191N6526Q0026-A0001.pdf

PDF 4 MB Posted

Attached to
Demolition of Cavity Wall complete with labor and material
Solicitation number
191N6526Q0026-A0001
Issued by

About this file

This is an Amendment of Solicitation/Modification of Contract (SF-30) issued by the American Embassy New Delhi on March 30, 2026, with an effective date of April 7, 2026. Amendment No. A001 clarifies and updates solicitation requirements related to demolition work at the embassy facility.

The amendment details sixteen contractor responsibilities for the demolition project, focusing on wall and toilet demolition, fixture disposal, floor protection, and dust control measures. Key requirements include: contractors must demolish walls and toilets while disposing of all fixtures; remove and return doors with frames to USG after safely extracting them; remove and dispose of all wardrobe items; protect the second floor and newly laid ground floor from damage during material hauling; protect balcony railing near sliding gates from discharge debris; implement dust protection measures to prevent dust migration to adjoining areas; bring portable toilets connected to existing sanitary lines; bring hydraulic jacks for initial demolition phases; and protect all ducts, services, and existing infrastructure from bathrooms. The amendment specifies that ground floor operations will experience weekly interruptions for approximately four hours due to events, and establishes specific square footage measurements: 450 square feet for low-height corridor ceilings and 400 square feet for low-height bathroom ceilings. The amendment prohibits heavy hammering or vibration-producing activities during the work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .