191S7025D0004 USG Global LLC.pdf

PDF 1 MB Posted

Attached to
Residential Interior Painting Services on behalf of United States Embassy in Jerusalem Israel
Solicitation number
191S7025D0004
Issued by

About this file

This is a Solicitation, Offer, and Award document for residential painting services for the U.S. Embassy in Tel Aviv and Jerusalem, Israel. The contract is an indefinite-delivery, indefinite-quantity (IDIQ) type with a base year and four one-year option periods, covering painting services for various residential property types ranging from small apartments to large houses. The total estimated contract value is approximately NIS 27,337,650 (New Israeli Shekel), with separate pricing for Tel Aviv (NIS 10,434,150) and Jerusalem (NIS 16,903,500) locations.

The contract includes detailed pricing for different residential property types categorized by size and complexity, from two-bedroom apartments to six-bedroom houses. Painting services encompass interior painting, drywall/plaster repair, texturing, and additional services like painting window bars, doors, and balconies. The contractor must follow specific painting standards, use high-quality latex and oil-based paints, and comply with safety and preparation requirements. The contract has a minimum order of $5,000 and a maximum of $300,000 per performance period, with the contractor required to begin work within 10 calendar days of award and complete tasks within 4-8 working days depending on the property type.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER

PR9760339

6. PROJECT NUMBER

7. ISSUED BY CODE 191S70

AMERICAN EMBASSY JERUSALEM

14 DAVID FLUSSER STREET,

ATTN: GSO/PROCUREMENT

ISRAEL

8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME

Sarit Baranes

b. E-mail Address (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

04/16/2018

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

X x

AMERICAN EMBASSY JERUSALEM

EMBASSY BRANCH OFFICE TEL AVIV

71 HAYARKON STREET,

ATTN: GSO/PROCUREMENT TEL AVIV 63903

ISRAEL

x

3. DATE ISSUED

If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

191S7025R0002

PR15062616

copies to perform the work required are due at the place specified in Item by 12:00am local time TBD

PAGE 1 OF 74 PAGES

30 April, 2025

BaranesSX@State.gov

Residential painting service for the Tel Aviv area and Jerusalem area in accordance to section 1 of the solicitation

0001 Total Estimated Amount for Base Year – Tel Aviv NIS 0002 Total Estimated Amount for Base Year - Jerusalem NIS 1001 Total Estimated Amount for 1st Option Year – Tel Aviv NIS 1002 Total Estimated Amount for 1st Option Year - Jerusalem NIS 2001 Total Estimated Amount for 2nd Option Year – Tel Aviv NIS 2002 Total Estimated Amount for 2nd Option Year - Jerusalem NIS 3001 Total Estimated Amount for 3rd Option Year – Tel Aviv NIS 3002 Total Estimated Amount for 3rd Option Year - Jerusalem NIS 4001 Total Estimated Amount for 4th Option Year – Tel Aviv NIS 4002 Total Estimated Amount for 4th Option Year - Jerusalem NIS 5001 52.217-8 6-Months Tel Aviv NIS 5002 52.217-8 6-Months Jerusalerm NIS

VAT 18% NIS

3.7.A GRAND TOTAL FOR OPTION A (TEL AVIV) BASE + ALL OPTION YEARS NIS

3.7.B GRAND TOTAL FOR OPTION B (JERUSALEM) BASE + ALL OPTION YEARS NIS

3.7.C GRAND TOTAL FOR BASE + ALL OPTION YEARS NIS

1,768,500 2,865,000 1,768,500 2,865,000 1,768,500 2,865,000 1,768,500 2,865,000 1,768,500 2,865,000

970,400 1,496,500

5,444,747

10,434,150 16,903,500

27,337,650

191S7025D0004

BenEliRR Highlight

BenEliRR Highlight

TABLE OF CONTENTS

Section 1 - The Schedule

• SF 1442 cover sheet

• Continuation To SF-1442, CONTRACT Number 191S7025D0004, Prices, Block 23

• Continuation To SF-1442, CONTRACT Number 191S7025D0004, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Statement of Work, Government Furnished

Property

Section 2 - Contract Clauses

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

191S7025D0004 Residential Painting Services – USG Global LLC

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1442

CONTRACT NUMBER 191S7025D0004

PRICES, BLOCK 10

1. SCOPE OF SERVICES

A. The contractor shall furnish painting, drywall/plaster repair, and related services for real property owned or managed by the U.S. Embassy Jerusalem in accordance with Section 1

Description/Specifications/Work Statement.

B. The Government will order all work by issuing task orders.

C. This is an indefinite-delivery indefinite-quantity type contract under which may be placed firm-fixed price task orders.

2. CONTRACT PRICE - GENERAL

A. The Contractor shall complete all work, including furnishing all labor, material, equipment and services, required under this contract, for painting services. This price listed below shall include all labor, materials, overhead (including cost of Workers’ Compensation and War-

Hazard Insurance, which shall not be a direct reimbursement) and profit.

B. All prices are in local currency and the Government will make payment in local currency.

C. VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates.

Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:

3. PRICING

BASE YEAR PERIOD

A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months.

The fixed unit prices, estimated quantities, and ceiling for each category are:

3.0001 LOCATION A

Residential painting service for the Tel Aviv area (within a 40 klm radius of the municipal Tel

Aviv area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 15 247,500

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 15 232,500

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm ea 13,000 7 91,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm ea 10,000 10 100,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 9,500 5 47,500

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm ea 9,500 30 285,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm ea 8,500 15 127,500

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 80sqm up to 90 sqm ea 8,500 10 85,000

0019 Type J – Additional Bedroom ea 900 50 45,000

00110 Type K – Additional Bathroom ea 800 10 8,000

00111 Type L – Painting window bar – 1 Sqm Sqm 250 1000 250,000

00112 Type M – Painting Door and Door frame ea 550 300 165,000

00113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 15 4,500

00114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 200 50,000

00115 Type P - Painting closed balcony ea 1500 20 30,000

0001 Total Estimated Amount 1,768,500

VAT 18% 318,330

Total Estimated Amount for Base Year – Tel Aviv 2,086,830

3.0002 LOCATION B

Residential painting service for the Jerusalem area (within a 40 klm radius of the municipal

Jerusalem area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 8 132,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 4 62,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm ea 14,500 7 101,500

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm ea 12,000 9 108,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,500 16 184,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm ea 11,500 3 34,500

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm ea 9,500 7 66,500

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110 sqm up to 130 sqm ea 9,750 30 292,500

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130 sqm up to 160 sqm

10,500 19 199,500

00210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 160 sqm up to 190 sqm ea 12,500 12 150,000

00211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 190 sqm up to 210 sqm ea 13,000 3 39,000

00212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 80sqm up to 90 sqm ea 9,500 2 19,000

00213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90sqm up to 110 sqm ea 10,000 4 40,000

00214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130 sqm ea 10,500 6 63,000

00215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 150 sqm ea 11,000 6 66,000

00216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

Size:from 80sqm up to 110 sqm ea 9,000 4 36,000

00217 Type J – Additional Bedroom ea 900 70 63,000

00218 Type K – Additional Bathroom ea 750 20 15,000

00219 Type L – Painting window bar – 1 Sqm Sqm 250 1500 375,000

00220 Type M – Painting Door and Door frame ea 550 650 357,500

00221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 40 16,000

00222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 800 320,000

00223 Type P - Painting closed balcony ea 2500 50 125,000

0002 Total Estimated Amount 2,865,000

VAT 18% 515,700

Total Estimated Amount for Base Year - Jerusalem 3,380,70016

B. Contract Minimum and Maximum Amounts

1. Contract Minimum during the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of performance.

2. Contract Maximum during the contract period, the amount of all orders shall not exceed

$300,000. This is the contract maximum for this period of performance.

