SECTION B

PRICING

SCHEDULE

ITEM U/M U/P TOTAL

1 Imported Pipe Embedment - TP 02200 4 * YD3 $ $ 2 Paved Utility Road Crossing (Open Cut) - TP 02228 30 * LF $ $ 3 Solid Rock Removal - TP 02229 2 * YD3 $ $ 4 4-Inch PVC Water Main - C900, CL 150 - TP 02667 400 * LF $ $ 5 2-inch Flush Hydrant Assembly - TP 02667 2 * EA $ $

6 1 * EA $ $

7 1 * EA $ $

8 Air Release Combination Valve - TP 02667 1 * EA $ $ 9 Connection to Existing Water Main - TP 02667 2 * EA $ $

10 1,800 * LF $ $

11 150 * LF $ $

12 300 * LF $ $

13 13 * EA $ $

14 2 * EA $ $

15 Connection to Existing Utilities - TP 02668 4 * EA $ $ 16 House Connection without PRV- TP 02668 8 * EA $ $

17 7 * EA $ $

18 13 * EA $ $

19 8 * EA $ $

20 6 * EA $ $

21 1 EA $ $

22 3 * EA $ $

23 7 * EA $ $

24 3 * EA $ $

25 2,100 * LF $ $

26 15 * EA $ $

27 3,150 * LF $ $

28 10 * EA $ $

29 5 * EA $ $

30 1 * EA $ $

31 1 * EA $ $

32 60 * HR $ $

32 45 * HR $ $

33 ** EA ** **

34 ** EA ** **

EST QTY

B. 1500-Gallon

House Connection with PRV- TP 02668 Water Meter and Box - TP 02668 Septic Tank - TP 02740

The following Pricing Schedule is based on estimated quantities required to meet the specifications. The total extended prices shall be used for bid evaluation purposes only. The actual amount to be paid by the Government under the contract shall be computed on the actual quantities installed at the unit bid prices awarded. Work performed under the contract will be ordered by issuance of delivery orders in accordance with clause 52.216-18 Ordering (See Section I). The designated ordering office is the

Contracting Office, Indian Health Service Service/California Area Office, Sacramento, CA.

DESCRIPTION

D. 2-inch PVC Water Service Connection - TP 02668 A. 1-Inch B. 2-Inch

A. 1200-Gallon

Screened Baffle - TP 02740

C. 1200-Gallon Traffic Rated

PRICING SCHEDULE - BASE PERIOD

A. 2-Inch B. 4-Inch

Gate Valve and Box - TP 02667

Water Serviceline - TP 02668 A. 1-Inch PE B. 1-inch PVC

Connection to Existing Septic Tank Septic Tank Manhole Riser - TP 02740 Septic Tank Abandonment - TP 02740

Distribution Box - TP 02741 Flow Divider - TP 02740 Diversion Valve - TP 02740

4-Inch PVC Solid Sewer Pipe - TP 02740 4-Inch PVC Sewer Service Cleanout - TP 02740 Chamber Drainfield - TP 02740

Potholing - TP 02200 Mobilization/Demobilization Water Service Connection Fees Sewer Service Connection Fees

SUBTOTAL BASE PERIOD $

ITEM EST QTY U/M U/P TOTAL

101 4 * YD3 $ $

102 50 * LF $ $

103 2 * YD3 $ $

104 400 * LF $ $

105 2 * EA $ $

106 1 * EA $ $

107 1 * EA $ $

108 1 * EA $ $

109 2 * EA $ $

110 1,800 * LF $ $

111 150 * LF $ $

112 300 * LF $ $

113 11 * EA $ $

114 2 * EA $ $

115 4 * EA $ $

116 8 * EA $ $

117 7 * EA $ $

118 13 * EA $ $

119 8 * EA $ $

120 6 * EA $ $

121 1 * EA $ $

122 3 * EA $ $

123 7 * EA $ $

124 3 * EA $ $

125 4-Inch PVC Solid Sewer Pipe - TP 02740 2,100 * LF $ $ 126 4-Inch PVC Sewer Service Cleanout - TP 02740 15 * EA $ $

127 3,150 * LF $ $

128 10 * EA $ $

129 5 * EA $ $

130 1 * EA $ $

131 1 * EA $ $

132 60 * HR $ $

132 45 * HR $ $

133 ** EA ** **

134 ** EA ** **

PRICING SCHEDULE - OPTION PERIOD

The following Pricing Schedule is based on estimated quantities required to meet the specifications. The total extended prices shall be used for bid evaluation purposes only. The actual amount to be paid by the Government under the contract shall be computed on the actual quantities installed at the unit bid prices awarded. Work performed under the contract will be ordered by issuance of delivery orders in accordance with clause 52.216-18 Ordering (See Section I). The designated ordering office is the

Contracting Office, Indian Health Service Service/California Area Office, Sacramento, CA.

DESCRIPTION

Imported Pipe Embedment - TP 02200 Paved Utility Road Crossing (Open Cut) - TP 02228 Solid Rock Removal - TP 02229 4-Inch PVC Water Main - C900, CL 150 - TP 02667

A. 2-Inch

2-inch Flush Hydrant Assembly - TP 02667 Gate Valve and Box - TP 02667

B. 4-Inch Air Release Combination Valve - TP 02667 Connection to Existing Water Main - TP 02667 Water Serviceline - TP 02668 A. 1-Inch PE B. 1-inch PVC

C. 1200-Gallon Traffic Rated

D. 2-inch PVC Water Service Connection - TP 02668 A. 1-Inch B. 2-Inch Connection to Existing Utilities - TP 02668 House Connection without PRV- TP 02668

Flow Divider - TP 02740 Diversion Valve - TP 02740 Screened Baffle - TP 02740 Potholing - TP 02200

House Connection with PRV- TP 02668 Water Meter and Box - TP 02668 Septic Tank - TP 02740 A. 1200-Gallon B. 1500-Gallon

Mobilization/Demobilization

SUBTOTAL OPTION YEAR ONE

Sewer Service Connection Fees Water Service Connection Fees

Connection to Existing Septic Tank Septic Tank Manhole Riser - TP 02740 Septic Tank Abandonment - TP 02740

Chamber Drainfield - TP 02740 Distribution Box - TP 02741

TOTAL BASE YEAR:

TOTAL OPTION YEAR:

TOTAL BID

1 Prices must be submitted on all individual items of this CLIN schedule. Failure to do so may cause the proposal to be determined "unacceptable."

2 If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the CLIN schedule must be stated. If it is not stated, the Offeror/Bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the CLIN schedule.

3 The Offeror/Bidder shall distribute his indirect costs (overhead, profit, bond, etc) over all the items in the CLIN schedule. The Government will review all submitted CLIN schedules for any unbalancing of the items. Any submitted CLIN schedule determined to be unbalanced may cause the proposal to be determined "unacceptable."

4 In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the Offeror/Bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

5 Arithmetic Discrepancies. For the purpose of initial evaluation of bids the following will be utilized in resolving arithmetic discrepancies found on the face of the CLIN schedule as submitted by the bidder.

(a) Obviously misplaced decimal points will be corrected;

(b) Discrepancy between unit price and extended price, the unit price will govern;

(c) Apparent errors in extension of unit prices will be corrected;

(d) Apparent errors in addition of lump sum and extended prices will be corrected.

For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepanies as provided above and the bid will be so reflected on the abstract of bids.

These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

6 Dewatering prices will be negotiated on a site specific basis.

7 All quantities are estimated, reference FAR 52.211-18 Variation in Estimated Quantity

7 Water Service Connection Fees and Sewer Service Connection Fees** The cost of these fees will be reimbursed as indicated on each delivery order at the actual cost of the connection or permitting fees.

PRICING SCHEDULE NOTES

SECTION C

TECHNICAL

SPECIFICATION

TECHNICAL PROVISIONS

Section Number Title

02100 Mobilization and Demobilization

02110 Site Clearing

02200 Excavating, Trenching, and Backfilling

02228 Utility Road Crossing

02229 Rock Removal

02510 Asphaltic Concrete Paving

02667 Water Mains

02668 Water Service Lines

02675 Disinfection and Bacteriological Testing of Water Main System

02732 Sewer Service Lines

02740 Septic Tank Drainfield System

03300 Cast-in-Place Concrete

Revised 4/29/2015 02100 – Mobilization & Demobilization p. 1 of 2

SECTION 02100

MOBILIZATION AND DEMOBILIZATION

PART 1 – GENERAL

1.1 SECTION INCLUDES

A. This section includes mobilization and demobilization to and from the jobsite.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT

A. Mobilization and Demobilization: Paid by the hour based upon the roundtrip time spent traveling by the Contractor to mobilize and demobilize to and from the jobsite(s) from his base of operations utilizing the most efficient and direct route as agreed upon by the Project Engineer. When two or more sites are to be served as part of a round trip, there will be only one accounting of time “from home base to the jobsite(s)” and from the “jobsite(s) to the base of operations”. As noted above, time spent in mobilizing directly from one jobsite to another will be accounted for under this line item. There will not be multiple payments for trips to and from the same site. For a single site this is limited to a maximum of 8 hours.

PART 2 – PRODUCTS

NONE

PART 3 – EXECUTION

3.1 PREPARATION

A. Make arrangements to contact all public works departments and Tribal Business Center prior to mobilizing on job site location and secure all necessary permits prior to performing work.

B. Notify Government 48 hours in advance prior to mobilization to job site location.

3.2 MOBILIZATION

A. Move materials, equipment, and laborers as necessary to job site location with minimal disturbance.

3.3 DE-MOBILIZATION

A. Remove all materials, equipment, laborers, solid waste and debris created by

Revised 4/29/2015 02100 – Mobilization & Demobilization p. 2 of 2 construction activities from job site location.

B. Maintain minimal disturbance to site upon departure.

END OF SECTION

Revised 08/29/01 02110 – Site Clearing p. 1 of 2

STANDARD SPECIFICATIONS

SECTION 02110

SITE CLEARING

A. This section includes protection of facilities, clearing site of incidental paving and curbs, surface debris, grass, trees, and other plant life in preparation for site or excavation work.

A. There is no separate payment for work under this section. Merge work required with pay items defined within the Measurement and Payment portion of other Sections of this contract.

1.3 RELATED SECTIONS

A. Section 02200 – Excavating, Trenching, and Backfilling

NONE

3.1 PROTECTION

A. Locate, identify, and protect existing facilities (remaining), from damage.

B. Identify and protect trees, plant growth, and features designated to remain as final landscaping.

C. Protect bench marks from damage or displacement.

3.2 CLEARING

A. Clear only those areas required for access to site and execution of Work.

Revised 08/29/01 02110 – Site Clearing p. 2 of 2

B. Remove paving, curbs, and other structures or debris per drawings.

3.3 REMOVAL

A. Remove paving, brush, trees, and other debris and dispose of off-site.

3.4 TOPSOIL EXCAVATION

A. Excavate topsoil from areas to be further excavated or re-graded.

B. Stockpile topsoil in designated area.

1. Protect from erosion.

2. Remove excess topsoil from site.

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 1 of 9

SECTION 02200

EXCAVATING, TRENCHING AND BACKFILLING

A. This Section includes regulatory requirements, protection, imported pipe embedment, excavation, backfilling, compaction, quality control, and restoration.

A. Work required under Section 02200 shall be merged with pay item defined within the Measurement and Payment portion of other Sections of this contract. Imported Pipe Embedment, Imported Structural Fill and Cement Slurry Fill are exceptions.

B. Imported Pipe Embedment: Paid by the cubic yard, measured to the nearest 0.1 yd3. Includes delivery, protection, placement, compaction of imported pipe embedment. Quantity of embedment measured for payment shall not exceed the quantity derived from calculating compacted, in-place volume, as shown on plans, drawings or specifications.

C. Imported Structural Fill: Paid by the cubic yard, measured to the nearest 0.1 yd3.

Includes delivery, protection, placement, compaction of imported structural fill.

Quantity of fill measured for payment shall not exceed the quantity derived from calculating compacted, in-place volume, as shown on plans, drawings or specifications.

D. Cement Slurry Fill: Paid by the cubic yard, measured to the nearest 0.1 yd3.

Includes delivery, protection and placement of concrete slurry fill. Quantity of fill measured for payment shall not exceed the quantity derived from calculating, in-place volume, as shown on plans, drawings or specifications.

E. Potholing: Paid by the hour, measured to the nearest half hour. Only to be done as requested by Engineer for location of existing utilities or for soil testing.

Includes excavating, backfilling, compacting, site clearing and restoring site to its original condition. No payment shall be made for mobilization and demobilization to and from site.

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 2 of 9

A. Section 02110 – Site Clearing

B. Section 02229 – Rock Removal

C. Section 02667 – Water Mains

D. Section 02668 – Water Service Lines

E. Section 03300 – Cast-in-Place Concrete

1.4 REFERENCES

A. ASTM D698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, Using 5.5 lb (2.5 Kg) Rammer and 12 inch (300 mm) Drop.

B. ASTM D1556 - Test Method for Density of Soil in Place by the Sand-Cone

Method.

C. ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and

Soil-Aggregate Mixtures Using 10 lb (4.5 Kg) Rammer and 18 inch (450 mm) Drop.

D. ASTM D2922 - Test Methods for Density of Soil and Soil-Aggregate in Place by

Nuclear Methods (Shallow Depth).

E. ASTM D3017 - Test Methods for Moisture Content of Soil and Soil-Aggregate

Mixtures.

F. ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates.

G. ASTM D2321 - Recommended Practice for Underground Installation of Flexible

Thermoplastic Sewer Pipe.

H. State of California, Department of Transportation, Latest Edition of the Standard

Specifications.

1.5 REGULATORY REQUIREMENTS

A. Project Engineer to obtain an Encroachment/Trenching Permit from the local roads authority prior to construction. Contractor to comply with the requirements of the encroachment/trenching permit.

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 3 of 9

B. In accordance with the requirements of Section 6705 of the Labor Code of the State of California, submit a detailed plan to the Engineer before excavation, showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches 5 feet or more in depth.

C. Submit the plan to the Project Engineer prior to start of excavation.

1.6 DEFINITIONS

A. Utility: Any buried pipe, duct, conduit, or cable.

B. Structure: Foundation, manhole, septic tank, cleanout, catch basin, or culvert.

C. Solid Rock: Large continuous masses of igneous, metamorphic, or sedimentary rock, which in the opinion of the Project Engineer cannot be excavated without drilling and blasting. Soil that is capable of being excavated with rippers is not considered solid rock.

D. Loose Rock: Boulders and other detached stones, with a minimum volume of 1 cubic yard.

1.7 FIELD MEASUREMENTS

A. Verify that survey benchmarks, control points, and intended elevations are as shown on drawings.

1.8 PROTECTION

A. Barricade open excavations.

B. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

C. Provide safe conditions for workers and passers-by.

2.1 IMPORTED PIPE EMBEDMENT

A. Use crushed stone or gravel that is free of shale, clay, friable material, and debris.

Grade in accordance with ASTM C136, within the following limits:

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 4 of 9

Sieve Size Percent Passing 1 in 100 3/4 in 90 to 100 3/8 in 20 to 55

no. 4 0 to 10

no. 8 0 to 5

2.2 IMPORTED STRUCTURAL FILL

A. Use imported soil (if required) that has angular fragments and a low expansion index (less than 30 per ASTM D 4829). Use imported fill that complies with the requirements of Caltrans Class 3 Aggregate Subbase:

3 in 100

2.5 in 87 to 100

no. 4 45 to 100

no. 200 0 to 34

2.3 DRAINAGE ROCK

2 in 100 ¾ in 35 to 70

no. 4 0 to 5

2.4 CEMENT SLURRY FILL

A. Slurry cement backfill shall consist of a fluid, workable mixture of aggregate, cement and water that will flow without segregation of the aggregate while being placed.

B. Water used for mixture shall be free from oil, salts and other impurities which would have an adverse effect on the quality of the backfill material.

C. Not less than 188 lbs of cement shall be used for each cubic yard of material produced.

D. The aggregate shall can be commercial quality concrete sand or material meeting the following gradation:

1 ½” 100 1” 80 to 100 ¾” 60 to 100

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 5 of 9

3/8” 50 to 100 No. 4 40 to 80 No. 100 10 to 40

A. Notify Underground Service Alert (800) 227-2600 in Northern and Central California and (800) 422-4133 in Southern California prior to excavation.

Comply with their notice requirements.

B. Identify required lines, levels, contours, and datum locations.

C. Protect plant life, lawns, rock outcropping, and other features remaining as final landscaping.

D. Protect benchmarks, existing structures, fences, and paving from excavating equipment and vehicular traffic.

E. Maintain and protect utilities and structures which are to remain.

3.2 EXCAVATION

A. Use open cut method on all excavation unless otherwise shown on the drawings, required by permit, or approved in writing by the Project Engineer.

B. Stockpile excavated material in designated area on site, and remove excess material from site.

C. Grade top perimeter of excavation to prevent surface water from entering.

3.3 CLASSIFICATION OF EXCAVATION

A. All excavation with equipment commonly used in the industry is classified as common excavation (except for drilling and blasting).

B. All material drilled and blasted for removal is classified as rock excavation.

Inform the Project Engineer prior to rock excavation to determine pay measurement.

3.4 TRENCH EXCAVATION

A. Cut trenches sufficiently wide to enable installation and inspection. Remove

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 6 of 9 water or materials that interfere with work.

B. Maintain trench sides as vertical as possible--between 12 inches and 24 inches wider than the outside diameter of the pipe barrel--below pipe level.

C. Excavate trench width above the pipe as wide as necessary for shoring, sheeting, and installation.

D. Center trench excavation on pipe alignment for a minimum clearance of 6 inches on each side of the pipe.

E. Hand trim for bell and spigot pipe joints. Remove loose matter.

F. Restore over-excavated areas. If the trench bottom is over-excavated below the intended grade, fill over-excavation with imported pipe embedment and compact to density equivalent to the in situ material.

G. Remove lumped subsoil, boulders, and rock up to ½ yd3 (measured by volume).

H. Excavate for additional trench depth when soil prevents adequate pipe support.

Refill addition with imported pipe embedment. Remove large rock, boulders, and large stones to provide 3 inches of soil cushion on all sides of the pipe and pipe accessories.

I. Length of trench that may be left open at any one time is 100 yards. Do not leave trench open over night.

J. Stockpile excavated material in designated area on site, and remove excess material from site.

3.5 STRUCTURE EXCAVATION

A. Excavate for structures down to the levels indicated on the drawings. Excavate as large as necessary to accommodate the work forms. Comply with all safety regulations.

B. Excavate a sufficient distance from walls and footings to provide forming except where concrete for walls or footings is directly against excavated surfaces.

C. Do not excavate below depths indicated in the drawings. Restore over-excavated areas to proper elevation by filling with imported structural fill. Do not interfere with 45 degree bearing splay of foundations.

D. Hand trim the bottom of the excavation to prevent disturbing the soil below the required depth.

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 7 of 9

3.6 BACKFILLING

A. Use care to prevent disturbance or damage to utilities or structures in trench.

B. Maintain optimum moisture content to attain required compaction density.

C. Remove surplus fill materials from site.

D. Leave fill material stockpile areas free of excess fill materials.

3.7 TRENCH BACKFILLING

A. Use excavated soil as embedment unless Project Engineer determines it unsuitable. Unsuitable material is defined as incapable of being compacted to specified density with optimum moisture content, solid or loose rock, lump material larger than 1 inch, organic matter, or debris.

B. Use excavated soil as final backfill unless Project Engineer determines it unsuitable. Unsuitable final backfill material is solid or loose rock larger than 6 inches or lumps larger than 3 inches. Do not use organic matter or debris.

C. Backfill pipe embedment material in uniform layers on all sides of the pipe in lifts not to exceed 6 inches.

D. Use the following methods when placing final backfill material unless otherwise required by permits or authority.

Compact Not to Exceed (In loose measure) Roadways 6 inches thick Rights-of-way and outside roadway 12 inches thick Unimproved surfaces 24 inches thick

3.8 STRUCTURE BACKFILLING

A. Place structure fill material in uniform layers on all sides of the structure 6 inches thick.

B. Do not fill structure material until the structure footing or other portions of the structure have been inspected

C. Use excavated soil as final backfill material unless Project Engineer determines it unsuitable. Unsuitable final backfill material is solid or loose rock larger than 6 inches or lumps larger than 3 inches. Do not use organic matter or debris.

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 8 of 9

3.9 CEMENT SLURRY BACKFILLING

A. Maintain a minimum of 6 inches clear distance between the outside of pipe and the side of the excavation for pipes 42” in diameter and smaller.

B. Compacted earth plugs or other suitable system shall be placed as the ends of the trench to receive slurry backfill to completely contain the slurry in the trench.

C. Place cement within 1 hour after mixing.

D. Place in a uniform manner that will prevent voids in, or segregation of, the backfill, and will not float or shift the pipe.

E. Backfilling over or placing any material over the slurry cement backfill shall not commence until 4 hours after the slurry has been placed, except that when concrete sand is used for the aggregate and the in-place material is free draining, back filling may commence as soon as the surface water is gone.

F. Cement Slurry Backfill shall not be used where it will be in contact with aluminum and aluminum coated materials.

3.10 COMPACTION

A. Compact final backfill to the percentage of maximum density determined by ASTM D1557 unless otherwise specified by permit or authority.

Percent of Maximum Density Initial Final Location Bedding Haunching Backfill Backfill

Roadways, Improved Surfaces 95 95 95 95

Roadway Rights-of-Way Outside of Roadway 90 90 90 90 Prism

Unimproved Surfaces, Fields, Etc. 90 90 80 80

Backfill Around Structures 95 95 95 95

3.11 FIELD QUALITY CONTROL

A. The government, at its discretion, may acquire the services of a certified soils

Revised 08/29/01 02200 – Excavating, Trenching, and Backfilling p. 9 of 9 testing laboratory to perform baseline Modified Proctor density tests in accordance with ASTM D1557 or latest revision:

1. Tests may be performed at locations approved by Project Engineer.

2. Test results from tests prior to construction will be made available to the contractor.

3. Testing is at the government's expense.

B. Compaction testing will be determined at the Project Engineer's discretion.

C. If work does not meet specified requirements, remove, replace, and retest. All re-testing is at the contractor’s expense.

3.12 PROTECTION OF FINISHED WORK

A. If vehicular traffic has altered finished work, reshape and re-compact fills.

3.13 SIDEWALK, CURB AND GUTTER RESTORATION:

A. Restore the sidewalks, curbs, and gutters to their original condition. Comply with the standards and construction requirements of the local authority.

B. Machine compact backfill under the sidewalk as follows:

1. Cut the existing curb or sidewalk to a neat line.

2. Match the depth of base course material with that present under adjacent curbs or sidewalks.

3. Match to the existing concrete walk in width, thickness, slope, and finish, but not less than 4 inches in thickness.

4. Use wire mesh reinforcement; 6 inch by 6 inch.

Revised 01/13/2017 02228 – Utility Road Crossing p. 1 of 4

SECTION 02228

UTILITY ROAD CROSSING

A. This section includes submittals, materials, cutting, trenching, boring, and patching.

A. Paved Utility Road Crossing (open cut): Paid by the linear foot at the unit price as stated in the bid schedule and includes: traffic control, saw cutting and removal of existing pavement, excavation, backfill (native material), replacement of subgrade and asphalt or concrete in accordance with all applicable state and local regulations, and all appurtenances. Note: Water or sewer pipeline installed at road crossings shall be measured and paid on a per lineal foot basis in accordance with their respective bid items.

1.3 REFERENCES

A. ASTM D3515 - Hot-mixed, hot laid bituminous paving mixtures.

B. ASTM C136 - Method for Sieve Analysis of Fine and Coarse Aggregates.

1.4 RELATED SECTIONS

A. Section 02200 - Excavating, Trenching, and Backfilling

B. Section 02510 – Asphaltic Concrete Paving

1.5 SUBMITTALS

A. Submit a written request to Project Engineer and road owner prior to cutting or boring for utility road crossing, including:

1. Location and description of affected work.

2. Necessity for cutting or alteration.

Revised 01/13/2017 02228 – Utility Road Crossing p. 2 of 4

3. Description of proposed work and products to be used.

4. Alternatives to cutting and patching.

5. Date and time work will be executed.

6. Source of asphaltic mixture.

B. Obtain an Encroachment/Trenching Permit from the local roads authority prior to construction. Comply with the requirements of the Permit.

2.1 MATERIALS

A. Tack Coat: Homogeneous, medium curing, liquid asphalt, in accordance with standards of CALTRANS or local authorities.

B. Asphalt: Hot mixed, hot laid bituminous mixture.

C. Manufacturer: By approval of Project Engineer.

D. Asphalt Nominal Width: 12” greater than the trench width Dimensions: Depth Range: 2” to 4” Length: As specified in the site drawing

E. Casing: ASTM A53, schedule 40 black pipe, or as required by local permitting agency.

F. Piping: As specified in the site drawing.

3.1 EXAMINATION

A. Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching.

B. After uncovering existing work, assess conditions affecting performance of work.

C. Beginning of cutting or patching means acceptance of existing conditions.

3.2 PREPARATION

Revised 01/13/2017 02228 – Utility Road Crossing p. 3 of 4

A. Provide temporary supports to ensure structural integrity of the Work. Provide devices and methods to protect other portions of Project from damage.

B. Provide protection from elements for areas which may be exposed.

C. Maintain excavations free of water.

D. Provide traffic control in compliance with local road ordinances.

3.3 CUTTING

A. Cut rigid materials using cutting wheel or pneumatic pavement cutter.

B. Cut clean, vertical, and straight. Cut above any pavement fractures.

3.4 TRENCHING AND PIPE INSTALLATION

A. Perform trenching in accordance with Section 02200 (Excavating, Trenching, and Backfilling).

B. Install the water main or service line pipe inside the steel casing. Protect the pipe within the casing by installing redwood skids. Equally space at least four skids around the perimeter of the pipe at distances specified in the drawing.

3.5 PATCHING

A. Apply tack coat to contact surfaces including curbs, gutters, and concrete pads in accordance with manufacturer's instructions.

B. Apply hot mix asphalt within 24 hours after tack coat application.

C. Place to 3” compacted thickness or to thickness required by local permitting agency or if otherwise specified. Compact pavement by rolling to specified density. Hand compact in areas inaccessible to rolling equipment.

D. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks. Create smooth transition between existing and newly finished pavement.

E. Perform patching prior to deterioration of clean, vertical cutting edge.

3.6 FIELD QUALITY CONTROL

A. Do not patch over wet subgrade.

Revised 01/13/2017 02228 – Utility Road Crossing p. 4 of 4

B. Do not patch when ambient temperature is below 4º C.

Revised 08/29/01 02229 – Rock Removal p. 1 of 2

SECTION 02229

ROCK REMOVAL

A. This section includes removal of identified and discovered rock during excavation, expansive tools, and explosives to assist in rock removal.

A. Solid Rock Removal: Paid by the cubic yard after removal, measured to the nearest 0.1 yd3. Includes preparation of rock for removal, mechanical disintegration of rock, removal from position, loading and removing from site. For payment purposes, solid rock excavation shall be measured by the cubic yard from the top of the rock to a point to allow the minimum bedding and side clearance for the facilities as specified in the appropriate specifications and details. Quantity of rock removal approved will be based on a width 18 inches wider than the outside diameter of the pipe or conduit and a height from rock surface to 6 inches below bottom exterior surface of the pipe or conduit. For over excavation, payment will not be made for over excavated work or for replacement materials. Quantity of rock to be removed must be estimated by Contractor and approved by Project Engineer prior to rock removal.

B. Loose Rock Removal: Paid by the cubic yard after removal, measured to the nearest 0.1 cubic yard. Includes preparation of rock for removal, removal from position, loading and removing from site. For payment purposes, loose rock excavation shall be measured in cubic yards and shall include the total volume of only those rocks or boulders that are individually over one-half cubic yard in volume. Loose rock shall be removed from the excavation in such a way that a clear width of at least six inches exists between the rock and the pipe or appurtenance. Quantity of rock to be removed must be estimated by Contractor and approved by Project Engineer prior to rock removal.

A. Section 02110 – Site Clearing.

B. Section 02200 – Excavating, Trenching and Backfilling.

1.4 DEFINITIONS

Revised 08/29/01 02229 – Rock Removal p. 2 of 2

A. Solid Rock: Rock Solid igneous or metamorphic rock which, in the opinion of the

Project Engineer, cannot be removed practically without the use of specialized pre-splitting methods such as: drilling, wedging, prying, jacking, hydraulic hammering, etc. Soft, disintegrated rock that can be removed with a picking or scarifying action shall not be classified as rock excavation.

B. Loose Rock: Boulders and other detached stones, each with a minimum volume of

½ cubic yard. Excavated boulders or rock fragments with a volume of less than ½ cubic yard shall not be classified as Loose Rock for payment purposes.

A. Verify site conditions and note subsurface irregularities affecting work of this section.

B. Identify required lines, levels, contours and datum.

3.3 ROCK REMOVAL BY A MECHANICAL METHOD

A. When rock is encountered, strip free earth.

B. Excavate and remove rock by the mechanical method.

1. Hydraulic hammering or jacking.

2. Drill holes and use expansive tools, wedges and mechanical disintegration compound to fracture rock.

C. Excavate to 6 inches below invert elevation of pipe and 18 inches wider than the pipe diameter in utility trenches.

D. Remove all rock fragments, boulders, and debris from site and dispose of in an approved waste area.

E. Correct unauthorized rock removal in accordance with compacting and backfilling requirement of Section 02200.

08/29/01 02510 – Asphaltic Concrete Paving p. 1 of 3

SECTION 02510

ASPHALTIC CONCRETE PAVING

A. Asphaltic concrete paving.

B. Aggregate base course.

A. There is no separate payment for work under this section. Merge work required with pay items defined within the Measurement and Payment portion of other Sections of this contract.

A. Section 02200 – Excavating, Trenching, and Backfilling

B. Section 02228 – Utility Road Crossing

A. State of California, Department of Transportation, Standard Specifications, latest edition.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with State of California, Department of Transportation, Standard Specifications, latest edition.

B. Obtain materials from same source throughout.

1.6 REGULATORY REQUIREMENTS

A. Project Engineer will obtain a permit, if required, from the appropriate authority prior to construction. Contractor to comply with the requirements of the permit.

08/29/01 02510 – Asphaltic Concrete Paving p. 2 of 3

1.7 ENVIRONMENTAL REQUIREMENTS

A. Do not place asphalt when ambient air or base surface temperature is less than 40º F, or surface is wet or frozen.

2.1 MATERIALS

A. Asphalt Concrete Pavement: In accordance with State of California, Department of Transportation, Standard Specifications, most recent edition.

B. Aggregate for Base Course: In accordance with State of California, Department of

C. Primer: In accordance with State of California, Department of Transportation, Standard Specifications, most recent edition.

D. Tack Coat: In accordance with State of California, Department of Transportation, A. Verify base conditions under provisions of Section 02200.

B. Verify the compacted subgrade is ready to support paving and imposed loads.

3.2 PLACING AGGREGATE BASE

A. Install Work in accordance with State of California, Department of Transportation, B. Aggregate base will not be required where the trench has been backfilled with cement slurry and the asphaltic concrete will be placed directly on the slurry mixture.

3.3 PREPARATION - PRIMER

A. Apply primer in accordance with State of California, Department of Transportation, 08/29/01 02510 – Asphaltic Concrete Paving p. 3 of 3

3.4 PREPARATION - TACK COAT

A. Apply tack coat in accordance with State of California, Department of

3.5 PLACING ASPHALT PAVEMENT

A. Install Work in accordance with State of California, Department of Transportation, B. Compact pavement by rolling to specified density. Do not displace or extrude pavement from position. Hand compact in areas inaccessible to rolling equipment.

C. Perform rolling with consecutive passes to achieve even and smooth finish without roller marks.

3.6 TOLERANCES

A. Flatness: Maximum variation of ¼ inch measured with a 10-foot straight edge.

3.7 PROTECTION

A. Immediately after placement, protect pavement from mechanical injury until surface temperature is less than 140º F.

Revised 09/28/05 02667 – Water Mains p. 1 of 9

SECTION 02667

WATER MAINS

A. This section includes water pipe, gate valves, hydrants, preparation, bedding, installation, and disinfection.

A. PVC Water Main: Paid by the linear foot, measured to the nearest foot. Includes trench excavation, placement of bedding material (quantity of imported bedding material required, if any, will be paid separately under its own line item), hand trimming, pipe, fittings, thrust blocks, water main warning tape, trace wire, marker posts, hydrostatic testing, disinfection, backfilling, as-builts, site cleanup, bacteriological sampling and testing, and all appurtenances not otherwise specified in the bid schedule. Payment shall be the same for C900, SDR 26, and SDR 21 PVC pipe, based on diameter of pipe.

B. Fire Hydrant Assembly: Paid by the unit, measured to the whole unit. Includes excavation, angle fire hydrant valve, gate valve and box, hydrant wrench, gate valve key, thrust blocks, connection to water main, gravel, concrete, backfilling, protection posts, as-builts, site cleanup, and other appurtenances necessary to make a workable installation. Wet barrel and dry barrel fire hydrants will be paid at the same rate.

C. Flush Hydrant Assembly: Paid by the unit, measured to the whole unit. Includes excavation, angle flush hydrant valve, galvanized pipe, gate valve and box, hydrant wrench, gate valve key, thrust blocks, connection to water main, gravel, concrete, backfilling, protection posts, as-builts, site cleanup, and other appurtenances necessary to make a workable installation.

D. Gate Valve and Box: Paid by the unit, measured to the whole unit. Includes excavation, gate valve, gate valve key, box, thrust blocks, marker posts, backfilling, as-builts, site cleanup, and other appurtenances as necessary.

E. Air Release Combination Valve: Paid by the unit, measured to the whole unit.

Includes excavation, pipe, steel enclosure, air release combination valve, fittings, marker posts, double strap saddle, corporation stop, connection to the water main, backfilling, as-builts, site cleanup, and other appurtenances as necessary.

Revised 09/28/05 02667 – Water Mains p. 2 of 9

F. Connection to Existing Water Main: Paid by the unit, measured to the whole unit.

For the purposes of this contract, a water main is defined as larger than 2 inches in nominal diameter, and Connection of Water Mains is defined as connection of a new water main to an existing water main. Includes excavation, removal and disposal of existing water main and fittings, locating existing valves, draining existing water mains, connection of new water main to existing water main, hot tap (if permitted by Project Engineer), coordinating shut-down with local utility authority, fittings, disinfection, backfilling, as-builts, site cleanup and other appurtenances as necessary.

A. Section 02110 – Site Clearing

B. Section 02200 – Excavating, Trenching and Backfilling

C. Section 02229 – Rock Removal

D. Section 02675 – Disinfection of Water Main System

E. Section 03300 – Cast-in-Place Concrete

A. ASTM D1785 – Poly (VinylChloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120.

B. ASTM D2241 – Poly (VinylChloride) (PVC) Plastic Pipe (SDR-PR).

C. ASTM D2466 – Poly (VinylChloride) (PVC) Plastic Pipe Fittings, Schedule 40.

D. ASTM D2855 – Making Solvent-Cemented Joints with Poly (Vinyl Chloride)

(PVC) Pipe and Fittings.

E. ASTM D2239 – Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Controlled Outside Diameter.

F. ASTM D3139 – Joints for Plastic Pressure Pipes using Flexible Elastomeric

Seals.

G. AWWA C104 – ANSI Standard for Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water.

H. AWWA C105 – ANSI Standard for Polyethylene Encasement for

Revised 09/28/05 02667 – Water Mains p. 3 of 9

Ductile-Iron Pipe Systems.

I. AWWA C111 – ANSI Standard for Rubber-Gasket Joints for Ductile- Iron Pressure Pipe and Fittings.

J. AWWA C151 – ANSI Standard for Ductile-Iron Pipe, Centrifugally

Cast, for Water.

K. AWWA C502 – Dry-Barrel Fire Hydrants.

L. AWWA C503 – Wet-Barrel Fire Hydrants.

M. AWWA C504 – Rubber-Seated Butterfly Valves.

N. AWWA C509 – Resilient-Seated Gate Valves for Water Supply Service.

O. AWWA C515 – Reduced Wall, Resilient-Seated Gate Valves for Water Supply Service.

P. AWWA C900 – Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In. Through 12 In. (100 mm Through 300 mm), for Water Distribution.

Q. AWWA C901 – Polyethylene (PE) Pressure Pipe and Tubing, ½ In. (13 mm) Through 3 In. (76 mm), for Water Service.

1.5 QUALITY ASSURANCE

A. Pipe: Perform Work in accordance with manufacturer's recommended procedures.

B. Valves: Mark manufacturer's name and pressure rating on valve body.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and protect products to site.

B. Deliver and store valves in shipping containers with labeling in place.

2.1 WATER PIPE

A. Manufacturers: Certainteed, Diamond Plastics, Johns Manville, PW Pipe, or equal.

Revised 09/28/05 02667 – Water Mains p. 4 of 9

B. PVC Pipe: AWWA C900, elastomeric-gasket couplings, Class 100, 150, or 200 as shown on the drawings or bid schedule.

1. Fittings: AWWA C111, rubber-gasket joints, Ductile-Iron

2. Joints: ASTM D3139 compression gasket ring.

C. PVC Pipe: ASTM D2241, SDR-21 or 26 as shown on the drawings or bid schedule:

1. Fittings: ASTM D2466, PVC.

2. Joints: ASTM D2855, solvent weld.

2.2 GATE VALVES

A. Manufacturers: American Darling, Mueller, Clow, Waterous, or equal.

B. Meet or exceed either AWWA C509 or C515, resilient seated gate valves 2 inch through 12 inch NPS, ductile iron body, trim, non-rising stem with square nut, single wedge, mechanical joint, flanged, or slip-on ends as specified in drawings, control rod, and extension box.

C. Furnish one valve key per contract or delivery order as applicable.

2.3 GATE VALVE BOX

A. Manufacturer: Tyler Pipe or equal.

B. Cast iron and of the sliding type, sized for use with the appropriate valve. Locking box lid marked "WATER." Box shall extend from the body of the valve to the finished grade.

2.4 FIRE HYDRANT

A. Conform to AWWA C502, dry-barrel or C503 wet-barrel, as specified in drawings.

1. Bury length is to the nearest 6-inches from the bottom of the connecting pipe to the ground line of the hydrant.

2. Use two hose (2½ inch) and one pumper outlet (4 inch) nozzles with threads conforming to National Fire Protection Association (NFPA) 1963 for National Standard Fire Hose Coupling Screw Threads

Revised 09/28/05 02667 – Water Mains p. 5 of 9

3. The size of the hydrant is designated by the nominal diameter of the main valve opening. In no case shall the diameter of the main valve opening be less than 4 inches.

4. Inlet connection is 6 inch flanged or hub connection.

5. The direction of rotation of the operating nut to open the hydrant is left

(counterclockwise).

6. Paint the exterior of the hydrant traffic or safety yellow.

7. The outlet nozzle cap and chain is bronze.

B. Furnish two hydrant wrenches per contract or delivery order as applicable.

C. Furnish two traffic safety flange repair kits including all couplings, flanges, gaskets and connections necessary to replace a broken safety flange.

2.5 FLUSH HYDRANT

A. Manufacturer: James Jones Company, Model J342, J344HP, or equal.

B. Conform to AWWA C503, wet-barrel.

1. Hydrant of bronze material.

2. Inlet connection is 2 inch or 4 inch flanged or hub connection.

3. Use one hose (2 1/2 inch) nozzle with threads conforming to National Fire Protection Association (NFPA) 1963 for National Standard Fire Hose Coupling Screw Threads.

4. Bury length is to the nearest 6 inches from the bottom of the connecting pipe to the ground line of the hydrant.

5. The direction of the rotation of the operating nut to open the hydrant is left (counterclockwise).

6. Paint the exterior of the hydrant traffic or safety yellow.

7. The outlet nozzle cap and chain is bronze.

C. Furnish two hydrant wrenches per job-site.

Revised 09/28/05 02667 – Water Mains p. 6 of 9

D. Galvanized Pipe Schedule 40 ASTM A120, Scotch Rap 50 per drawing.

E. Use teflon compound on all joints.

2.6 AIR RELEASE COMBINATION VALVE ASSEMBLIES

A. Valve Material: Cast iron

B. Valve Type: Float operated, equal to APCO Air Release model 143C, 150 psi, single-body, double orifice, cast iron.

C. Valve Box: Cylindrical steel enclosure. The exterior of steel enclosure shall be field painted yellow with two coats of paint, Rust-oleum 94 or equal.

2.7 ACCESSORIES

A. Thrust Blocks: Refer to Section 03300 (Cast-In-Place Concrete).

B. Marker Post

1. Manufacturers: Carsonite, Greenline

2. Flexible fiberglass, dual-sided.

3. Blue decal label on both sides as specified in drawing.

C. Protection Post

1. Black iron, 3 inch diameter, 6 feet long, buried 3 feet.

2. Cover portion of each post above grade with 2 coats of yellow reflectorized paint or reflective tape for a band 3 inches wide.

D. Warning Tape: 3 inch wide, 0.2 inch total thickness, plastic and imprinted with "Water Line" in large letters.

E. Trace Wire: Insulated #10 AWG Copper Wire.

A. Verify existing water main size and location.

Revised 09/28/05 02667 – Water Mains p. 7 of 9

A. Cut pipe ends square, ream pipe and tube ends to full pipe diameter, and remove burrs.

B. Remove scale and dirt on inside and outside before assembly.

C. Prepare pipe connections to equipment with flanges or unions.

3.3 BEDDING

A. Excavate pipe trench in accordance with Section 02200 (Excavating, Trenching and Backfilling). Hand trim excavation for accurate placement of pipe to elevations indicated.

B. Backfill around sides and to top of pipe with bedding material and tamp in place.

C. Maintain optimum moisture content of bedding material to attain required compaction density.

3.4 INSTALLATION - WATER MAIN

A. Maintain separation distances of water main from sewer pipe as per Title 22 of the California Environmental Health Code.

B. Route pipe in straight line.

C. Install pipe to allow for expansion and contraction without stressing pipe or joints.

D. Install access fittings per Section 02675 (Disinfection of Water Main System).

E. Form and place concrete for thrust restraints at each elbow or direction change of pipe main.

F. Establish elevations of buried piping to ensure not less than 30 inches of cover.

G. Install Metallic Tracer Tape buried continuously at 12 inches below finish grade.

H. Backfill per Section 02200 (Excavating, Trenching and Backfilling).

I. Install marker post at all bends, gate valves, etc as shown on in the detail.

3.5 VALVE INSTALLATION

Revised 09/28/05 02667 – Water Mains p. 8 of 9

A. Set valves on solid bearing.

B. Install thrust blocking and rebar as shown in the drawings.

C. Center and plumb valve box over valve. Set box cover as specified in drawings.

3.6 VALVE BOX INSTALLATION

A. Firmly support, center, and set valve box plumb over the wrench nut of the gate valve.

B. Pour a concrete collar around the top of the valve box and mark clearly to show direction of pipeline and the size (diameter) of the pipe.

3.7 FIRE HYDRANT INSTALLATION

A. Set hydrants plumb. Locate pumper nozzle perpendicular to and facing roadway.

B. Set hydrants to grade with nozzles at least 20 inches above ground.

C. For dry-barrel installation provide a drainage pit 3 feet square by 18 inches deep, filled with drainage rock per Section 02200 (Excavating, Backfilling & Trenching). Encase elbow of hydrant in gravel to 6 inches above drain opening.

Do not connect drain opening to sewer.

D. Provide each hydrant with protection posts as specified in drawings.

E. Paint hydrants in accordance with local code, or as specified in paragraph 2.4.

3.8 FLUSH HYDRANT INSTALLATION

A. Set hydrants on solid bearing.

B. Install hydrants plumb with the pumper nozzle as indicated in the plans. Where grade is established, set the hydrant to an elevation with the nozzles approximately 3 feet above the ground or sidewalk level. Where grades are not established, set the hydrant to the elevation established by the Project Engineer.

C. Provide each hydrant with protection posts as specified in drawings.

3.9 CONNECTION TO EXISTING WATER MAINS

A. Make the necessary arrangements with the owner of the existing utility prior to any connections to any water mains.

Revised 09/28/05 02667 – Water Mains p. 9 of 9

B. Do not start work until all the materials, equipment, and labor have been assembled on the site. When work is started on a connection, proceed continuously without interruption, and as rapidly as possible until completed.

C. If the connection to the existing system involves turning off the water, notify affected customers 24 hours in advance. No shutoff of mains will be permitted overnight, over weekends, or on Federal holidays. Water shut-off is limited to 4 hours maximum.

D. Make connections to existing water mains in a neat, workmanlike manner to suit actual conditions encountered at the existing main. Adhere to manufacturer's recommendation to avoid damage to pipe coating when wet or dry tapping. Leave a smooth end at right angles to the axis of the pipe.

E. Prevent the existing main from being contaminated when making the connection.

Take all action necessary to prevent trench water, mud or other contaminants from entering the connection line or main at any time.

3.10 DISINFECTION OF WATER MAIN

A. Flush, disinfect, and pressure test system per Section 02675 (Disinfection of Water Main System).

3.11 FIELD QUALITY CONTROL

A. Government may perform compaction tests per ASTM D1557 when desired. Cost of testing will be at government expense. If compaction is not in accordance with specifications, rework and retesting will be done at Contractor’s expense.

B. Contractor is responsible for removing, replacing, and retesting all work that does not meet specified requirements. This applies even if a government representative was present during installation.

Revised 8/01 02668 – Water Service Lines p. 1 of 4

SECTION 02668

WATER SERVICE LINES

A. Pipe and fittings for domestic water service lines

A. Water Service Line: Paid by the linear foot, measured to the nearest foot. Includes trench excavation, hand trimming, pipe, fittings, backfilling, disinfection, pressure testing, marker posts as-builts and site cleanup.

B. Water Service Connection: Paid by the unit, measured to the whole unit. Includes excavation, locating water main, connection to water main, saddle, corporation stop, marker post, coordination of system downtime, hot tap, notification to local utility, fittings, and backfilling.

C. Connection to Existing Utilities: Paid by the unit, measured to the whole unit.

Includes excavation, location of existing facilities (e.g. water service line, water meter, etc.), connection to existing individual site water facilities (e.g. water service line, water meter, etc.), fittings, and backfilling.

D. House Connection without Pressure Reducing Valve (PRV): Paid by the unit, measured to the whole unit. Includes excavation, house connection, shutoff valve, box, hose bib, vacuum breaker, fittings, and backfilling.

E. House Connection with Pressure Reducing Valve (PRV): Paid by the unit, measured to the whole unit. Includes excavation, house connection, shutoff valve (gate valve), box, hose bib, vacuum breaker, fittings, pressure reducing valve, and backfilling.

F. Water Meter and Box: Paid by the unit, measured to the whole unit. Includes excavation, meter, meter box, fittings, connection to water service line, coppersetter, gravel, concrete, backfilling, marker post, as-builts, and site cleanup.

G. Curb Stop and…