19-0070 RFB AMD 1.docx
DOCX document 197 KB Posted
- Solicitation number
- 19-0070
- Issued by
- Dane County, Madison City, Wisconsin
About this file
This is Amendment #1 to Request for Bid (RFB) #19-0070 issued by the University of Wisconsin-Madison Purchasing Services for two thermal cracker effusion cells—one compatible with cracked arsenic and one with cracked selenium. The cells are intended to support fundamental research on selenide (MoSe2, WSe2) and arsenide (GaAs, InAs) materials and must be compatible with an existing molecular beam epitaxy system. The required specifications include an in-vacuum length of 270mm, independently heated cracker and reservoir regions with thermal isolation maintaining reservoir temperatures below 150°C while the cracker operates at 1200°C, a reservoir capacity of at least 50 cubic centimeters (150 cc preferred), integrated water cooling, and bakeable power and thermocouple cables. Amendment #1 revises Attachment B specifications on page 20 of 32 and provides clarifications to bidder questions regarding flange size (CF 4.5"), linear shutter configuration (side-mounted from separate port), and valve options. Bid prices and terms are firm for sixty days from the bid opening date. The controlling document for any resulting contract is the UW-Madison Purchasing Services bid document on file.
Optional items available for bid include a linear shutter module with controller, two sets of PID controllers and DC power supplies (one for each cracker cell) with cables, and mechanical valves for both the arsenic and selenium cracker cells. Bidders must certify compliance with all stated conditions, confirm no collusion or conflict of interest exists, and affirm they are not debarred or suspended from federal participation. All questions regarding the bid should be directed to Jeff Whitman at UW Purchasing, 21 N Park Street, Suite 6101, Madison, Wisconsin 53715-1218, by telephone at 608/262-6120, fax at 608/262-4467, or email at jeff.whitman@wisc.edu.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19-0070 RFB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid No: 19-0070
UNIVERSITY OF WISCONSIN
MADISON, WISCONSIN 53715-1218
Bid prices and terms shall be firm for sixty (60) days from the date of bid opening, unless otherwise specified in this Request for Bid by the UW-Madison Purchasing Services.
Unless otherwise noted, public openings will be on the date and time specified. Award(s), if any, will be made as soon thereafter as possible.
The bid abstract will be on file and is open to public inspection only after award determination has been made.
If NO BID (check here) ☐ and return.
19-0070 / AMENDMENT #1 / THERMAL CRACKER EFFUSION CELLS Amendment #1 is issued to answer questions received from bidders and revise Attachment B: Specifications. Please replace page 20 of 32 noting the updated optional specifications. If this amendment is not returned, it shall be assumed your original bid meets all conditions of the amendment. All other terms and conditions remain the same. Please revise and submit your bid accordingly.
In signing this bid, we have read and fully understand and agree to all terms, conditions and specifications and acknowledge that the UW-Madison Purchasing Services bid document on file shall be the controlling document for any resulting contract. We certify that we have not, either directly or indirectly, entered into any contract or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the stated statement is accurate under penalty of perjury. I certify that the information I have provided in this bid is true and I understand that any false, misleading or missing information may disqualify the bid.
By submitting a bid, the bidder certifies that no relationship exists between the bidder and the University that interferes with fair competition or is a Conflict of Interest, and no relationship exists between such bidder and another person or firm that constitutes a Conflict of Interest. Further, bidder certifies that no employee of the University whose duties relate to this request for bid assisted the bidder in preparing the bid in any way other than in his or her official capacity and scope of employment.
The Bidder certifies by submission of the bid that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency.
Company Name:
Company Street Address:
Company City, State & Zip: Date:
Signature:
Type or Print Name:
Title:
Telephone Number: ( ) Fax Number: ( ) Email address:
Fein Number : DUNS #:
QUESTIONS AND ANSWERS FOR RFB #19-0070:
Q1. What is the available / required flange size for the cracker cells:
0. 2 3/4” (CF40)
0. or CF 4” (CF63)
| A1. | CF 4.5” flange |
| Q2. | The request asks for and optional “linear shutter". A linear shutter would have to come in from the side from a separate port - is this what you are looking for? We typically equip our cells with an integrated shutter where the shutter blade either swivels to the side or flips open to the front. Would this be acceptable? If yes, which version do you prefer. |
1. swivel to the side (rotation around the shutter rod that runs parallel to the effusion cell)
2. or flip open (like the lid of a box)
| A2. | The optional linear shutter is from the side on the separate port. We do not need an integrated shutter. |
| Q3. | Due to the large volume and the huge temperature difference between source and cracker, we are wondering: |
1. Do you want to material reservoir on the air-side?
1. and if so, if you need a valve?
A3. 1. Not sure what this means? But we do not need to be able to vent/load the reservoir independently from the rest of the cell.
2. no valve required, but please include with and without valve option if available
Attachment B: Specifications Two effusion cells are requested: (1) a thermal cracker cell for arsenic and (2) a thermal cracker cell for selenium. These effusion cells and accessories support fundamental research on selenide (MoSe2, WSe2) and arsenide (GaAs, InAs) materials. The effusion cells must be compatible with an existing molecular beam epitaxy system and meet specifications for size, power output, cracking efficiency for the molecular species.
Meet Specifications
| Item |
| Description |
| Yes |
| No |
| 1. |
| In-Vacuum length of 270mm |
| 2. |
| Independently heated cracker and reservoir regions - thermally isolated such that the reservoir region temperature is below 150C with cracker region at 1200C |
| 3. |
| Reservoir with capacity of at least 50 cc (150 cc preferred) |
| 4. |
| One cell must be compatible with cracked arsenic |
| 5. |
| One cell must be compatible with cracked selenium |
| 6. |
| Integrated water cooling |
| 7. |
| Bakeable power and thermocouple cables |
| 8. |
| Optional: linear shutter module and controller |
| 9. |
| Optional: 2x (PID controller and DC power supplies), one set for each cracker cell, plus cables |
OPTIONAL:Page 20 of 32
Meet Specifications
| Item |
| Description |
| Yes |
| No |
| 10. |
| Mechanical Valve for Arsenic Cracker Cell |
| 11. |
| Mechanical Valve for Selenium Cracker Cell |
image1.png