18972_specs.pdf

PDF 337 KB Posted

Attached to
Bituminous Materials
Solicitation number
26IFB18972
Issued by
South Dakota

About this file

This document is a specification sheet for a furnishing and delivering contract issued by the South Dakota Department of Transportation's Division of Operations for bituminous maintenance materials. The contract covers the supply of liquid asphalt materials, asphalt binders, asphalt emulsions, petroleum resin-oil base emulsions, asphalt repair mastics, rubber/asphalt crack sealants, and hot-poured elastic joint sealers for use at locations across South Dakota. Materials must conform to specified American Society for Testing and Materials (ASTM) and American Association of State Highway and Transportation Officials (AASHTO) standards, with detailed technical requirements provided for each material type, including crumb rubber crack sealants, hot-poured elastic joint sealers, medium curing cut-back asphalt, various emulsified asphalts, asphalt concrete crack leveling materials, and concrete mastic repair materials. Specific approved products are identified, including Deery Level and Go Repair Mastic, Crafco Mastic One, Maxwell Gap products, SAMIscreed, Crafco Techcrete, FPT Infrastructure Fibrecrete G, and Right Pointe Pave Patch-Gray.

The contractor must deliver materials on authorization from the Department, with reasonable delivery times established as 24 hours for liquid asphalt truck shipments and 14 calendar days for crack sealant and joint sealers, with liquidated damages assessed at $250 per day for late delivery. Liquid asphalt and asphalt binder must be delivered hot at specified minimum temperatures based on grade, and crack sealant and mastic materials must be delivered in boxless meltable packaging not exceeding 50 pounds per container. Payment is calculated by the ton for liquid materials and by the pound for sealants and mastics, with invoices submitted to regional offices specified in the contract. The Department reserves the right to sample and test all materials after delivery and may reject out-of-specification materials or assess price adjustments for non-conformance. Freight rate increases are not permitted during the first 180 calendar days of the contract; increases after this period require Department approval with supporting documentation. A truck transport with pump for unloading is available at an additional charge of $120, and unloading time exceeding two hours is compensated at $180 per hour in half-hour increments.

View the file

Other files

File Type Posted
SDVendorManual_20240822.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-1-

STATE OF SOUTH DAKOTA

DEPARTMENT OF TRANSPORTATION

FURNISHING AND DELIVERING

BITUMINOUS MAINTENANCE MATERIAL

Updated: 12/20/2025

SECTION 1: GENERAL

The Contractor will direct all documentation, including, but not limited to correspondence, invoices, and shipping data, to the respective Region or Area to which the correspondence pertains.

The Department of Transportation will be referred to in this Special Provision as the “Department” and the Division of Operations will be referred to as the “Division.”

The Contractor will provide services in compliance with the American with Disabilities Act of 1990, and any amendments.

SECTION 2: SPECIFICATIONS

Liquid asphalt materials, asphalt binders, asphalt emulsions, petroleum resin-oil base emulsion, asphalt repair mastics, and rubber/asphalt crack sealant must conform to the following requirements:

1. Crumb Rubber Crack Sealant will be composed of a mixture of asphalt and crumb rubber blended together by the manufacturer to produce a homogeneous mixture when melted, the sealer does not separate or settle and uniform consistency suitable for filling joints and cracks without inclusion of large air holes or discontinuities.

A. The crack sealant must meet the requirements of ASTM D 6690, Type I Modified with the following physical property requirements:

(1) Recycled rubber, mass, ≥ 18% of asphaltic components, minimum…… 18

(2) Cone Penetration, 25°C (77°F), maximum

(3) Bond Test, 50% extension, @-18°C (0°F) .............................. Pass 5 cycles

(4) Flow, 60°C (140°F), mm, maximum

(5) Resilience, 25°C (77°F), minimum...................................................... ≥ 40%

(6) Softening Point, ≥ 82°C (180°F), minimum

-2-

B. Method of Test of Rubber Asphalt Joint Sealant with Asphalt Concrete for Compatibility (SD-302) can be found at:

https://dot.sd.gov/media/documents/SDDOT_Materials_Manual.pdf

In addition to meeting t h e compatibility requirements of SD-302, the material must meet SD-302 compatibility requirements when tested by the following procedure:

(1) The asphalt concrete test specimen will be cooled to a constant temperature of 0°F.

(2) The specimen will be removed from the cooling unit and the test groove immediately filled with joint sealant at the manufacturer's recommended application temperature.

(3) The specimen will be immediately returned to the cooling unit and re-cooled to a constant temperature of 0°F.

(4) The block will be removed from the cooling unit and exposed to room temperature (72°F. ± 4°F) for a period of 4 hours ± 10 minutes. The specimen will be qualitatively examined for incompatibility at this time.

Low-Temperature Mandrel Bend Test: A sample (4” long x 1” wide x 1/8” thick) cooled to a constant temperature of 0°F must show no evidence of cracking when bent 90 degrees in 10 seconds over a 1” mandrel.

The sealant will not contain water or volatile solvents and will cure immediately on cooling to a viscosity sufficient to prevent tracking by traffic.

2. Hot Poured Elastic Joint Sealer must conform to the requirements of ASTM D6690 Type IV.

Hot-Poured Elastic Joint Sealer must conform to the requirements of section 870 and 871 of the Standard Specifications for Roads and Bridges 2025 edition. Only materials listed on the Department’s Approved Products List are to be quoted and supplied for this contract.

(https://dot.sd.gov/doing-business/contractors/standard-specifications)

3. Medium Curing Cut-back Asphalt must conform to AASHTO M 82

4. Emulsified Asphalt must conform to AASHTO M 140 with the following exceptions. When SS-

1h emulsified asphalt is specified for tack or flush seal cost, the cement mixing test requirement is waived. The sieve test requirement on representative samples will be waived unless requested by the Engineer.

5. Cationic Emulsified Asphalt must conform to AASHTO M 208 with the following exceptions.

When CSS-1h is specified for tack or flush seal cost, the cement mixing test requirement is waived. The sieve test requirement on representative samples will be waived unless requested by the Engineer. The demulsibility test will be made by the Contractor and the results provided to the Department’s agent within 30 ca len d ar days from the date of shipment.

https://dot.sd.gov/media/documents/SDDOT_Materials_Manual.pdf https://dot.sd.gov/doing-business/contractors/standard-specifications

-3-

6. Cationic Emulsified Asphalt diluted mix must conform to AASHTO M 208 with the following exceptions. When CSS-1h is specified for tack or flush seal cost, the cement mixing test requirement is waived. The sieve test requirement on representative samples will be waived unless requested by the Engineer. The demulsibility test will be made by the Contractor and the results provided to the Department’s agent within 30 calendar days from the date of shipment. The mix will be diluted with potable water in a ratio of approximately one part emulsion to one part water by volume.

7. Asphalt Concrete Crack Leveling Material will be supplied for the repairing of recessed joints and potholes in asphalt concrete pavement with the specified sealant material without milling or routing.

Asphalt repair mastic will be composed of quality-selected asphalt and/or resins, select aggregates with structural integrity, synthetic rubber polymers, antioxidants, naturally occurring and man-made reinforcing material, and other modifiers.

Asphalt repair mastic will be Deery Level and Go Repair Mastic, Crafco Mastic One, Maxwell Gap MOD 201, Maxwell Gap Patch 531 or SAMIscreed meeting the appropriate specifications below or an approved equal.

A. Deery Level and Go Repair Mastic

PROPERTIES OF MASTIC BINDER

Test Method Specification Penetration @ 77°F (25°C), 150 g, 5 sec ASTM D5329 100 dmm Max.

Penetration @ 122°F (50°C), 150 g, 5 sec ASTM D5329 150 dmm Max.

Flow @ 140°F (60°C), 75° angle, 5 hours ASTM D5329 3 mm Max.

Softening Point (R&B) ASTM D36 190°F (88°C) Min.

Flexibility @ 32°F (0°C) 0.25” mandrel, 90° bend, 10 sec

ASTM D3111

Modified

Bend Without Cracking

PROPERTIES OF BLENDED MASTIC PRODUCT

Low Temperature Flexibility ASTM D3111 Modified

Bend Without Breaking

Recommended Application Temp 350-400°F (177-204°C) * Safe Heating Temp 400°F (204°C) Max **

* Temperature of the product measured at the pavement surface. Use maximum application temperature in cool weather.

** Prolonged heating at or above Maximum Safe Heating Temperature may severely damage the product.

B. Crafco Mastic One

-4-

Penetration @ 77˚F (25˚C) ASTM D5329 60 dmm Max.

Penetration @ 122˚F (50˚C) ASTM D5329 120 dmm Max.

Flexibility @ 32˚F (0˚C), 1” mandrel, 180° bend, 10 sec

ASTM D3111

Modified

Bend without Cracking

Softening Point (R&B) ASTM D36 200˚F (93˚C) Min.

Test Method Specification Flexibility @ 32˚F (0˚C), ASTM D5329 Pass Adhesion @ 77˚F (25˚C) ASTM D5329 25 PSI (172 KPA), Min.

Specific Gravity 1.7 – 2.0 Recommended Application Temp 375°-400˚F (190°-204°C)

ADDITIONAL PROPERTIES

Test Method Specification (Type 1)

Mastic Resilience ASTM D8260 50% Min.

Effects of Rapid Deformation ASTM D8260 3 passing specimens Crack Bridging ASTM D8260 Pass 3 cycles @ -7°C Mastic Stability ASTM D8260 40.0 mm Max. @ 70°C

C. Maxwell Gap MOD 201

Cone Penetration @ 77°F (25°C), 150 g, 5 sec ASTM D5329 70 dmm Max.

Softening Point (R&B) ASTM D36 200°F (93°C) Min.

Resilience @ 77°F (25°C) ASTM D 5329 35% Min

Flexibility @ -15°F (-26°C) 1” mandrel, 90° bend, 2 sec

ASTM D3111 Pass

Adhesion @ 77°F (25°C) ASTM D5329 600% Min.

Recommended Application Temp 370°F (188°C) Safe Heating Temp 400°F (204°C) Max.

ADDITIONAL PROPERTIES

Test Method Specification (Type 2) Mastic Resilience ASTM D8260 50% Min.

Effects of Rapid Deformation ASTM D8260 3 passing specimens Crack Bridging ASTM D8260 Pass 3 cycles @ -18°C

-5-

Mastic Stability ASTM D8260 40.0 mm Max. @ 60°C

D. Maxwell Gap Patch 531

Cone Penetration @ 77°F (25°C), 150 g, 5 sec ASTM D5329 70 dmm Max.

Softening Point (R&B) ASTM D36 200°F (93°C) Min.

Resilience @ 77°F (25°C) ASTM D 5329 35% Min

Flexibility @ -15°F (-26°C) 1” mandrel, 90° bend, 2 sec

ASTM D3111 Pass

Adhesion @ 77°F (25°C) ASTM D5329 600% Min.

Recommended Application Temp 380°F (193°C) Safe Heating Temp 400°F (204°C) Max.

AGGREGATE

Test Method Specification Sieve Analysis No. 4, Passing: Mfg. Cert. 95% Min.

Sieve Analysis No. 16, Passing: Mfg. Cert. 10% Max

E. FPT Infrastructure SAMIscreed

PHYSICAL PROPERTIES

Test Method Specification (Type 1 & 2)

Mastic Resilience ASTM D8260 50% Min.

Effects of Rapid Deformation ASTM D8260 3 passing specimens Crack Bridging ASTM D8260 Pass 3 cycles @ -7°C and

-18°C Mastic Stability ASTM D8260 40.0 mm Max. @ 60°C and

70°C Specific Gravity 1.7 – 2.0 Recommended Application Temp 370-400°F (188-204°C)

F. Structural Aggregate Properties: The aggregate portion of the mastic will include wear resistant granite, quartzite, or limestone meeting the following requirements:

PROPERTIES OF AGGREGATE

Resistance to Abrasion and Impact ASTM C 131 Grading “C”

35% Degradation Max

G. Documentation: The Supplier’s documentation will include all of the following information:

-6-

1. Written certification from the manufacturer for each shipment, which will include a statement of the asphalt repair mastic material quantity and quality control data for each production run. A production run will be described as the quantity of material produced during one cycle from startup to shutdown of the manufacturer’s equipment.

2. Manufacturer’s certificate of compliance for surface conditioner or primer.

H. Warranty: Asphalt repair mastic will be warranted for certification and performance by the supplier and or the manufacturer for the duration of one year by the pound of mastic by date supplied or applied.

8. Concrete Mastic Repair Material will be supplied for the repairing of spalls and potholes in concrete pavement with the specified sealant material without sawing, milling, or routing. The material will be gray in color.

Repair mastic will be composed of quality-selected asphalt and/or resins, select aggregates with structural integrity, synthetic rubber polymers, antioxidants naturally occurring and man-made reinforcing material, and other modifiers.

Concrete repair mastic will be Crafco Techcrete, FPT Infrastructure Fibrecrete G, or Right Pointe Pave Patch-Gray meeting the appropriate specifications from the manufacturer or an approved equal.

A. Crafco Techcrete

Specific Gravity ASTM D 2726 2.08 Binder Content ASTM D 6307

Method A 15 – 25%

Aggregate Passing the 5/8” Retained on the No. 16 Passing the No. 4 Sieve

ASTM D 5444 ----

100 minimum

Flow, 5 h 140°F (60°C) ASTM D 5329 5 maximum Tensile Test (Briquette) at 20°F(-7°C), 3 specimens

AASHTO T140

Modified TTM5

50 – 200 lbs. (222 - 890N)

Tensile Adhesion ASTM D5329 Modified

12 psi(83kPa) minimum, 0.5 inches (12 mm) minimum elongation

Impact Testing, 2 inch (50 mm) diameter, 1 inch (25 mm) thick specimen, 5/8” (16

mm) impact dart

ASTM D2794 No cracking, chipping or separation at 6 ft·lb (8.1 N·m) at 20°F (-7°C)

Minimum Application Temperature 375°F (190°C) Maximum Heating Temperature 400°F (204°C) Max.

Shelf Life 2 years

-7-

Flexibility, Lab Standard Conditions ASTM D3111 No Cracking or Loss of

Aggregate Adhesion

B. FPT Infrastructure Fibrecrete G

Tensile Strain FTL Test

Method* 35% minimum @ 2”/minute

Cone Flow FTL Test Method*

7% maximum

Aggregate Settlement FTL Test Method*

3% maximum

Flexibility / Mandrel FTL Test

Method* Good or Better (no tearing at bend point)

Resilience FTL Test Method*

50% Recovery

Specific Gravity 1.8 – 2.0 Recommended Application Temp 300°-350˚F (149°-177°C)

* FTL Test Methods are available upon request from the manufacturer

C. Right Pointe Pave Patch Gray

Softening Point ASTM D 36 210°F (99°C) Min.

Binder Extension Test, 5 cycles @ 77°F(25°C) ASTM D 5329 300% Extension Flow @ 140°F (60°C) ASTM D 5329 3 mm Max

Compression Resistance, 10.2 mm/min. @ 77°F

ASTM D 5329 1,125 pounds-force min.

Load @ 25% Compression

Extension, 1.02 mm/min. @ 77°F ASTM D 5329 50% Min. Extension Wheel Tracking @ 122°F, Maximum Rut Depth

BS 598-110:98 3 mm/hr. max.

5.1 mm max. rut

Application Temperature Range 350°F to 400°F

-8-

D. Structural Aggregate Properties: The aggregate portion of the mastic will include:

wear-resistant granite, quartzite, or limestone meeting the following requirements:

PROPERTIES OF AGGREGATE

Resistance to Abrasion and Impact ASTM C 131

Grading “C” 20% Degradation Max

E. Documentation: The Supplier’s documentation will include all of the following information:

1. Written certification from the manufacturer for each shipment, which will include a statement of the asphalt repair mastic material quantity and quality control data for each production run. A production run will be described as the quantity of material produced during one cycle from startup to shutdown of the manufacturer’s equipment.

2. Manufacturer’s certificate of compliance for surface conditioner or primer.

F. Warranty - Concrete repair mastic will be warranted for certification and performance by the supplier and or the manufacturer for the duration of 1 year by the pound (kilogram) of mastic by date supplied or applied.

SECTION 3: MATERIAL ORDERING, DELIVERY, AND ACCEPTANCE

The Contractor will ship contract materials only when and as authorized by email, telephone, or by letter from the Department. The Department will authorize agents from its Region and Area Offices to place material orders with the Contractor.

The Department’s agent will provide the Contractor’s agent with the following information when placing an order:

(1) Agent’s name and identification with the Department.

(2) Material type and quantity.

(3) Time, date, and location of delivery.

(4) Truck transport pump requirements.

(5) Name and telephone number of an individual to contact in case of a delivery problem.

(6) Billing address for invoice and other support documentation.

The time and date of delivery become binding for the assessment of liquidated damages when the Contractor accepts the order.

The Department may order different viscosity and penetration grades under the same specification description or grade, without incurring liability for increased cost (for example MC-250, in place of

MC-70).

-9-

The Contractor will deliver crack sealant, joint sealant and mastic materials in boxless meltable packaging weighing no greater than 50 lb [23 kg]. The material will be shrink wrapped and delivered on a pallet. The following data will be clearly printed on each filled container: material name, manufacturer’s name, brand name, weight, batch number, and maximum heating temperature recommended by the manufacturer.

If the Contractor is unable to furnish the material within a reasonable time, and in the quantity and quality stipulated in the contract, the Contractor will obtain the material from another supplier at no additional cost to the Department. If the Contractor does not furnish the material as stated above, the Department may then, at its option, cancel the unexpired portion of that contract or purchase from such other company or companies such amounts of material as the Contractor did not furnish, in which case all costs and expenses in excess of the amount which would be due the Contractor for furnishing these materials will be charged to and paid for by the Contractor. Any such costs may at the option of the Department be paid by the Department and deducted from the amount then due the Contractor. The Contractor or the Contractor’s surety will promptly pay any remaining costs and expenses. The parties agree that reasonable delivery time is within 24 hours from receipt of order on truck shipments of liquid asphalt, and 14 calendar days from date of order on delivery of crack sealant and joint sealers. The Department will assess liquidated damages in the amount of $250/day for each calendar day delivery time is exceeded.

The Contractor will deliver liquid asphalt, asphalt binders, asphalt emulsions, and petroleum resin-oil base emulsions in truck transport loads not to exceed 55,000 pounds net weight unless larger loads are specified. The Contractor must advise the Department at the time an order is placed if the Department’s order does not meet the Contractor’s shipping minimum. The Contractor must further advise the Department what the Contractor’s minimum order is, what additional charges will be invoked, and receive confirmation from the Department that the charges are acceptable, before accepting the order. The Contractor will provide a truck transport with a pump to unload the material when requested by the Department, at an additional charge of $120 Liquidated damages may be assessed against the Contractor where the late delivery of a material results in a project delay or project rescheduling. For a late delivery resulting in a project delay, the Contractor may be assessed for the Department’s cost of lost personnel productivity time, including wage additives. For a late delivery resulting in project rescheduling, the Contractor may be assessed for the Department’s cost of lost personnel productivity time, including wage additives, and the equipment costs incurred by the Department due to the rescheduling.

Liquid asphalt and asphalt binder delivered by truck transport will be delivered hot. Asphalt binder will have a minimum delivery temperature 10°F higher than the minimum mix temperature as determined from the Contractor supplied viscosity chart or the graphing application of the Contractor supplied temperatures at which the material has a kinematic viscosity of 150 and 300 centistokes. The minimum delivery temperature for the various grades of liquid asphalt will meet the following requirements:

Grade Temperature - °F.

-10-

70 120 250 140 800 180

3000 210

The Contractor will provide the following documentation to the Department at the time of delivery:

(1) Stamped Weight Slips from which the weight of the delivered material is determined.

(2) Certificate of Compliance: The certificate may be furnished separately or included in the

Bill of Lading.

(3) Bill of Lading.

(4) For a liquid asphalt or asphalt binder:

a. A viscosity chart or the temperatures at which the material has a kinematic viscosity of 50, 150, 200, and 300 centistokes to enable the determination of the material’s mixing or spraying temperature.

b. Specific Gravity.

The Department will accept delivery of the material if all of the following conditions are met:

(1) The material was ordered by the Department.

(2) The material is the type and quantity ordered.

(3) The material meets the required delivery temperature.

(4) All of the above-listed delivery documentation is supplied.

(5) The delivery time does not require rescheduling of the project.

Material is considered delivered and a delivery time is established when the Department accepts delivery of the material. A delivery is considered late if the delivery time is later than the delivery time established when the material was ordered. Failure of the Contractor to get delivery acceptance may result in liquidated damages being assessed against the Contractor due to late delivery as previously defined in this section.

In every case, the Department will be allowed a minimum of 2 hours after the established delivery time in which to unload the delivered material without incurring any additional fees, charges, or demurrage. Any unloading time in excess of two hours will be measured and paid in half hour increments at a rate of $180/hr.

Although the Department may accept the material on the basis of a Certificate of Compliance (as defined in RSTC Section 6.3 of the Department’s Materials Manual), the Department reserves the right to sample, test, and make final acceptance of material after delivery to the project. The material represented by the sample may be rejected for use if the laboratory tests on the sample do not satisfactorily meet the requirements of the applicable specifications. If material found to be out-of-specification has been used, the Department will determine a price adjustment according to the degree and nature of non-conformance.

Sampling of liquid asphalt, asphalt binder, emulsified and petroleum-oil base emulsion will be in

-11-accordance with South Dakota Test 301, Method of Sampling Asphalt Materials. Trucks transporting liquid asphalt, asphalt binder, asphalt emulsion, or petroleum resin-oil base emulsion will be equipped with a bulkhead-sampling valve or provide a means to obtain an in- line sample.

SECTION 4: METHOD OF MEASUREMENT AND BASIS OF PAYMENT

Liquid asphalt, asphalt binder, emulsified asphalt, and petroleum-oil base emulsion will be measured by the ton (consisting of 2000 pounds avoirdupois) to the nearest one-hundredth (0.01) ton, furnished and accepted. Crumb Rubber/Asphalt Crack Sealant and Hot-Poured Elastic Joint Sealer will be measured by the pound to the nearest one-tenth (0.1) pound, furnished and accepted.

Asphalt and concrete repair mastic will be paid to the supplier by unit price per pound and shall be full compensation for all labor, equipment, materials, surface conditioner, or primer, and incidentals required to receive the repair mastic FOB at SDDOT provided in Table 3.

As soon as possible after shipment, the Contractor will send 2 copies of the invoice along with a copy of the Certificate of Compliance to the address given by the Department’s ordering agent or to the address of the Department’s Region or Area to which the material was shipped. The invoice must show all data concerning the shipment (date shipped, material, destination, weight, unit cost, item number, and reference number). Table 3 provides various Region and Area addresses.

TABLE 3

REGION AREA(S) SEND INVOICES TO:

Aberdeen Aberdeen

Watertown Huron

Department of Transportation PO Box 1767 Aberdeen, SD 57402-1767

Mitchell Mitchell Department of Transportation PO Box 1206 Mitchell, SD 57301-7206

Mitchell Sioux Falls Department of Transportation 5316 W. 60th St. N.

Sioux Falls, SD 57107

Mitchell Yankton Department of Transportation 1306 W 31st St.

Yankton, SD 57078-9662

Pierre Pierre Department of Transportation 104 South Garfield Pierre, SD 57501

Pierre Mobridge Department of Transportation PO Box 488 Mobridge, SD 57601-0488

-12-

Pierre Winner Department of Transportation PO Box 771 Winner, SD 57580-0771

Rapid City

Rapid City Belle Fourche Custer

Department of Transportation PO Box 1970 Rapid City, SD 57709-1970

The Department will not allow additional compensation for freight rate increases that become effective during the first 180 calendar days of the contract. The Department will allow additional compensation for verified freight rate increases that become effective after the first 180 calendar days of the contract only if the Contractor submits a request to the Department for an increase in freight rate, together with sufficient documentation to verify the increase is in effect, and the Department approves the additional compensation. If approved, the Department will allow additional compensation for freight rate increases for shipments made after the date the request for increase was received by the Department. The Contractor must enter any freight cost increase as a separate item on the invoice. No change will be permitted in the unit price of the base item.

* FTL Test Methods are available upon request from the manufacturer

File details come from the government source that posted it. Updated .