3.1 FIRST OPTION YEAR PERIOD

A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months. The fixed unit prices, estimated quantities, and ceiling for each category are:

3.1001 LOCATION A

Residential painting service for the Tel Aviv area (within a 40 klm radius of the municipal Tel

Aviv area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 15 247,500

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 15 232,500

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm ea 13,000 7 91,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm ea 10,000 10 100,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 9,500 5 47,500

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm ea 9,500 30 285,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 80sqm up to 90 sqm ea 8,500 10 85,000

0119 Type J – Additional Bedroom ea 900 50 45,000

01110 Type K – Additional Bathroom ea 800 10 8,000

01111 Type L – Painting window bar – 1 Sqm Sqm 250 1000 250,000

01112 Type M – Painting Door and Door frame ea 550 300 165,000

01113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 15 4,500

01114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 200 50,000

01115 Type P - Painting closed balcony ea 1,500 20 30,000

1001 Total Estimated Amount 1,768,500

Total Estimated Amount for 1st Option Year – Tel Aviv 2,086,830

3.1002 LOCATION B

Residential painting service for the Jerusalem area (within a 40 klm radius of the municipal

Jerusalem area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 8 132,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 4 62,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm

14,500 7 101,500

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm

12,000 9 108,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,500 16 184,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm

11,500 3 34,500

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm

9,500 7 66,500

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110 sqm up to 130 sqm

9,750 30 292,500

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130 sqm up to 160 sqm

01210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

12,500 12 150,000

Size:from 160 sqm up to 190 sqm

01211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 190 sqm up to 210 sqm ea 13,000 3 39,000

01212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 80sqm up to 90 sqm ea 9,500 2 19,000

01213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90sqm up to 110 sqm ea 10,000 4 40,000

01214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130 sqm ea 10,500 6 63,000

01215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 150 sqm ea 11,000 6 66,000

01216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

Size:from 80sqm up to 110 sqm ea 9,000 4 36,000

01217 Type J – Additional Bedroom ea 900 70 63,000

01218 Type K – Additional Bathroom ea 750 20 15,000

01219 Type L – Painting window bar – 1 Sqm Sqm 250 1500 375,000

01220 Type M – Painting Door and Door frame ea 550 650 357,500

01221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 40 16,000

01222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 800 320,000

01223 Type P - Painting closed balcony 2500 50 125,000

1002 Total Estimated Amount 2,865,000

VAT 18% 515,700

Total Estimated Amount for 1st Option Year - Jerusalem 3,380,700

B. Contract Minimum and Maximum Amounts

1. Contract Minimum during the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of performance.

3.2 SECOND OPTION YEAR PERIOD

A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months.

The fixed unit prices, estimated quantities, and ceiling for each category are:

3.2001 LOCATION A

Residential painting service for the Tel Aviv area (within a 40 klm radius of the municipal Tel

Aviv area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 15 247,500

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 15 232,500

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm ea 13,000 7 91,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm ea 10,000 10 100,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 9,500 5 47,500

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm ea 9,500 30 285,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm ea 8,500 15 127,500

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

8,500 10 85,000

Size:from 80sqm up to 90 sqm

0219 Type J – Additional Bedroom ea 900 50 45,000

02110 Type K – Additional Bathroom ea 800 10 8,000

02111 Type L – Painting window bar – 1 Sqm Sqm 250 1000 250,000

02112 Type M – Painting Door and Door frame ea 550 300 165,000

02113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 15 4,500

02114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 200 50,000

02115 Type P - Painting closed balcony ea 1500 20 30,000

2001 Total Estimated Amount 1,768,500

Total Estimated Amount for 2nd Option Year – Tel Aviv 2,086,830

3.2002 LOCATION B

Residential painting service for the Jerusalem area (within a 40 klm radius of the municipal

Jerusalem area)

Contract

Line-Item

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 8 132,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 4 62,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 200sqm up to 240sqm ea 14,500 7 101,500

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Size:from 170sqm up to 200sqm ea 12,000 9 108,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,500 16 184,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130sqm ea 11,500 3 34,500

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90 sqm up to 110 sqm ea 9,500 7 66,500

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110 sqm up to 130 sqm ea 9,750 30 292,500

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130 sqm up to 160 sqm ea 10,500 19 199,500

