AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE RATING
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06/04/2018
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
IBWC_CODE
International Boundary and Water Commission
(IBWC)
USIBWC - ACQUISITIONS DIV
4171 NORTH MESA, STE. C100
EL PASO, TX 79902-1441
Philip Johnson
NAME
TEL.
johnsonpk@state.gov
6. ISSUED BY IBWC_CODE
International Boundary and Water Commission (IBWC)
USIBWC - ACQUISITIONS DIV
4171 NORTH MESA, STE. C100
EL PASO, TX 79902-1441
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NO.
191BWC18B0003
CONTACT DUNS
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
05/15/2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__1__X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate the sign-in sheets from the site visits and post questions and answers.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Philip Johnson
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
191BWC18B0003
Questions and Answers page 2 of 7
(1) Pipe specifications?
Schedule 80 stainless steel piping.
(2) Oxygen levels 190 -foot down the 4 feet by 24-foot Penstock gate slot? Didn’t know.
Plan to proceed is to send down a quad gas and oxygen meter before sending any personnel down the slot.
Vendor shall test oxygen level before sending workers down the well. Before issuing Notice to Proceed, USIBWC will be verifying this among other measures in the vendor's safety plan.
(3) Work schedule? Was flexible, if we needed to work more hours to let them know.
This is to be coordinated with the COR during the execution phase.
(4) Is the piping threaded or welded? Went out to the site and found out it was all socket weld with exception where it ties in to equipment.
Vendor verified during site visit.
(5) Starting point to begin pipe replacement? It was pointed out indicating a set of unions on top by power source.
Confirmed
(6) Hydro testing pressure?
Test piping to ASME B31 Pressure Piping Code.
(7) Hydro Test media to be used? Hydraulic oil Confirmed.
(8) Customer will provide crane to lower and to bring up all equipment in and from gate opening area where we will fabricate before sending it further down the 190 -foot for the 4 feet by 24-foot Penstock gate slot.
Confirmed. USIBWC contribution is limited to lowering equipment and material down the slot at mobilization; and lifting them out at the end of the service. Everything else is the responsibility of the vendor; including ensuring that the material/ equipment can fit within the slot opening.
(9) Does Tripple S Oilfield & Construction LLC. Need to purchase pipe and fittings?
Yes. Vendor shall purchase all material and equipment including piping fittings and hydraulic fluid.
1. Can the socket welded pipe be replaced with hydraulic tubing?
You may propose hydraulic tubing in your offer. Please provide technical details to enable evaluation.
2. Do you want all clamps replaced with stainless steel clamps, and do you have a specific style of clamps you want us to use? The clamps that are currently installed are rusted and an old style.
We expect the new clamps to be similar to the old ones; however we will consider any other proposed style.
Clamps should be stainless steel to avoid Galvanic Corrosion.
3. Do you know the working pressure of the system?
The working pressure is 2500 psi as shown in the attached highlighted extract from the O&M Manual. As stated in response to another vendor, piping shall be schedule 80; and the piping shall be tested to ASME
B31 pressure piping code.
4. We will be doing all the work from ropes, and the “Scope of Work” says that your staff should be able to use all the equipment to access the pit. You would need to have a rope certified person to be able to go down on the ropes. There are other ways to access the pit, but it will add a cost to the bid. Please advise.
USIBWC may opt not to send anyone down the pit. Any employee (or other representative) accessing the pit shall be certified in using the equipment.
| 191BWC18B0003 A003.pdf |
| 191BWC18B0003 A003.pdf |
| Penstock 5 Measurements - Service Bay Plan View.pdf |
| Extract from OnM Manual - Penstock 5_1.pdf |
| Questions and Answers page 2 of 3.pdf |
Pre Offers Meeting and Site Visit.pdf