179-2324-782_LP_XWALK-BID ADVERTISEMENT.pdf
PDF 37 MB Posted
- Attached to
- 179-2324-782_LP_XWALK
- Solicitation number
- 179-2324-782_LP_XWALK
- Issued by
- Durham County, Durham City, North Carolina
About this file
This document is a Bid Advertisement for the Scott King Road Crosswalk and Sidewalk Addition project located in Durham, North Carolina. The project is being solicited by Durham County and the City of Durham, and involves furnishing labor, material, and equipment for the crosswalk and sidewalk construction at 906 Scott King Road. The bid due date is listed as October 27, 2022 at 2:00 PM. A non-mandatory pre-bid conference will be held on October 13, 2022 at 2:00 PM. The contract period is not specified.
The Bid Advertisement does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial information. It focuses solely on the scope of work, location, bid submittal deadline, and pre-bid conference details.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advertisement for Bids 00 01 10-1
RFP# - 179-2324-728_LF_xwalk
ADVERTISEMENT FOR BIDS
Durham Public Schools / Durham County
Sealed bids from licensed contractors will be received by Durham Public Schools, Durham, North Carolina on April 25, 2024 for furnishing of labor, material, and equipment for the Scott King Road Crosswalk and Sidewalk Addition located 906 Scott King Road, Durham, NC 27713 to be received by 1:00 PM from Single Prime bidders at which time and place all bids will be publicly opened and read aloud at 2:00 PM. Deliver or mail bids to the Durham Public Schools 511 Cleveland Street, Durham NC, 27701.
• No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days.
• Bid security required is 5% of the bid in cash, certified check, or Bid Bond.
• Performance and Payment Bonds for 100% of the contract amount will be required.
• Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities.
Minority Business Participation: Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project.
Project scope: (DKA will provide this info)
Pre-Bid Conference: Scheduled for April 2, 2024 at 10:00AM at 906 Scott King Road in Durham.
Inspection of the site shall be scheduled immediately after the Pre-Bid Conference. The project Designer or Designer’s representative will be available to answer questions. It is MANDATORY that prime bidders attend the entire Pre-Bid Conference and visit the site prior to bidding.
Questions are due by April 8, 2024 via email to Dist.Purchasing <Dist.Purchasing@dpsnc.net> with a subject line of “LF walk”. Responses to questions provided by April 11, 2024.
Statement of Qualifications: Each proposal shall be accompanied by a statement of qualifications that demonstrates experience in at least five (5) projects of similar scope within the past three (3) years with references.
Complete plans and specifications for the project can be obtained at the Contractor’s expense from Davis Kane Architects, PA. Please contact Chad Volk, AIA, Project Manager via phone 919- 719-2811 or e-mail cvolk@daviskane.com
For questions regarding this bid, please contact:
Designer Contact Information:
Davis Kane Architects, PA Chad Volk, AIA, Project Manager 919-719-2811 cvolk@daviskane.com
Durham Public Schools Project Manager:
Melanie Gartrell 919-309-5982 Melanie_gartrell@dpsnc.net
Thank you for your consideration.
Signed: Fredrick Davis, II Executive Director- Building Services Construction & Capital Planning Durham Public Schools, Durham, North Carolina
SHEET
Robert Stevenson
14-142
JOB NUMBER
REVISIONS
DATE ISSUED
DATE
PROJECT MANAGER
SEALS
503-300 Oberlin Road Raleigh, North Carolina 27605 ph 919-833-3737
A R C H I T E C T S , P A architecture planning interiors fax 919-755-1771
INFO@DAVISKANE.COM
Davis Kane
Davis Kane
CLIENT
JOB TITLE
1 2 3 4
A
B
C
D
5 6 7 8
E
F
G
H
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
DURHAM PUBLIC
SCHOOLS
SC
OT
T
KI
NG
R
OA
D
CR
OS
SW
AL
K
AN
D
SI
DE
W
AL
K
AD
DI
TI
ON
Sc ot t K in g Ro ad D ur ha m , N
C
These drawings are the property of Davis Kane Architects, P.A. They may not be reused for any purpose without written permission.
Copyright © 2024 by Davis Kane Architects, P.A. All rights reserved.
Drawn By:
Plot Date: -
ZP, YA, DL, DC, SL
03-08-2024
C-6.01
EROSION/STORM DETAILS
NORTH C A ROLINA
PR
OFESSIONAL
ENG INEE R
022625
SEAL
S TE V EN J . MIL LER
14-142
JOB NUMBER
REVISIONS
DATE ISSUED
DATE
PROJECT MANAGER
SEALS
503-300 Oberlin Road Raleigh, North Carolina 27605 ph 919-833-3737
A R C H I T E C T S , P A architecture planning interiors fax 919-755-1771
INFO@DAVISKANE.COM
Davis Kane
Davis Kane
CLIENT
JOB TITLE
1 2 3 4
A
B
C
D
5 6 7 8
E
F
G
H
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
DURHAM PUBLIC
SCHOOLS
SC
OT
T
KI
NG
R
OA
D
CR
OS
SW
AL
K
AN
D
SI
DE
W
AL
K
AD
DI
TI
ON
Sc ot t K in g Ro ad D ur ha m , N
C
These drawings are the property of Davis Kane Architects, P.A. They may not be reused for any purpose without written permission.
Copyright © 2024 by Davis Kane Architects, P.A. All rights reserved.
Drawn By:
Plot Date: -
ZP, YA, DL, DC, SL
03-08-2024
C-6.02
EROSION/STORM DETAILS
NORTH C A ROLINA
PR
OFESSIONAL
ENG INEE R
022625
STE V EN J . MIL LER
14-142
JOB NUMBER
REVISIONS
DATE ISSUED
DATE
PROJECT MANAGER
SEALS
503-300 Oberlin Road Raleigh, North Carolina 27605 ph 919-833-3737
A R C H I T E C T S , P A architecture planning interiors fax 919-755-1771
INFO@DAVISKANE.COM
Davis Kane
Davis Kane
CLIENT
JOB TITLE
1 2 3 4
A
B
C
D
5 6 7 8
E
F
G
H
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
DURHAM PUBLIC
SCHOOLS
SC
OT
T
KI
NG
R
OA
D
CR
OS
SW
AL
K
AN
D
SI
DE
W
AL
K
AD
DI
TI
ON
Sc ot t K in g Ro ad D ur ha m , N
C
These drawings are the property of Davis Kane Architects, P.A. They may not be reused for any purpose without written permission.
Copyright © 2024 by Davis Kane Architects, P.A. All rights reserved.
Drawn By:
Plot Date: -
ZP, YA, DL, DC, SL
03-08-2024
C-7.01
STAKING/LS DETAILS
14-142
JOB NUMBER
REVISIONS
DATE ISSUED
DATE
PROJECT MANAGER
SEALS
503-300 Oberlin Road Raleigh, North Carolina 27605 ph 919-833-3737
A R C H I T E C T S , P A architecture planning interiors fax 919-755-1771
INFO@DAVISKANE.COM
Davis Kane
Davis Kane
CLIENT
JOB TITLE
1 2 3 4
A
B
C
D
5 6 7 8
E
F
G
H
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
DURHAM PUBLIC
SCHOOLS
SC
OT
T
KI
NG
R
OA
D
CR
OS
SW
AL
K
AN
D
SI
DE
W
AL
K
AD
DI
TI
ON
Sc ot t K in g Ro ad D ur ha m , N
C
These drawings are the property of Davis Kane Architects, P.A. They may not be reused for any purpose without written permission.
Copyright © 2024 by Davis Kane Architects, P.A. All rights reserved.
Drawn By:
Plot Date: -
ZP, YA, DL, DC, SL
03-08-2024
C-7.02
STAKING/LS DETAILS
SPLIT FACE UTILITY BRICK
(MATCH EXIST. BLDG.)
(2) 8" CMU GROUT ALL
CELLS SOLID
(4) #4 REBAR
(2) #4 REBAR
#5 REBAR
PRECAST ANCHOR
ARCH PRECAST CAP.
SEE F1/A4.7
COPPER-LAMINATED
FLASHING, SEAL @
ANCHORS, LAP END JOINTS 6"
MIN & SEAL TO BE WATER
TIGHT
8" DEEP CMU BOND BEAM
WITH 2-#4 CONTINOUS
2"
3'-0"
2'-0" 10'-0" 2'-0"
1'-0"
ASPHALT PATH
8'-0" 1'-0"
ARCH PRECAST CAP.
SEE B2/A-1.0
SPLIT FACE UTILITY BRICK
(MATCH EXIST. BLDG.)
A1 A-1.0
SEE CIVIL DRAWINGS
/2
1/2" 1/4"
/2
12 1/2"
2'-4"
12 1/2"
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8
PROJECT INFORMATION
SEALS
REVISIONS
These drawings are the property of Davis Kane Architects, P.A. They may not be reused for any purpose without written permission.
Copyright © 2024 by Davis Kane Architects, P.A.
All rights reserved.
DKA JOB NUMBER
DATE ISSUED
SHEET TITLE
Drawn By:
Plot Date:
PA:
PM:
H
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8
CV
RS
3/11/2024 12:23:34 PM
A-1.0
GATEWAY PIER
DETAILS
SK
3/8/2024
BID DOCUMENTS
S c o tt K in g
R o a d
C ro s s w a lk a n d S id e w a lk A d d it io n D u rh a m
P u b lic
S c h o o ls
S c o tt K in g R o a d
D u rh a m
N
C
1 1/2" = 1'-0" A1
GATEWAY PIER
3/4" = 1'-0"
A3
GATEWAY ELEVATION
3" = 1'-0" F1
PRECAST PROFILE
PROJECT MANUAL for
Durham Public Schools DPS Project Number 179-2324-728_LF_xwalk
Scott King Road Crosswalk And Sidewalk Addition
General Construction
Bid Documents
March 11, 2024
DKA Project Number 2404
503-300 Oberlin Road Raleigh, North Carolina 27605
Phone (919) 833-3737
StevenM Image
ZakP Image
Section 00 01 01
PROJECT MANUAL
FOR
Scott King Road Crosswalk and Sidewalk Addition
PREPARED BY:
March 11, 2024
TABLE OF CONTENTS
Project: Scott King Road Crosswalk and Sidewalk Addition
906 Scott King Road Durham, NC 27713
DPS #: 179-2324-728_LF_xwalk
Table of Contents
DIVISION 0 – PROCUREMENT AND CONTRACTING REQUIREMENTS
001113 Advertisement for Bids
003100 Information Available to Bidders
004113 Bid Form
004313 Bid Bond Form
004393 Bid Packet Requirements
004516.01 Affidavit of E-Verification
004519 Non-Collusion Affidavit
004539
MWBE Policy
004539.01 MWBE – Article V
004539.03 MWBE - Affidavit A
004939.04 MWBE - Affidavit B
004539.05 MWBE - Appendix E
004539.06 Identification of MWBE Participation
005213 Owner-Contractor Agreement
006113 Performance Bond
006211 Submittal Transmittal Form
006279.13 Sales and Use Tax Report – Appendix A
006276 Pay Application Cover Sheet
006319 Request for Clarification 006354 Change Proposal Worksheet
006357 Change Order Request Form
006513 Certificate of Compliance
006523 Contractors General Warranty
006573 Certificate of Non Use of Asbestos-containing Products
077300.01 DPS Formal General Conditions
DIVISION 1 - GENERAL REQUIREMENTS
01 10 00 Summary of Work
01 14 00 Work Restrictions
01 25 00 Substitution Procedures
01 21 00 Allowances
01 22 00 Unit Prices
01 23 00 Alternates
01 25 00 Substitutions Procedures
01 26 00 Modification Procedures
01 26 13 Request for Information
01 29 00 Payment Procedures
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 32 16 Construction Schedule and Reports
01 33 00 Submittal Procedures
01 35 13 Special Project Procedures
01 35 13.01 Tobacco Policy
01 35 13 Name Tag Template
01 52 00 Construction Facilities
01 74 19 Construction Waste Management and Disposal
01 77 00 Closeout Procedures
01 77 01 O&M Binder Cover
01 77 02 O&M Binder Spine
01 77 03 O&M Schedule of Docs
01 77 19 Closeout Requirements
01 78 36 Warranties
01 78 36.1 Warranty Binder Cover 01 78 36.2 Warranty Binder Spine 01 78 36.3 Warranty Schedule 01 79 00 Demonstration and Training
DIVISION 2 - EXISTING CONDITIONS
NOT USED
DIVISION 3 - CONCRETE
03 30 00 Cast-In-Place Concrete
03 45 00 Precast Architectural Concrete
DIVISION 4 - MASONRY
04 20 00 Unit Masonry
DIVISION 5 - METALS
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 62 00 Sheet Metal Flashing and Trim
07 92 00 Joint Sealants
DIVISION 8 - OPENINGS
DIVISION 9 – FINISHES
DIVISION 10 - SPECIALTIES
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 - CONVEYING EQUIPMENT
DIVISION 22 – PLUMBING
DIVISION 23 – HVAC
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
DIVISION 27 - COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
31 10 00 Site Clearing
31 20 00 Earth Moving
31 25 00 Erosion & Sediment Controls
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving
32 13 13 Concrete Paving
32 90 00 Planting
DIVISION 33 - UTILITIES
33 40 00 Storm Drainage
END OF TABLE OF CONTENTS
RFP# - 179-2324-728_LF_xwalk
ADVERTISEMENT FOR BIDS
Durham Public Schools / Durham County
Sealed bids from licensed contractors will be received by Durham Public Schools, Durham, North Carolina on April 25, 2024 for furnishing of labor, material, and equipment for the Scott King Road Crosswalk and Sidewalk Addition located 906 Scott King Road, Durham, NC 27713 to be received by 1:00 PM from Single Prime bidders at which time and place all bids will be publicly opened and read aloud at 2:00 PM. Deliver or mail bids to the Durham Public Schools 511 Cleveland Street, Durham NC, 27701.
• No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days.
• Bid security required is 5% of the bid in cash, certified check, or Bid Bond.
• Performance and Payment Bonds for 100% of the contract amount will be required.
• Durham Public Schools reserves the right to reject any and all bids and to waive informalities or irregularities.
Minority Business Participation: Bidders shall note that compliance with County of Durham MBE policies and the North Carolina Statute 143-128.2 (c) are required for this project.
Project scope: (DKA will provide this info)
Pre-Bid Conference: Scheduled for April 2, 2024 at 10:00AM at 906 Scott King Road in Durham.
Inspection of the site shall be scheduled immediately after the Pre-Bid Conference. The project Designer or Designer’s representative will be available to answer questions. It is MANDATORY that prime bidders attend the entire Pre-Bid Conference and visit the site prior to bidding.
Questions are due by April 8, 2024 via email to Dist.Purchasing <Dist.Purchasing@dpsnc.net> with a subject line of “LF walk”. Responses to questions provided by April 11, 2024.
Statement of Qualifications: Each proposal shall be accompanied by a statement of qualifications that demonstrates experience in at least five (5) projects of similar scope within the past three (3) years with references.
Complete plans and specifications for the project can be obtained at the Contractor’s expense from Davis Kane Architects, PA. Please contact Chad Volk, AIA, Project Manager via phone 919- 719-2811 or e-mail cvolk@daviskane.com
For questions regarding this bid, please contact:
Designer Contact Information:
Davis Kane Architects, PA Chad Volk, AIA, Project Manager 919-719-2811 cvolk@daviskane.com
Durham Public Schools Project Manager:
Melanie Gartrell 919-309-5982 Melanie_gartrell@dpsnc.net
Thank you for your consideration.
Signed: Fredrick Davis, II Executive Director- Building Services Construction & Capital Planning Durham Public Schools, Durham, North Carolina
Information Available to Bidders 00 31 00-1
INFORMATION AVAILABLE TO BIDDERS
A-1. SUBMISSION OF BIDS AND BID OPENING:
A. Bids will be received by Durham Public Schools (DPS) and will be opened and read at the times and places set forth in the Advertisement for Bids. Bidders, or their representative, and other interested persons may be present at the opening of proposals.
B. The envelopes containing the bids must be sealed and addressed to Durham Public Schools, 511 Cleveland Street, Durham, NC 27704 and marked on the outside of the envelope "Bid Proposal for Scott King Road Crosswalk and Sidewalk Addition” with the name of the Bidder and his North Carolina State Contractor's License Number.
C. The Bidder shall assume full responsibility for timely delivery at the exact location designated for receipt of Bids.
D. In accordance with the Advertisement for Bids, bids will be received for a Single Prime Construction Contract.
A-2. BID DOCUMENTS:
A. Bid Documents include the Advertisement for Bids, Information for Bidders, Form of Proposal, the Bid Security and the proposed Contract Documents, including any Addenda issued prior to receipt of bids. All requirements and obligations of the Bid Documents are hereby incorporated by reference into the Contract Documents and are binding on the Successful Bidder upon award of the contract.
B. Bidders may obtain complete sets of the Bid Documents from the issuing office designated in the Advertisement for Bids in the number and for the price, if any, stated therein.
C. Bidders shall use complete sets of Bid Documents in preparing Bids; neither the
Owner nor the Design Consultant shall assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
D. By making the Bid Documents available on the above terms, the Owner does so only for the purpose of obtaining Bids on the Work and does not confer a license or grant for any other use.
Information Available to Bidders 00 31 00-2
A-3. DEFINITIONS:
A. THE BID:
A Bid is a complete and properly signed proposal to do the work or designated portion thereof for the sums stipulated therein, submitted in accordance with the Bidding Documents and North Carolina law.
B. BASE BID:
The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents as the base, to which work may be added or from which work may be deleted for sums stated in Alternate Bids, if any.
C. ALTERNATES:
An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from the amount of the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.
A-4. QUALIFICATION OF BIDDER:
A. If requested by the Owner prior to the signing of the contract, the successful Bidder shall submit a statement of work to be performed by his own forces.
B. Prior to Contract award or within seven days of the Owner's request to do so, the successful Bidder shall be prepared to demonstrate that his present organization, direct labor force and prior work experience is of adequate size and development to maintain responsible control of the project and to schedule, coordinate and perform the work in an expeditious manner and in accordance with the Contract Documents.
C. At the request of the Owner, the Bidders, whether residents or nonresidents in North
Carolina must be able to show documented evidence of the following:
1. A contractor’s license in good standing with the North Carolina General Contractor’s Licensure Board (or NC State Board of Examiners for Plumbing, Mechanical, Electrical, and / or Fire Protection only projects) with the appropriate level of limitations and classifications.
2. A current registration in good standing with the North Carolina Secretary of State’s to allow the Bidder do business in the State of North Carolina.
D. The Owner will consider, in determining the qualifications of a Bidder, their record in the performance of any contracts for construction work into which they may have entered with the Owner or with similar public or private bodies or corporations. The Owner expressly reserves the right to reject the bid of any Bidder if such record discloses that such Bidder, in the opinion of the Owner, has not properly performed such contracts or has habitually and without just cause neglected the payment of bills, or has otherwise disregarded his obligations, Subcontractors, material men, suppliers or employees.
E. The Owner may make such investigation as they deem necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to the Owner
Information Available to Bidders 00 31 00-3 all such information and data for this purpose as they may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of such Bidder, fails to satisfy the Owner that such Bidder is a responsive and responsible Bidder in accordance with N.C. Gen. Stat. 143-128 and 143-129, and the criteria set forth herein. Conditional bids will not be accepted.
A-5. BIDDER'S REPRESENTATIONS:
By submitting his bid, each Bidder represents that:
A. The Bidder has read and understands the Bid Documents and their Bid is made in accordance therewith; and Bidder agrees to be bound by the terms and requirements set forth in the Bid and Contract Documents.
B. The Bidder has visited the site, has familiarized themselves with the local conditions under which the Work is to be performed in accordance with Article A-10 herein, and has correlated its observations with the requirements of the proposed Contract Documents.
C. Prior to the submission of the bid, the Bidder has made known to the Owner any significant discrepancies discovered during the preparation of its bid. These are items that could result in a significant change in time or money.
D. The submitted bid is based upon the materials, systems and equipment required by the Bidding Documents without exception.
E. The Bidder has the capability, in all respects, and the moral and business integrity, reliability, technical ability, financial resources, plant, management, superintendence, equipment and materials which will assure effective and efficient good faith performance in full compliance with the Contract Documents and with any and all schedules and Milestone and Completion dates required by the Owner. The Bidder acknowledges and represents that he has made allowances for normal inclement weather as outlined in the Contract Documents, in his estimating, planning and scheduling of the Work. The Bidder hereby certifies that the work shall be completed, in place, in full accordance with the Contract Documents, within the time limits specified.
F. The Bidder agrees that upon receipt of the Notice of Award, he will execute the formal Contract, and will deliver all bonds and proof of insurance coverage as required by the Specifications.
G. The Bidder agrees to execute the formal Contract within ten (10) days from the date of Notice of Award, and in case he fails or neglects to appear within the specified time to execute the Contract, he will be considered as having abandoned the Contract, and the Bid Security accompanying this Proposal will be forfeited to the Owner by reason of such failure on the part of the Bidder.
H. He has made a good faith effort to solicit Minority Business Enterprises (MBEs) per
N.C. Gen. Stat. 143-128.2, as subcontractors. The Bidders shall provide the Owner a notarized affidavit with its bid stating that it made the good faith effort required pursuant to G.S. 143-128.2. The Bidder’s failure to file the affidavit with its bid shall be grounds for rejection of the Bid.
Information Available to Bidders 00 31 00-4
A-6. BID SECURITY:
A. Each bid must be accompanied by (1) cash; or (2) a Cashier's Check or a Certified Check of the Bidder in an amount not less than 5% of the bid, made payable to the Owner; or (3) a bidder's bond on the Bid Bond Form provided herein or on a similar form which in every respect materially complies with said Bid Bond, in the amount of 5% of his bid. For purposes of this provision, the amount of the bid shall be the Base Bid plus all positive amount alternates. The Bidder's bond shall be issued by a surety company licensed to conduct business in the state of North Carolina and acceptable to the Owner.
B. Said bid security is given as a guarantee that the Bidder will enter into a contract if awarded the work and, in the case of refusal or failure to so enter into said contract, the security shall be declared forfeited to the Owner. Such security shall be returned to all but the three lowest Bidders within three days after the opening of bids and the remaining security will be returned within 48 hours after the Owner and the successful Bidder have executed the Contract. If no Contract has been awarded or the bidder has not been notified of the acceptance of his bid within sixty (60) days of the bid opening, the Bidder may withdraw his bid and request the return of his bid security. If, at the Owner's request, the Bidder agrees to extend and maintain his bid beyond the specified 60 days, his bid security will not be returned until the expiration of the period of extension.
A-7. FORFEITURE OF BID BOND:
The Successful Bidder, upon his failure or refusal to execute the Contract within ten (10) days after he has received Notice of Award, shall forfeit to the Owner the security deposited with his bid in accordance with North Carolina General Statute 143-129.
A-8. EQUAL EMPLOYMENT OPPORTUNITY
During the performance of this contract, the contractor agrees as follows:
A. The contractor will not discriminate against any employee or applicant for employment because of race, handicap, age, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to race, handicap, age, color, religion, sex or national origin. Such action shall include but not be limited to the following:
employment, upgrading, demotion or transfer, recruitment or recruiting advertising, layoff or termination rates of pay or other forms of compensation, and selection for training including apprenticeship. The contractor agrees to post in conspicuous places available to employees and applicants for employment notices setting forth the provisions of the nondiscrimination clause.
B. The contractor will in all solicitations or advertisements for employees placed by or on behalf of the contractor state that all qualified applicants will receive consideration for employment without regard to race, handicap, age, color, religion, sex, or national origin.
Information Available to Bidders 00 31 00-5
C. The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding a notice to be provided advising the labor union or workers' representative of the contractor's commitments under the Equal Employment Opportunity section of this contract and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
D. In the event of the contractor's noncompliance with nondiscrimination clauses of this contract or with any such rules, regulations or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further County contracts.
E. The contractor will include the provisions of this section in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Board of County Commissioners of the County of Durham, North Carolina so that such provisions will be binding such subcontractor or vendor.
A-9. MINORITY and WOMEN BUSINESS ENTERPRISES:
A. Bidders are required to submit information about participating M/WBEs with their bid.
Each bidder shall identify on its bid the minority businesses that it will use on the project and an affidavit listing the good faith efforts it has made pursuant to N.C.
Gen. Stat. § 143-128.2(f). The information must include the name and address of each M/WBE, a description of the work to be performed by each, and the dollar value of the work to be performed by each. Any bidder who does not achieve the indicated M/WBE participation goal stated above is required to provide the aforementioned documentation demonstrating that good faith efforts were made in an attempt to meet the established goal. AFFIDAVITS A through D and APPENDIX E, are provided to record this information and must be completed and enclosed with your bid. Any bid which does not include M/WBE information and documentation may be considered non-responsive. The County’s Minority and Women Business Enterprise Ordinance may be obtained from the Durham County website at http://www.dconc.gov or by contacting the Durham County Purchasing Division.
B. The apparent lowest responsible, responsive bidder, within three (3) business days, shall also provide either (1) an affidavit (Affidavit C) that includes a description of the portion of work to be executed by minority businesses, expressed as a percentage of the total contract price, which is equal to or more than the applicable goal or (2) documentation of its good faith effort that was identified in the bid to meet the goal (Affidavit D), including any advertisements, solicitations, and evidence of other specific actions demonstrating recruitment and selection of minority businesses for participation in the contract. Failure to file the required affidavit or supporting documentation that demonstrates that the contractor made the required good faith effort is grounds for rejection of the bid.
C. M/WBE: A business which is at least 51% owned and controlled by minority group members or a woman. A M/WBE is bona fide only if the minority group or female ownership interests are real and continuing and not created solely to meet the M/WBE requirement. In addition, the M/WBE must itself perform satisfactory work or service or provide supplies under the contract and not act as a conduit. The contractual relationship must be bona fide.
http://www.dconc.gov/
Information Available to Bidders 00 31 00-6
D. Owned and controlled: (1) A sole proprietorship legitimately owned by an individual who is a minority group member or female; (2) a partnership or joint venture controlled by minorities and/or females; (3) a corporation or other entities controlled by minorities or females, and in which at least 51% of the voting interests and 51% of the beneficial ownership interests are legitimately held by minorities and/or females. These persons must control the management and operations of the business on a day-to-day basis.
E. A person who is a citizen or lawful permanent resident of the United States and who is:
a. “Black American”; a person having origins in any of the Black racial groups of Africa;
b. “Hispanic American”; a person of Spanish culture with origins in Mexico, Central or South America, or the Caribbean, regardless of race;
c. “Native American”; a person who is a member or is eligible to be a member of a federally recognized Indian tribe. A federally recognized Indian tribe means an Indian tribe, or band, nation, ranchero, pueblo, colony, or other organized group or community, including any Alaska native village, which is recognized by the Secretary of the Interior on October 1, 1985 as having special rights and is recognized as eligible for service provided by the United States to Indians because of their status as Indians, and any tribe that has a pending application for federal recognition on October 1, 1985, as having special rights and is recognized as eligible for services provided by the United States to Indians because of their status as Indians, and any tribe that has a pending application for Federal recognition on October 1, 1985.
F. During the construction of a project, if it becomes necessary to replace an M/WBE subcontractor, the prime contractor shall advise the owner. No M/WBE subcontractor may be replaced with a different subcontractor except (1) if the subcontractor’s bid is later determined by the contractor to be non-responsible or nonresponsive, or the listed subcontractor refuses to enter into a contract for the complete performance of the bid work or (2) with the approval of the Board for good cause.
Good faith efforts as set forth in N.C. Gen. State. § 143-131(b) shall apply to the selection of a substitute subcontractor. Prior to substituting a subcontractor, the contractor shall identify the substitute subcontractor and inform the Board or its designee of its good faith efforts pursuant to N.C. Gen. State. § 143-131(b).
G. If during the construction of a project additional subcontracting opportunities become available, the prime contractor shall make a good faith effort to solicit sub bids from M/WBEs.
H. Durham Public Schools periodically conducts Construction Information Meetings to engage the business community about current and future project opportunities.
Table 1 attached to this Section 00200 includes the list of participants of the most recent Construction Information Meeting. Many of these firms are M/WBE qualified and should be considered as viable participants in the bidding process. Durham Public Schools provides this list as information without endorsing the qualifications or capabilities of these firms or individuals. Bidders are encouraged to contact these
Information Available to Bidders 00 31 00-7 firms and individuals. Bidders are expected to independently evaluate applicability of M/WBE qualifications to the Work described herein and are encouraged to also utilize other reputable resources for M/WBE identification.
A-10. SITE CONDITIONS AND CONDITIONS OF THE WORK:
A. Each bidder must acquaint himself thoroughly as to the character and nature of the work to be done. Each bidder furthermore must make a careful examination of the site of the work and inform himself fully as to the difficulties to be encountered in the performance of the work, the facilities for delivering, storing and placing materials and equipment, and other conditions relating to construction and labor.
B. No plea of ignorance of conditions that exist or may hereafter exist on the site of the work, or difficulties that may be encountered in the execution of the work, as a result of failure to make necessary investigations and examinations, will be accepted as an excuse for any failure or omission on the part of the successful Bidder to fulfill in every detail all the requirements of the Contract Documents and to complete the work or the consideration set forth therein, or as a basis for any claim whatsoever.
C. Insofar as possible, the Successful Bidder, in carrying out his work, must employ such methods or means as will not cause interruption of or interference with the work of the Owner or any separate contractor.
A-11. BIDDER'S QUESTIONS, ADDENDA AND INTERPRETATIONS:
A. Bidders and Sub-bidders shall promptly notify the Design Consultant of any ambiguity, inconsistency or error which they may discover upon examination of the Bidding and Contract Documents or of the site and local conditions. No interpretation of the meaning of the drawings, specifications or other contract documents will be made to any Bidder orally.
B. Every request for such interpretation should be in writing addressed to the Design
Consultant with a copy forwarded to the Owner.
C. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Bidding Documents which, if issued, will be transmitted to all prospective Bidders (at the respective addresses furnished for such purposes) not later than three calendar days prior to the date fixed for the opening of bids.
Neither the Design Consultant nor the Owner will be responsible for any other explanations or interpretations of the proposed documents. Failure of any Bidder to receive any such addendum or interpretation shall not relieve any bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
D. Each Bidder shall ascertain prior to submitting his bid that he has received all
Addenda issued, and he shall acknowledge receipt and inclusion in his proposal of all Addenda.
A-12. SECURITY FOR FAITHFUL PERFORMANCE:
Information Available to Bidders 00 31 00-8
All bidders shall include in their bid the costs of a Performance Bond and a Labor and Material Payment Bond. The cost of bonds covering the base bid work is to be carried in the base bid only. The cost of bonds covering any alternate scopes of work is to be included within each individual alternate bid. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum, as security for the payment of all persons performing labor and furnishing materials under this Contract. The successful bidder shall provide a Performance Bond and a Labor and Material Payment Bond using the forms attached as Exhibits A and B. The Performance Bond and the Labor and Material Payment Bond shall be delivered to the Owner not later than the date of execution of the Contract.
A-13. TIME FOR COMPLETION AND LIQUIDATED DAMAGES FOR NON-COMPLETION:
The Substantial Completion date will be September 16, 2022, and Final Completion to be October 14, 2022. In the event of delay in Substantial of Final completion, the Contractor shall pay liquidated damages to DPS in the amount of Two Hundred Fifty ($250.00) per day.
A-14. LOCATION OF WORK:
The site of the proposed work is on Owner owned property, public streets, easements and/or other right-of-ways, as shown on the drawings.
A-15. LIABILITY INSURANCE AND WORKMEN'S COMPENSATION:
The Successful Bidder will be required to carry public liability and workmen's compensation and other insurance in the amounts and under the terms stipulated under the General Conditions.
A-16. BIDDERS REFERRED TO LAWS:
A. The attention of Bidders is called to the provisions of all Municipal, County and State laws, regulations, ordinances and resolutions, as well as laws, regulations, ordinance resolutions and permits relating to obstructing streets, maintaining signals, storing and handling of explosives, or affecting the Bidder, or his employees or his work hereunder in his relation to the Owner or any other person. The Bidder shall obey all such laws, regulations, ordinances, permits or resolutions controlling or limiting Contractors while engaged in the prosecution of work under this Contract.
B. The provisions of this contract shall be interpreted in accordance with the laws of
North Carolina and in accordance with the laws, ordinances, regulations, permits and resolutions of Durham County.
A-17. TAXES
All applicable Federal, State and Local Taxes shall be included in the Bidder's proposal.
The successful bidder shall provide the Owner with monthly documentation of North Carolina sales taxes paid for all purchases on the project in a form acceptable to the Owner.
Information Available to Bidders 00 31 00-9
DPS has determined this project to be a Capital Improvement as defined by the NC General Statute § 105-164.
A-18. RIGHT TO REJECT BIDS:
The Owner expressly reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept that bid which in its judgment, best serves the interest of the Owner.
A-19. EQUAL PRODUCTS AND SUBSTITUTIONS:
A. Whenever possible, the Design Consultant shall specify in the plans the required performance and design characteristics for materials as required by N.C. Gen. Stat.
§ 133-3. When it is impossible or impractical to specify the required performance and design characteristics for materials, the Design Consultant may use a certain brand, make, manufacturer, article, device, product, material, fixture, form or type construction by name, make or catalog number to convey the general style, type, character and standard of quality of the article desired. Unless specifically stated to the contrary, all materials, supplies and articles furnished under this Contract shall, whenever specified and otherwise practicable, be the standard products of recognized, reputable manufacturers. Unless otherwise specifically provided in the Contract Documents, the naming of a certain brand, make, manufacturer or article, device, product, material, fixture or type of construction shall convey the general style, type, character and standard of quality of the article desired and shall not be construed as limiting competition. If approval by the Design Consultant prior to bid opening is desired, the bidder shall request approval in writing at least ten (10) days prior to the bid date. The Design Consultant’s approval will be in the form of an Addendum to the Specifications issued to all prospective Bidders indicating that the additional makes or brands are equivalent to those specified. Nothing in this paragraph is intended to restrict or inhibit free and open competition on school system projects.
B. The bidder may request approval for substitutions of materials or type of construction in writing up to ten (10) days prior to the bid date. The standard for acceptance of substitutions shall be as expressed in Paragraph 4.15 of the contract General Conditions.
A-20. PREPARATION AND SUBMITTAL OF FORM OF BID:
A. Bids shall be submitted utilizing the Form of Proposal as bound herein, or otherwise provided with the Contract Documents, and shall be complete in every respect. The total bid amount shall be entered in words and figures in the space provided. Where applicable, the unit price or lump sum items, and their extensions, shall be entered in figures in the respective columns provided for each bid item. All entries shall be typewritten or printed in ink. The signatures of all persons shall be in longhand. Any entry of amount that appears on the face of the bid to have involved an erasure, deletion, white-out and/or substitution or other such change or alteration, shall show by them the initials of the person signing the bid and the date of the change or alteration. A failure to comply with this requirement may be cause for disqualification of the bid.
Information Available to Bidders 00 31 00-10
B. For Unit Price bids, in the event of any discrepancies between the unit prices and the extensions thereof or the total bid amount, the unit prices shall govern. For Lump Sum bids, in the event of a discrepancy between the bid amount in writing and that in figures, the written value shall govern.
C. Bids shall not contain any restatement or qualifications of work to be done, and alternate bids will not be considered unless called for. No oral bids or modifications will be considered.
D. The amount of a bid submitted by a subcontractor to the general contractor under the single prime contracting system shall not exceed the bid, if any, for the same work by that subcontractor to the Owner under the multiple prime system.
E. Each single-prime bid shall identify the contractors selected to perform the HVAC, plumbing and electrical work and the subcontractors’ respective bid prices for the work.
A-21. MODIFICATION OR WITHDRAWAL OF BID:
A. A Bidder may withdraw his bid from consideration if such bid was based upon a mistake as provided in North Carolina General Statute 143-129.1.
B. Prior to the time and date designated for receipt of bids, any bid submitted may be modified or withdrawn by notice to the party receiving bids at the place designated for receipt of bids. Such notice shall be in writing over the signature of the Bidder or by telegrams; if by telegram, written confirmation over the signature of the Bidder shall be mailed and postmarked on or before the date and time set for receipt of bids, and it shall be so worded as not to reveal the amount of the original bid.
C. Withdrawn bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with this Information for Bidders.
D. Bid security, if any is required, shall be in an amount sufficient for the bid as modified or resubmitted.
A-22. DETAILED BID BREAKDOWN:
If the Owner directs, the Bidder shall provide a detailed breakdown of his bid acceptable to the Owner. In addition to verifying accounting requirements, the breakdown may be used by the Owner to determine whether the Bidder has grossly misjudged the requirements of any area. Failure to provide the requested detailed breakdown may result in rejection of the bid proposal.
A-23. AWARD OF CONTRACT:
A. The contract will be awarded to the lowest responsive and responsible bidder under the single prime system, taking into consideration quality, performance, and the time specified in the bids for the performance of the contract.
B. The lowest bidder shall be determined by the aggregate amount of the unit prices set forth in the form of bid, if work is bid on a unit price basis, or the aggregate
Information Available to Bidders 00 31 00-11 amount of the Base Bid, plus any Alternates selected by the Owner. Single prime bids will be received and awarded according to state law.
C. A Responsive Bidder shall mean a Bidder who has submitted a bid which conforms, in all material respects, to the Bidding Documents.
D. A Responsible Bidder shall mean a Bidder who has the capability, in all respects, to perform fully the contract requirements and the moral and business integrity and reliability which will assure good faith performance. In determining responsibility, the following criteria will be considered:
1. The ability, capacity and skill of the Bidder to perform the contract or provide the service required;
2. Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference;
3. The character, integrity, reputation, judgment, experience and efficiency of the
Bidder;
4. The quality of performance of previous contracts or services. For example the following information will be considered:
a. the administrative and consultant cost overruns incurred by Owners on previous contracts with Bidder,
b. the Bidder's compliance record with contract general conditions on other projects,
c. the submittal by the bidder of excessive and/or unsubstantiated extra cost proposals and claims on other projects,
d. the Bidder's record for completion of the work within the Contract Time or within Contract Milestones and Bidders compliance with scheduling and coordination requirements on other projects,
e. the Bidder's demonstrated cooperation with the Owner or the Design Consultant and other contractors on previous contracts,
f. whether the work performed and materials furnished on previous contracts was in accordance with the Contract Documents;
5. The previous and existing compliance by the bidder with laws and ordinances relating to contracts or services;
6. The sufficiency of the financial resources and ability of the Bidder to perform the contract or provide the service;
7. The quality, availability and adaptability of the goods or services to the particular use required;
8. The ability of the Bidder to provide future maintenance and service for the warranty period of the contract;
9. Whether the Bidder is in arrears to the Owner on debt or contract or is a defaulter on surety to the Owner;
10. Whether the bidder has demonstrated a good faith effort to use M/WBEs as subcontractors;
Information Available to Bidders 00 31 00-12
11. Such other information as may be secured by the Owner having a bearing on the decision to award the contract, to include, but not limited to:
a. the ability, experience and commitment of the Bidder to properly and reasonably plan, schedule, coordinate and execute the Work,
b. whether the Bidder has ever been debarred from bidding or found ineligible for bidding on any other projects.
F. The purpose of the above is to enable the Owner in its opinion, to select the lowest responsible bidder. The ability of the low Bidder to provide the required bonds will not of itself demonstrate responsibility of the Bidder.
G. In addition to the qualifications package submitted with the bid, the Owner reserves the right to require from the Bidder: (1) submissions of additional references, within seven days of bid opening, to include a listing of previous and current projects and
(2) financial statements indicating current financial status, prepared in accordance with generally accepted accounting principles, by a CPA licensed to do business in North Carolina, and (3) any other information deemed necessary in order to establish the responsiveness and responsibility of the bidder.
H. The Owner reserves the right to defer award of this contract for a period of Sixty (60) days after the due date of bids. During this period time, the Bidder shall guarantee the prices quoted in his bid.
A-24. ADDITIONAL REQUIREMENTS:
A. All bidders must complete the Vendor Application/Bidder Profile Form and include it with their bid package. This information will be used to create or update Durham County's electronic Bidder/Vendor files.
B. Security of Non-public Records: Pursuant to N.C.G.S. § 132-1.7, entitled, “Sensitive
Public Security Information”, public records, as defined in G.S. 132-1, shall not include information containing specific details of public security plans and arrangements or the detailed plans and drawings of public buildings and infrastructure facilities. Therefore, all information provided, received, gathered or obtained by Bidder containing specific details of public security plans and arrangements or the detailed plans and drawings of public buildings and infrastructure facilities shall be held confidential and shall be used by the Bidder only for the purpose of responding to this bid. All plans and drawings shall be returned to the Owner no later than the bid closing date. Any breach of this paragraph by the Bidder may result in Bidder being barred from being awarded any contracts with the Owner.
C. To ensure a fair bidding process, questions and/or clarifications requested by contractors will be accepted up to seven (7) days prior to Bid Opening.
Bidders/contractors are required to submit their questions in writing to District Purchasing <Dist.Purchasing@dpsnc.net> with the subject line “LF xwalk”.
D. The following forms must be returned:
a. Bid Forms
b. Non-Collusion Affidavit
Information Available to Bidders 00 31 00-13
c. Bid Bond
d. Power of Attorney
e. Vendor Application and W-9 Form
f. M/WBE Forms:
i. Identification of Minority Business Participation with contract amounts ($),
- AND -
ii. Affidavit A – Listing of Good Faith Efforts - OR -
iii. Affidavit B – Intent to Perform Contract with Own Workforce
g. Statement of Qualifications E. Following the bid opening, the Owner will issue a Determination of Apparent Low letter to the contractor it has deemed to be the apparent low responsible, responsive bidder based on the initial bid documentation. The contractor is required to submit Affidavit C or D including all statute-required back-up information within seventy-two (72) hours of the receipt of the letter.
F. Within 14 calendar days of the contract award, the contractor shall submit a complete list of all identified subcontractors the contractor will use on the project.
G. ASBESTOS-CONTAINING BUILDING MATERIALS IN SCHOOL FACILITIES:
Asbestos-containing building materials must not be disturbed if encountered during repairs, renovations, and other construction and installation activities. If disturbance of these materials cannot be reasonably avoided, no work shall begin until Durham Public School System has been notified and has issued specific instructions on the proper procedures for the activity in accordance with federal, state and local regulation. If Asbestos is identified DPS shall perform asbestos and lead based paint surveys of the affected areas of the facility.
H.
RELATED SECTIONS:
A. Exhibit A – Performance Bond Form (Section 00 61 13) B. Exhibit B – Material and Labor Payment Bond Form (Section 00 61 13)
END OF INFORMATION FOR BIDDERS
BID FORM Section 00 41 13.02 Contractor Initials & Date
Section 00450 Single Prime General Construction Bid Form
Contract: [ENTER CONTRACT TYPE]
Project: [ENTER NAME OF PROJECT HERE] Durham Public Schools Board of Education Durham County, NC
Bidder:
Date:
The undersigned, as bidder, hereby declares that the only person or persons interested in this proposal as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this proposal or in the contract to be entered into; that this proposal is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without collusion or fraud.
The Bidder further declares that he has examined the site of the work and the contract documents relative thereto, has read all special and supplemental provisions furnished prior to the opening of bids, has satisfied himself relative to the work to be performed, and thereby proposes and agrees if this proposal is accepted, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .