Labor | $262.00 | |
| Total Cost Item 1.19a & 1.19b | $262.00 | |
| 1.20 | Inspection Phase 42 gives a list of tasks to be completed at the next scheduled inspection after wing installation, then every 12 months thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.20a & 1.20b | $131.00 | |
| 1.21 | Inspection Phase 43 gives a list of tasks to be completed every 800 flight hours or 24 months, whichever occurs first. | Total Cost |
| a. Parts* | ||
| b. Labor | $262.00 | |
| Total Cost Item 1.21a & 1.21b | $262.00 | |
| 1.22 | Inspection Phase 44 gives a list of tasks to be completed at the first 200 hours after installation. | Total Cost |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 1.22a & 1.22b | $524.00 | |
| 1.23 | Inspection Phase 45 gives a list of tasks to be completed every 6500 flight hours or 48 months, whichever occurs first, or after removal and installation. | Total Cost |
| a. Parts* | ||
| b. Labor | $393.00 | |
| Total Cost Item 1.23a & 1.23b | $393.00 | |
| 1.24 | Inspection Phase 46 gives a list of tasks to be completed every 2000 flight hours or 48 months, whichever occurs first. | Total Cost |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 1.24a & 1.24b | $524.00 | |
| 1.25 | Inspection Phase 51 gives a list of tasks to be completed in accordance with the King Air Structural Inspection and Repair Manual (P/N 98-39006) that occur at the same inspection interval. Refer to the Table 201 Inspection Interval for Index Item (11) in Chapter 57-18-02, 201. | Total Cost |
| a. Parts* | ||
| b. Labor | $262.00 | |
| Total Cost Item 1.25a & 61.25 | $262.00 | |
| 1.26 | Inspection Phase 52 gives a list of tasks to be completed in accordance with the King Air Structural Inspection and Repair Manual (P/N 98-39006) that occur at the same inspection interval. Refer to the Table 201 Inspection Interval for Index Item (8) in Chapter 57-18-02, 201. | Total Cost |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.26a & 1.26b | $131.00 | |
| 1.27 | Inspection Phase 53 gives a list of inspection tasks to be completed at the first 2500 cycles, then every 500 cycles thereafter. | Total Cost |
| a. Parts* | ||
| b. Labor | $2,620.00 | |
| Total Cost Item 1.27a & 1.28b | $2,620.00 |
| Pratt & Whitney Canada PT6A-60A Engine, Maintenance Manual - PT6A-60A/PT6A-60AG/PT6A-61 Issue No. 3034342 Revision & Date entered below, EMM 72.00.00 Table 601 Periodic Inspection items. | ||
| Revision: 61 Date: __Oct 09/2023___ | ||
| 1.29 | Cost of Table 601 Periodic Inspection; Interval MINOR item(s) | |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 1.29a & 1.29b | $524.00 | |
| 1.30 | Cost of Table 601 Periodic Inspection; Interval ROUTINE item(s) | |
| a. Parts* | $100.00 | |
| b. Labor | ||
| Total Cost Item 1.30a &1.30b | $100.00 | |
| 1.31 | Cost of Table 601 Periodic Inspection; Interval 200 Hour item(s) | |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.31a & 1.31b | $131.00 | |
| 1.32 | Cost of Table 601 Periodic Inspection; Interval 200 Hour or 6 months item(s) | |
| a. Parts* | $40.00 | |
| b. Labor | $131.00 | |
| Total Cost Item 1.32a & 1.32b | $171.00 | |
| 1.33 | Cost of Table 601 Periodic Inspection; Interval 300 Hours Item(s) | |
| a. Parts* | $120.00 | |
| b. Labor | $1,310.00 | |
| Total Cost Item 1.33a & 1.33b | $1,430.00 | |
| 1.34 | Cost of Table 601 Periodic Inspection; Interval 600 Hours Item(s) | |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 1.34a &1.34b | $131.00 | |
| 1.35 | Cost of Table 601 Periodic Inspection; Interval 600 Hours or 12 months Item(s) | |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 1.35a & 1.35b | $524.00 | |
| 1.36 | Cost of Table 601 Periodic Inspection; Interval 1000 Hours Item(s) | |
| a. Parts* | $1,650.00 | |
| b. Labor | $393.00 | |
| Total Cost Item 1.36a & 1.36b | $2,043.00 | |
| 1.37 | Cost of Table 601 Periodic Inspection; Interval 1800 Hours Item(s) | |
| a. Parts* | $25.00 | |
| b. Labor | $2,096.00 | |
| Total Cost Item 1.37a & 1.37b | $2,121.00 |
| Total cost of Inspections on a B200GT Series Serial Number BY183 per Beechcraft King Air 200 Series Maintenance Manual 101-590010-19. Revision & Date entered below; | ||
| Revision: E3, Revision Date: Aug 1, 2023 | ||
| 2.1 | Total cost of a Phase 1 & 2 inspection on a KingAir B200GT Serial Number BY183 | Total Cost |
| a. Parts* | $850.00 | |
| b. Labor | $11,790.00 | |
| Total Cost Item 2.1a & 2.1b | $12,640.00 | |
| 2.3 | Total cost of a Phase 3 & 4 inspection on a KingAir B200GT Serial Number BY183 | Total Cost |
| a. Parts* | $850.00 | |
| b. Labor | $11,790.00 | |
| Total Cost Item 2.3a & 2.3b | $12,640.00 |
| Pratt & Whitney Canada PT6A-52 Engine, Maintenance Manual Issue No. 3072862 Revision & Date entered below, EMM 72.00.00 Table 601 Periodic Inspection items. | ||
| Revision: _28_ Date: Oct 09/2023 | ||
| 2.4 | Cost of Table 601 Periodic Inspection; Interval MINOR item(s) | |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 2.4a & 2.4b | $524.00 | |
| 2.5 | Cost of Table 601 Periodic Inspection; Interval ROUTINE item(s) | |
| a. Parts* | $100.00 | |
| b. Labor | ||
| Total Cost Item 2.5a & 2.5b | $100.00 | |
| 2.6 | Cost of Table 601 Periodic Inspection; Interval 200 Hour item(s) | |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 2.6a & 2.6b | $131.00 | |
| 2.7 | Cost of Table 601 Periodic Inspection; Interval 200 Hour or 6 months item(s) | |
| a. Parts* | $40.00 | |
| b. Labor | $131.00 | |
| Total Cost Item 2.7a & 2.7b | $171.00 | |
| 2.8 | Cost of Table 601 Periodic Inspection; Interval 600 Hours Item(s) | |
| a. Parts* | ||
| b. Labor | $131.00 | |
| Total Cost Item 2.8a & 2.8b | $131.00 | |
| 2.9 | Cost of Table 601 Periodic Inspection; Interval 600 Hours or 12 months Item(s) | |
| a. Parts* | ||
| b. Labor | $524.00 | |
| Total Cost Item 2.9a & 2.9b | $524.00 | |
| 2.10 | Cost of Table 601 Periodic Inspection; Interval 1000 Hours Item(s) | |
| a. Parts* | $1,650.00 | |
| b. Labor | $393.00 | |
| Total Cost Item 2.10a & 2.10b | $2,043.00 | |
| ** All Parts pricing submitted shall be inclusive of all oill needed to preform the service, where applicable. |
File details come from the government source that posted it. Updated .