++REQUEST FOR INFORMATION AND SOURCES SOUGHT
Program Support Center (PSC) Assisted Acquisition Branch is requesting on behalf of the United States Army, Dugway Proving Ground, UT Request for Information.
This is a Small Business Sources Sought notice. This is NOT a solicitation for proposals, proposal abstracts, or quotations. The purpose of this notice is to obtain information regarding: (1) the availability and capability of qualified small business sources; (2) whether they are small businesses;
HUBZone small businesses; service-disabled, veteran-owned small businesses; 8(a) small businesses;
veteran-owned small businesses; woman-owned small businesses; or small disadvantaged businesses;
and (3) their size classification relative to the North American Industry Classification System (NAICS) code for the proposed acquisition. Your response to the information requested will assist the Government in determining the appropriate acquisition method, including whether a set-aside is possible. An organization that is not considered a small business under the applicable NAICS code should not submit a response to this notice.
Interested SMALL BUSINESSES only should submit their capability statements (no more than 10 pages in length) to Patricia Natividad, Contract Specialist, by email at Patrica.Natividad@psc.hhs.gov no later than 2pm MST on April 17, 2017. Generic capability statements will be considered non-responsive. Capability statements must be tailored to this request and identify the source’s capabilities to complete this requirement including information on key staff experience and education, and a description of corporate experience with similar projects.
1.0 Description
The Program Support Center Assisted Acquisition Branch is seeking qualified contractors to provide the following:
The purpose of this effort is to layout and install an upgraded digital air supply/return, hood exhaust, and snorkel valve/damper systems for selected rooms within B4156 Combined Chemical Test Facility (CCTF) and connect the digital controls for these devices to an existing micro-processor plug-in unit to the Building Management System.
1.1 Scope
The Contractor for this contract is performing basic equipment layout, fabrication, and installation with minor construction/remodel services to the Building 4156 upgraded digital supply/return, hood exhaust, and snorkel for selected rooms within B4156 Combined Chemical Test Facility (CCTF) and connecting the digital controls for these devices to an existing micro-processor plug-in unit to the Building Management System.
• The use professional standards and practices to layout and install new digital Variable Air Volume valves (VAVs), ductwork, and bubble tight dampers for selected supply/return lines, hoods, and snorkels (Appendix A1 - Layout)
• Reconfigure existing circuits to supply electrical power to the new digital VAVs.
• Connecting digital controls signals to the BMS that allows controls and balancing operations of the valves and dampers for the new digital equipment and remaining old pneumatic equipment.
• Demonstrating control of the new equipment in concert with all existing equipment response time and functionality as defined within the Contractor’s developed Acceptance Test Plan.
1.2 BACKGROUND
Dugway Proving Ground (DPG) has identified new ways to use processing operations for the testing of Chemical Warfare Agents (CWA). Testing of CWA, in a controlled and progressively reactive environment requires near real-time air balancing for the entire complex. This effort is part of a three part acquisition to upgrade the air supply/exhaust system (this effort); renovate the Mechanical Air Handling Units (AHUs); and upgrade the system chiller units.
2.0 Assumptions
The RFI uses the following assumptions:
No assumptions at this time.
3.0 Requested Information
Answers to the following questions will help us inform the solicitation.
Extraction from the Performance Work Statement:
Please review the following Performance Work Statement and Drawing. The capabilities statement shall include experience with such projects, specializing in government type of laboratory fume hoods.
Experienced key personnel with background in the following field within the past 5 years. Notable Contract information and what government entity the current contract is with, performance information.
3.0 CONTRACTOR TASKING / REQUIREMENTS
All products developed under this contract shall be considered Government work and shall have no license encumbrances. All data shall be developed and provided in accordance with the data right clauses in the basic contract and as identified in this task order. Unless the Contractor has expressed a claim to providing data to the Government with less than unlimited data rights, the Government will assume unlimited data rights (see DFARS clause 252.227-7013 of this task order for definition of data rights). The Contractor shall provide engineering/technical services for the efforts described within Section 3.1 below.
3.1 CONTRACTOR REQUIREMENTS
The Contractor shall: 1. layout COTS valve/damper/ transition ductwork/sensors for supply/return, hoods, and snorkels (dampers only) along with line connections with existing JACE interface to the Micro-Processor Control plug-in unit; 2. Install valve/damper/sensors/transition ductwork, make electrical/electronic connections, connect data lines to designated JACE, and connect JACE to digital Microprocessor unit (insert software codes to allow BMS display and control of supply/exhaust systems); 3. Conduct Acceptance testing; and 4. Document As-installed drawing changes and Final Installation Test Report.
3.1.1 Program Status Reviews/Technical Interchange Meetings
The Contractor shall prepare the first month status report (due 35 DAC) that contains the program baseline, schedule and critical milestones, draft HSP, proposed quality assurance ordering/receiving milestones, and cost/labor hour tracking summary table.
The Contractor shall attend regularly scheduled program status reviews, as approved by the Government Program Manager. The purpose of these meetings shall be to brief the progress of each assigned task, and to solicit input and concurrence of work performed. The Contractor shall generate presentation materials as required to aid in the discussion of technical issues and shall support Technical Interchange Meetings/Reviews. The Contractor shall summarize the date/duration, technical issues, and actions as part of the next monthly status report.
CDRL Data Item No. A039; DI-MGMT-80227; Contractor Progress, Status, and Management Report
3.1.2 Layout COTS valve/damper/ transition ductwork/sensors for supply/return, hoods, and snorkels along with line connections with existing JACE interface to the Micro-Processor Control plug-in unit;
The Contractor shall investigate the layout of the existing exhaust system and components. Create schematics for new digital valve /bubble damper layout for hoods, Supply/return ducts, and snorkels; including subcomponet notes and interfaces required..
3.1.2.1 Mechanical equipment: Conduct an assessment of the existing hoods, supply/return lines, and snorkels and their connection to the existing system. Provide schematics and drawings of replacement ducts, new digital valves and dampers necessary (Appendix A2-A9).
3.1.2.2 Electrical Equipment; Conduct an assessment of the power supporting the existing equipment. Provide line diagrams for re-configuring power with transformers to the new digital components. (Appendix A1E to 8E)
3.1.2.3 Electronic Equipment; Conduct an assessment of the sensor and data signals used in the exisiting systems. Provide line diagrams for re-configuring equipment and data transmissions to existing JACEs and BMS. Identify coding requirment to the microprocessor so that the new compoents can be reconized and displayed by the
BMS. Also provide line diagrams denoting the digital room components and the desinated JACE interfaces (Appendix A-10)
3.1.2.4 Testing; Create a Acceptance Test Plan that denotes manufacturer’s recommended installation functional tests, integrated component to the BMS tests, and final ASHRAE 110 Hood certifications (smoke/video, face velocity, and 2pt Hood sash opening (marked max up and mid point) and 3 pt interior collection (1 ft from each side and center). Data collection will be by Government provided mini-cam/operators and reference gases.
CDRL Data Item No. A017; DI-GDRQ-80650; DESIGN DATA AND CALCULATIONS; formatted by the Contractor and contain layout data and/or calculations used in the positioning of equipment/components.
CDRL Data Item No. A026; DI-IPSC-81435A; SOFTWARE DESIGN DESCRIPTION (SDD); formatted by the Contractor and contain manufactures product details used in the coding of the Microprocessor and sensor control unit..
CDRL Data Item No. A079; DI-TMSS-80527C COMMERCIAL OFF-THE-
SHELF (COTS) MANUAL AND ASSOCIATED SUPPLEMENTAL DATA;
formatted by the Contractor and contain manufactures product operating instructions as-installed.
Data Item No. A080; DI-SESS-81000D; Product Drawing/Models and Associated Lists; formatted by the Contractor and showing interfaces, dimensions, and connection drawings.
CDRL Data Item No. A032; DI-IPSC-81433A; SOFTWARE USER MANUAL (SUM); formatted by the Contractor and contain assembled product operating instructions as-installed.
CDRL Data Item No. A059; DI-QCIC-80553A; ACCEPTANCE TEST PLAN;
formatted by the Contractor and documenting the component functional tests, hardware responses and emergency fail-safe modes.
3.1.3 The contractor shall fabricate fully seal-welded stainless steel ductwork that interfaces with
Appendix A 1-10 valves, dampers, controllers, sensors and associated components meeting the specifications listed. Install Valve/damper/sensors/transition ductwork/by-pass assembly, make electrical/ electronic connections, connect data lines to designated JACE, and code JACE deliver data and control signals to the digital Microprocessor unit;
3.1.3.1 Mechanical equipment; remove existing pneumatic valves and dampers for each designated room hood, supply/return lines, and snorkels. