REI_CP14_EastRLUOB_Safe_Passage_SOW.pdf

PDF 96 KB Posted

Attached to
REI CP14 East RLUOB Safe Passage
Solicitation number
173549
Issued by

About this file

Scope of Work

View the file

Other files

File Type Posted
REI_CP14SupplierSubcontractorQuestionnaire.docx DOCX document
REI_CP14SupplierQualityQuestionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Notice For Federal Business Opportunities - Subcontracts Page 1 of 1 Rev. 03, Dated November 09, 2011 173549-RFP,REI CP -14 – East RLUOB Safe Passage

Notice for Federal Business Opportunities General Information:

Document Type: Sources Sought

Solicitation Number: 173549

Title: REI CP14 - East RLUOB Safe Passage

Response Date: 13 Dec 2011

Classification Code: Y

NAICS: 238990

Small Business Set Aside: Yes

Recovery Act Project: No

Contracting Office Address:

Acquisition Services Management - CMRR Project Los Alamos National Laboratory (DOE Contractor) PO Box 1663 MS D442 Los Alamos, NM 87545.

Point(s) of Contact:

Primary: Name: Thomas Nielander

E-Mail: tenielan@lanl.gov

Description:

BACKGROUND:

The Chemistry and Metallurgy Research Replacement (CMRR) Project is issuing this Request for Expression of Interest and Prequalification Data (REO) for a potential construction subcontract for the Radiological Laboratory Utility Office Building (RLUOB) at the Los Alamos National Laboratory.

This request does not represent any confirmation by LANS of inclusion on the final bidders list, notification of subcontract award or authorization to commence any work related to this request.

INSTRUCTIONS:

All interested, capable, and responsible sources that wish to respond to this sources sought are required to download the supplementary document(s) included on the posting website.

The supplements include a summary scope of work and several questionnaire(s) that must be completed in their entirety and returned electronically to the identified Point(s) of Contact by the Requested Response Date. The questionnaires are designed to evaluate general subcontractor capabilities (technical and financial), safety experience, and quality experience.

Once the sources sought requirement has closed, the CMRR Project will Pre-Qualify offerors based on accurate and complete submission of the questionnaire(s).

Request for Expression of Interest, Subcontract Page 1 of 2 Rev. 02, Dated November 09, 2011 173549-RFP, REI CP -14 – East RLUOB Safe Passage moo+

Request for Expression of Interest

173549 – RFP

REI CP–14 – East RLUOB Safe Passage

For The Chemistry & Metallurgy Research Replacement (CMRR) Project

Los Alamos National Laboratory (LANL) is seeking Expressions of Interest and Prequalification Data from qualified firms for the services described below.

GENERAL NOTES:

The Chemistry and Metallurgy Research Replacement (CMRR) Project is issuing this Request for Expression of Interest and Prequalification Data (REO) for a potential construction subcontract for the Radiological Laboratory Utility Office Building (RLUOB) at the Los Alamos National Laboratory.

This request does not represent any confirmation by LANS of inclusion on the final bidders list, notification of subcontract award or authorization to commence any work related to this request.

SCOPE OF WORK:

The SUBCONTRACTOR shall furnish qualified personnel, equipment, tools, supplies, transportation, hoisting, technical supervision, professional expertise and materials to safely perform all Work necessary for completion of rough grading, sidewalks, curb and gutter and other misc. items. The work includes, but is not limited to the following items and conditions:

• Remove the existing asphalt from the Pajarito Road and Pecos Drive as necessary to allow for the installation of the new curb, gutter and sidewalk and westward as necessary to the cut slope east of RLUOB including rough grading.

• Remove and dispose of the existing concrete curb, gutter and sidewalk at the Pajarito Road and Pecos drive intersection as required to transition from the existing sidewalk into the new construction.

• Furnish, place and finish approximately 450 feet of new concrete curb & gutter.

• Furnish, place and finish approximately 450 feet of new 4” thick 10’wide concrete sidewalk.

• Develop a temporary traffic control plan.

• Remove existing fence as needed to perform work.

• Stabilize site.

• Furnish place and compact base course under sidewalk if inspection after removal of the asphalt indicates adequate base course is not already installed.

Exclusions to Scope of Work

• Landscaping after installation of the new sidewalk.

• Re-installation of fence after completion of subcontract.

• Disposal of removed asphalt.

Request for Expression of Interest, Subcontract Page 2 of 2 Rev. 02, Dated November 09, 2011 173549-RFP, REI CP -14 – East RLUOB Safe Passage

SAFETY PREREQUISITES:

Subcontractor must demonstrate safety performance equal to or lower than the following standards:

Statistical Standards

Experience Modification Rate

The “EMR” is a number that is assigned to your company based on the insurance premium you pay and your loss statistics. Contact your insurance company for these numbers.

Maximum Allowable Average:

1.00

Total Recordable Injury/Illness Case Rate

(from Company OSHA 300 log)

Rate =

Total Recordable Injuries/Illnesses x 200,000 Total Employee Hours Worked

Maximum

3.2

DART Case Rate (Days Away From Work, Restriction, or Job Transfer) (from Company

OSHA 300 log)

Rate =

Total Days Away/Restricted/Transferred Work Day Cases x 200,000

Total Employee Hours Worked

Maximum

1.4

/moo+