This document is an Addendum (Number 01) for Invitation for Bid (IFB) #19-IFB-1481997624-GSX issued by the North Carolina Department of Public Safety (NCDPS) Emergency Management for the Duplin County Generator Project. The addendum addresses specific questions from potential bidders regarding generator installations at three elementary schools: Beulaville Elementary, North Duplin Elementary, and Rose Hill Magnolia Elementary. The document provides clarifications on electrical configurations, transformer connections, generator placement, and site-specific installation requirements. The bid opening is scheduled for April 28, 2025, at 2:00 PM ET, with bidders required to submit turn-key project proposals that include drawings, design, and as-built documentation for each location.

The addendum emphasizes that bidders must provide comprehensive project documentation to both Duplin County and the Duplin School system upon project completion. The responses indicate flexibility from the owner regarding specific technical details, such as electrical interconnections and generator positioning, while maintaining clear expectations about project scope and execution. The project appears to be funded through hazard mitigation efforts, with a focus on ensuring emergency power capabilities at critical educational infrastructure. Contractors are instructed to follow National Electrical Code (NEC) standards and provide solutions that minimize redundant work and maximize efficiency in generator and electrical system installations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 24, 2025

BID NUMBER: #19-IFB-1481997624-GSX

PROJECT:4393-0071 Duplin County Generator ADDENDUM Number: 01 USING AGENCY: NCDPS, Hazard Mitigation PURCHASER: Sherri Garte OPENING DATE/TIME: APRIL 28, 2025, at 2:00 PM ET

INSTRUCTIONS:

Please see the response to question below:

# QUESTION ANSWER

BEULAVILLE ELEMENTRARY SCHOOL 138 LYMAN RD.

1.

Are the two chillers located adjacent to the Duke Energy transformer being supplied electricity directly from the transformer or the MDP?

MDP.

2. If they are fed off the Duke energy transformer, is it the desire of the owner to include two 400-amp 277/480-volt ats’s so that the heating and cooling system operates during outages?

Feed from MDP.

3. Is it permissible to locate the 2500-amp ats within the fenced area and beside the Duke energy transformer?

Yes.

4. Is it permissible to run the shore power circuit out of a different panel instead of the electrical room which is quite a distance from the generator location?

Yes.

5.

Is there adequate space between the drop ceiling and the roof to run the shore power circuit?

Yes.

NORTH DUPLIN ELEMENTRAY SCHOOL 157 NORTH DUPLIN

SCHOOL ROAD

1. It was conveyed during the site visit that the owners had already planned and signed a contract to replace the aged out 2500-amp MDP. Would the owners be willing or able to reschedule that work for the summer of 2026 to prevent the owners from paying for new feeds from the utility transformer to the new MDP and then they can be removed and replaced to incorporate the ats the very next summer?

Prefer no delays.

2. If the owners are not able to postpone the work, would they help facilitate some cooperation between the MDP changeout contractor and the winner bidder of this IFB so as to not do the same work twice and prevent waste of time and resources.

No problem with providing the awarded contractor information.

ROSE HILL MAGNOLIA ELEMENTRAY SCHOOS, 1329 BROOKS

QUINN RD.

600 kw GENERATOR

1. The plan provided calls for demolition of the bus duct and new feeders installed from the utility. Is this the owner’s desire for either generator location, one or two?

Per pre-conference meeting the location of the generator will be outside the fence, please refer to IFB posting page 48 for 600KW and page 51 for 500KW.

2. Who will be responsible for the demolitions and removal of the fence fabric laid horizontally over the electrical courtyard

Contractor should include this work in their bid.

3. Can the owner provide the inside dimensions of the electrical courtyard so that we can verify clearances for the generator?

Invalid question, for generator location please refer to IFB posting page 48 for

600KW.

ADDITIONAL QUESTIONS

1.

Can the generator be relocated to the parking lot area in the above picture?

No, we cannot move location, please refer to IFB posted page 40.

2. First Brooks Quinn Location:

On last statement on generator specs states that install conduit/wire (2500-Amp feeder) however it is already sufficient and only requires intercept. Do we replace or Intercept

Replace as needed, per NEC

3. Second Brooks Quinn Location:

On last statement on generator specs states that install conduit/wire (2500-Amp feeder) however it is already sufficient and only requires intercept. Do we replace or Intercept

Intercept

To all bidders provide bids as turned-key project including drawings and design as well as including as-built drawings for each location to Duplin County and Duplin School system at completion of the project.