02210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 160 sqm up to 190 sqm

02211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 190 sqm up to 210 sqm

13,000 3 39,000

02212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 80sqm up to 90 sqm

9,500 2 19,000

02213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 90sqm up to 110 sqm

10,000 4 40,000

02214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 110sqm up to 130 sqm

10,500 6 63,000

02215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 150 sqm

11,000 6 66,000

02216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

Size:from 80sqm up to 110 sqm

9,000 4 36,000

02217 Type J – Additional Bedroom ea 900 70 63,000

02218 Type K – Additional Bathroom ea 750 20 15,000

02219 Type L – Painting window bar – 1 Sqm Sqm 250 1500 375,000

02220 Type M – Painting Door and Door frame ea 550 650 357,500

02221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 40 16,000

02222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 800 320,000

02223 Type P - Painting closed balcony ea 2,500 50 125,000

2002 Total Estimated Amount 2,865,000

VAT 18% 515,700

Total Estimated Amount for 2nd Option Year - Jerusalem 3,380,700

B. Contract Minimum and Maximum Amounts

1. Contract Minimum during the contract period, the Government shall place orders for a minimum of $5,000. This is the contract minimum for this period of performance.

3.3 THIRD OPTION YEAR PERIOD

A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months.

The fixed unit prices, estimated quantities, and ceiling for each category are:

3.3001 LOCATION A

Residential painting service for the Tel Aviv area (within a 40 klm radius of the municipal Tel

Aviv area)

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 15 247,500

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 15 232,500

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

13,000 7 91,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

10,000 10 100,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 9,500 5 47,500

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

9,500 30 285,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

0319 Type J – Additional Bedroom ea 900 50 45,000

03110 Type K – Additional Bathroom ea 800 10 8,000

03111 Type L – Painting window bar – 1 Sqm Sqm 250 1000 250,000

03112 Type M – Painting Door and Door frame ea 550 300 165,000

03113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 15 4,500

03114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 200 50,000

03115 Type P - Painting closed balcony 1500 20 30,000

3001 Total Estimated Amount 1,768,500

Total Estimated Amount for 3rd Option Year – Tel Aviv 2,086,830

3.3002 LOCATION B

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 8 132,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 4 62,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,500 16 184,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two

03211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

03216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

03217 Type J – Additional Bedroom ea 900 70 63,000

03218 Type K – Additional Bathroom ea 750 20 15,000

03219 Type L – Painting window bar – 1 Sqm Sqm 250 1500 375,000

03220 Type M – Painting Door and Door frame ea 550 650 357,500

03221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 40 16,000

03222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 800 320,000

03223 Type P - Painting closed balcony ea 2500 50 125,000

3002 Total Estimated Amount 2,865,000

Total Estimated Amount for 3rd Option Year - Jerusalem 3,380,700

1. Contract Maximum during the contract period, the amount of all orders shall not exceed

3.4 FOURTH OPTION YEAR PERIOD

A. The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to Proceed and continuing for a period of 12 months.

The fixed unit prices, estimated quantities, and ceiling for each category are:

3.4001 LOCATION A

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 15 247,500

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 15 232,500

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

13,000 7 91,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

10,000 10 100,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 9,500 5 47,500

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

9,500 30 285,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

0419 Type J – Additional Bedroom ea 900 50 45,000

04110 Type K – Additional Bathroom ea 800 10 8,000

04111 Type L – Painting window bar – 1 Sqm Sqm 250 1000 250,000

04112 Type M – Painting Door and Door frame ea 550 300 165,000

04113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 15 4,500

04114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 200 50,000

04115 Type P - Painting closed balcony 1500 20 30,000

4001 Total Estimated Amount 1,768,500

Total Estimated Amount for 4th Option Year – Tel Aviv 2,086,830

3.4002 LOCATION B

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 16,500 8 132,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 15,500 4 62,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,500 16 184,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

04216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

04217 Type J – Additional Bedroom ea 900 70 63,000

04218 Type K – Additional Bathroom ea 750 20 15,000

04219 Type L – Painting window bar – 1 Sqm Sqm 250 1500 375,000

04220 Type M – Painting Door and Door frame ea 550 650 357,500

04221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 40 16,000

04222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 800 320,000

04223 Type P - Painting closed balcony ea 2,500 50 125,000

4002 Total Estimated Amount 2,865,000

Total Estimated Amount for 4th Option Year - Jerusalem 3,380,700

3.5 52.217-8 OPTION TO EXTEND SERVICE (6-MONTHS Period of Performance)

RESERVED

The period of performance is from the expiration date of the 4th option year and continuing for

6-months, if the Contracting Officer determines it is in the best interest of the Government to exercise FAR 52.217-8 Option to Extend Services. NOTE: Prices in this 6-months period of performance are to be used for evaluation of total proposed price purposes ONLY and will not be included in the total price of the award in the contract.

3.5001 LOCATION A

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity Tel Aviv

Estimated

Total in NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 17,000 8 136,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 16,000 8 128,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

14,000 4 56,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

12,000 5 60,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 11,000 3 33,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

10,000 15 150,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

9,500 8 76,000

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

9,000 5 45,000

0519 Type J – Additional Bedroom ea 1,000 25 25,000

05110 Type K – Additional Bathroom ea 800 5 4,000

05111 Type L – Painting window bar – 1 Sqm Sqm 250 500 125,000

05112 Type M – Painting Door and Door frame ea 600 150 90,000

05113 Type N – Painting wooden window (Glass, screen and shutter) ea 300 8 2,400

05114 Type O – Painting metal/wood fence – 1 Sqm Sqm 250 100 25,000

05115 Type P - Painting closed balcony ea 1500 10 15,000

5001 Total Estimated Amount 970,400

VAT 18% 174,672

52.217-8 Option To Extend Service Total -EBO 10,145,072

3.5002 LOCATION B

Number

Description of Service Unit

Unit

Price

NIS

Estimated

Quantity

Jerusalem

Estimated Total in

NIS

Painting Residential Building Interior

Type A - Six bedrooms, huge living room, dining room, kitchen, basement, staircase with railing, hallway, four bathrooms, one guest toilet.

Size: from 270 sqm up to 300 sqm ea 17,000 4 68,000

Type B - Six bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

Size: from 240sqm up to 270sqm ea 16,000 2 32,000

Type C - Five bedrooms, living room, dining room, kitchen, staircase with railing, hallway, three bathrooms and one guest toilet.

15,000 4 60,000

Type D - Four bedrooms, living room, dining room, kitchen, basement, staircase with railing, hallway, two bathrooms, one guest toilet.

13,000 5 65,000

Type E – Duplex apartment with two floors:

Four bedrooms living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Size:from 130sqm up to 160sqm ea 12,000 8 96,000

Type F – Apartment: Four bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

12,000 2 24,000

Type G – Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

Type G1 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

10,000 15 150,000

Type G2 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

11,000 10 110,000

05210

Type G3 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two

13,000 6 78,000

2805211

Type G4 - Apartment: Three bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

14,000 2 28,000

05212

Type H – Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

10,000 1 10,000

05213

Type H1- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

11,000 2 22,000

05214

Type H2- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

12,000 3 36,000

05215

Type H3- Apartment: Two bedrooms, living room, dining room, kitchen, hallway, two bathrooms, one guest toilet.

05216

Type I- Apartment: One bedroom, living room, dining room, kitchen, hallway, one bathroom, one guest toilet.

10,000 2 20,000

05217 Type J – Additional Bedroom ea 1000 35 35,000

05218 Type K – Additional Bathroom ea 800 10 8,000

05219 Type L – Painting window bar – 1 Sqm Sqm 250 750 187,500

05220 Type M – Painting Door and Door frame ea 600 325 195,000

05221 Type N – Painting wooden window (Glass, screen and shutter) ea 400 20 8,000

05222 Type O – Painting metal/wood fence – 1 Sqm Sqm 400 400 160,000

05223 Type P - Painting closed balcony ea 2,500 10 25,000

5002 Total Estimated Amount 1,496,500

VAT 18% 269,370

52.217-8 Option To Extend Service Total 1,765,870

3.6 TOTAL CONTRACT PRICE

0001 Total Estimated Amount for Base Year – Tel Aviv NIS 1,768,500

0002 Total Estimated Amount for Base Year - Jerusalem NIS 2,865,000

1001 Total Estimated Amount for 1st Option Year – Tel Aviv NIS 1,768,500

1002 Total Estimated Amount for 1st Option Year - Jerusalem NIS 2,865,000

2001 Total Estimated Amount for 2nd Option Year – Tel Aviv NIS 1,768,500

2002 Total Estimated Amount for 2nd Option Year - Jerusalem NIS 2,865,000

3001 Total Estimated Amount for 3rd Option Year – Tel Aviv NIS 1,768,500

3002 Total Estimated Amount for 3rd Option Year - Jerusalem NIS 2,865,000

4001 Total Estimated Amount for 4th Option Year – Tel Aviv NIS 1,768,500

4002 Total Estimated Amount for 4th Option Year - Jerusalem NIS 2,865,000

VAT 18% NIS 4,170,150

3.7.A

GRAND TOTAL FOR OPTION A (TEL AVIV) BASE

+ ALL OPTION YEARS

NIS 10,434,150

3.7.B

GRAND TOTAL FOR OPTION B (JERUSALEM)

BASE + ALL OPTION YEARS

NIS 16,903,500

3.7.C GRAND TOTAL FOR BASE + ALL OPTION YEARS NIS 27,337,650

SECTION 1 - DESCRIPTION/SPECIFICATIONS

STATEMENT OF WORK

4. CHARACTER AND SCOPE OF WORK

The Contractor shall furnish and apply all materials required by this contract, unless the contract states that materials and equipment will be provided by or work performed by the

Government or by others under separate contracts.

5. SURVEY

The Contractor shall survey the property and verify the work required against the task order before beginning work, to determine if any discrepancies exist. The Contractor shall be responsible for any errors that might have been avoided by such a survey/review. The

Contractor shall immediately report any discrepancies to the COR or the Contracting Officer and shall not begin work until such matters are resolved.

6. APPLICABLE PAINTING STANDARDS/PAINT SPECIFICATIONS

Painting and preparatory work shall match the paint to similar adjacent materials or surfaces. The following paint specifications will apply, unless notified otherwise by the COR:

• For all rooms, kitchens, laundry areas and patio: high-quality, semi-gloss, “SuperCryl” or “Nirocryl” latex paint; manufactured by Tambur or Nirlat, or similar.

• For bathrooms, walls and ceilings: Mold and Mildew proof White “Parma” paint or similar.

• For wood or metal: semi-glossy, oil-based paint.

• For all ceiling except of bathrooms: Non latex, non-plastic paint typically known as “Policid” or similar.

7. PREPARATION/PROTECTION OF WORK AREA

Painting shall not disturb or damage any fixed property (including light fixtures, floors, carpets, or windows). The Contractor shall move, protect and return such property to its original position upon completion of work in that area.

The Contractor shall first remove or protect furnishings (such as furniture and rugs) by appropriate covering. The Contractor shall protect floors from soiling and paint spills. Wooden floors shall not be washed under any circumstances. To protect floors (of all types) from damage, the Contractor shall use a suitable protective cover. The Contractor shall also equip ladders and scaffolding with clean rubber shoes or similar protection devices.

If the Contractor spills any paint, or in any way soils the floors, the Contractor shall clean up using a specialist floor finishing company at the Contractor's expense. After completion of the painting work, the Contractor shall return all furnishings to their original position and clean the work area free of litter and debris.

8. UTILITIES

The Government cannot ensure that utilities will be available at all properties at all times.

The Contractor shall have an alternate source of power (generator) available if needed to ensure that paint will be applied following the manufacturer's specifications. The Contractor shall not adjust the heating or air conditioning controls in properties with utilities turned on to maintain temperature. The Contractor shall have its own source of water available for clean up if water has been turned off in the property for winterization of the plumbing system.

9. EQUIPMENT

The Contractor shall provide all necessary painting supplies and equipment, including brushes, rollers, buckets, mixers, space heaters, drop cloths, scrapers, sanding gear, electric sprayers, and texture sprayers if necessary to perform the work. The Government will not furnish any materials.

10. WARRANTY

The warranty shall be valid for 1 year after the final inspection. During the warranty period, the Contractor shall repair or replace, free of charge, any occurring defects or ensuing damages. If the Contractor fails to do so after receipt of a written request to that effect, the

Government may have such discrepancies remedied at the Contractor's expense.

11. TECHNICAL SPECIFICATIONS FOR PAINTING WORK

a. Interior and Exterior Painting

Paint surfaces as directed by the task order. Match paint to similar adjacent materials or surfaces.

(1) Paint: This category includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats.

(2) Product Data: The Contractor shall submit manufacturer's technical information, label analysis, and application instructions to the COR for each paint material proposed for use, prior to starting work. The Contractor shall list each material and cross-reference specific coating and finish system and application as an attachment to the above submittal. The Contractor shall identify each material by the manufacturer's catalog number and general classification.

(3) Single Source Responsibility: The Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats.

(4) Material Quality: The Contractor shall provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification are not acceptable.

(5) Material Delivery: The Contractor shall deliver materials to the job site in manufacturer's original, unopened packages and the containers shall bear the manufacturer's name and label with trade name and manufacturer's instructions.

(6) Material Storage: The Contractor shall store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of

45 degrees F (7 degrees C). The Contractor shall protect materials from freezing and keep storage area neat and orderly. Contractor shall remove oily rags and waste daily.

(7) Project Conditions: The Contractor shall not apply paint when the relative humidity exceeds 85 percent, or at temperatures less than 5 degrees F (3 degrees

C) above the dew point, or to damp or wet surfaces. The Contractor shall apply paint only in temperatures that comply with the manufacturer's specifications.

(8) Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected.

(9) Preparation:

(a) The Contractor shall remove hardware and hardware accessories, plates, light fixtures, and items in place that are not to be painted, or provide protection such as taping, prior to surface preparation and painting. (Taping includes windows, door jams, etc.)

(b) The Contractor shall clean and prepare surfaces to be painted following the manufacturer's instructions before applying paint or surface treatments. This preparation includes removal of oil, dust, direct, loose rust, mildew, peeling paint or other contamination to ensure good adhesion. In some cases, the Contractor may be requested to remove all existing coats of paint and sealers if prior paint application is showing signs of improper adhesion, such as peeling, chipping, etc.

All surfaces must be clean and dry. The Contractor shall schedule cleaning and painting so dust and other contaminants will not fall on wet, newly painted

(c) The Contractor shall notify the Contracting Officer or COR of problems anticipated for any minor preparatory work required, such as but not limited to, filling nail holes, cleaning surfaces to be painted, and priming any requisite areas.

Plan preparatory work as most units in residential areas will have nail holes or areas that will need to be primed or sealed. Replace all electrical covers with new covers after painting.

(10) Materials Preparation: The Contractor shall mix and prepare paint following the manufacturer's directions.

(11) Application: The Contractor shall apply paint following the manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

(a) Unless otherwise specified, the Contractor shall use Tambor Polyceed

White semi-gloss latex paint (free of lead and mercury) for all kitchens, bathrooms, laundry areas, door frames, and window frames. For the remainder of the unit, the Contractor shall use Tambor Supercryl 2000 White matt flat or satin flat latex base paint (also free of lead and mercury). The standard color shall be

WHITE for all leased units - EVEN those that currently have colored walls, with exceptions for color paint made on a case-by-case basis as approved by the

Contracting Officer's Representative (COR). The Contractor must provide samples of the chosen color on the specific type of material to be painted before the scheduled painting date.

(b) On exterior surfaces, the Contractor shall apply a high-quality exterior grade latex base paint that matches as closely as possible the existing color on the exterior of the property, or a color as otherwise specified by the COR. Prior to painting, the Contractor shall scrape, sand, fill, and prime the surface with a latex base primer. The Contractor should plan on extensive preparatory work prior to painting. The Contractor shall not apply exterior paint in snow, rain, fog or mist, or when the relative humidity exceeds 85 percent; or to damp or wet surfaces.

(c) The Contractor shall provide finish coats that are compatible with primers used.

(d) The number of coats and film thickness required is the same regardless of application method. The Contractor shall not apply succeeding coats until previous coat has cured. The Contractor shall sand between applications where required to produce a smooth, even surface.

(e) The Contractor shall apply additional coats when undercoats or other conditions show through final coat, until paint film is of uniform finish, color, and appearance.

(12) Scheduling Painting: The Contractor shall apply the first coat to surfaces that have been cleaned, pretreated or otherwise…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .