BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ACQUISITION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| ACQUISITION | $0.00 |
| SITE DEMOLITION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Acquisition, Site Demolition, Profit & Overhead, and Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in the RFB. | |
| 5) Vendor must provide Construction Management Costs and Profit & Overhead Costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per work phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. | |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
108 Stoney Creek Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 108 Stoney Creek Lane |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7383 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7383 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7386 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7386 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7388 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7388 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7390 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7390 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7391 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7391 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7392 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7392 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7394 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7394 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7395 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7395 Ruby Stone Ct |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7397 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7397 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
7399 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | 7399 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-114 Stoney Creek Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | OPTIONED - 114 Stoney Creek Lane |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-7384 Ruby Stone Ct
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4837 | STREET ADDRESS: | OPTIONED - 7384 Ruby Stone Court |
| PROJECT #: | 2 | CITY: | Leland |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
14775 Sam Potts Hwy
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 14775 Sam Potts Highway |
| PROJECT #: | 39 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
14975 Sam Potts Hwy
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 14975 Sam Potts Highway |
| PROJECT #: | 39 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
370 Loop Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 370 Loop Road |
| PROJECT #: | 39 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
45 10th St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 45 10th Street |
| PROJECT #: | 39 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
907 Smith Ln
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 907 Smith Lane |
| PROJECT #: | 39 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
707 Back Swamp Rd (A) Main
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 707 Back Swamp Road (A): Main Home |
| PROJECT #: | 86 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
707 Back Swamp Rd (B) Adj
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 707 Back Swamp Road (B): Adj Parcel Vacant Land |
| PROJECT #: | 86 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
849 Back Swamp Rd (C) Mobile
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 849 Back Swamp Road (C): Adj Parcel Mobile Home Park |
| PROJECT #: | 86 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
929 F M Watts Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 929 F M Watts Road |
| PROJECT #: | 100 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
690 Water Tank Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 690 Water Tank Road |
| PROJECT #: | 100 | CITY: | Delco |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
24605 Andrew Jackson Rd E
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | 24605 Andrew Jackson Road East |
| PROJECT #: | 100 | CITY: | Bolton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-100 Maultsby Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 100 Maultsby Drive |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-118 Maultsby Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 118 Maultsby Drive |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-305 Stanley St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 305 Stanley Street |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-415 W Walter St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 415 West Walter Street |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-418 W Virgil St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 418 West Virgil Street |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-418-B W Virgil St Lot
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 418-B West Virgil Street (Vacant Lot) |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-422 W Virgil St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 422 West Virgil Street |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-517 S Martin Luther
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 517 South Martin Luther King Jr Avenue |
| PROJECT #: | 190 | CITY: | Whiteville |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-1598 Hestertown Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 1598 Hestertown Road |
| PROJECT #: | 85 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-408 Oregon St
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 408 Oregon Street |
| PROJECT #: | 85 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-207 Woodyard Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 207 Woodyard Road |
| PROJECT #: | 36 | CITY: | Riegelwood |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-205 Highland Ave
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 205 Highland Avenue |
| PROJECT #: | 200 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-3690 Kale Dr
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 3690 Kale Drive |
| PROJECT #: | 200 | CITY: | Lumberton |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-2461 Whitestocking Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 2461 Whitestocking Road |
| PROJECT #: | 88 | CITY: | Burgaw |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-2461 Whitestocking Lot
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 2461 Whitestocking Road (Vacant Lot) |
| PROJECT #: | 88 | CITY: | Burgaw |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-5100 Heading Bluff Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 5100 Heading Bluff Road |
| PROJECT #: | 88 | CITY: | Currie |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |
OPTIONED-5302 Heading Bluff Rd
| ACQUISITION REQUEST FOR BID PROPERTY WORKSHEET | | | |
| STORM #: | 4827 | STREET ADDRESS: | OPTIONED - 5302 Heading Bluff Road |
| PROJECT #: | 88 | CITY: | Currie |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST |
| Acquisition | Intake / DOB Calculation | | | | $0.00 |
| Appraisal | | | | $0.00 |
| Title Research | | | | $0.00 |
| Document Prep | | | | $0.00 |
| Closing Attorney Fees | | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Acquisition Total: | $0.00 |
| Site Demolition | Asbestos / Lead Inspection | | | $0.00 |
| Asbestos / Lead Remediation | | | $0.00 |
| Structure Demolition | | | $0.00 |
| UST / Other Clearance | | | $0.00 |
| Grade / Seed | | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| Misc. | N/A or Provide Details | | $0.00 |
| | | Site Demolition Total: | $0.00 |
| Other | Profit & Overhead | | | |
| Construction Management Costs | | | |
| | | Other Total: | $0.00 |
| Vendor Total: | $0.00 |
| Property Total: | $0.00 |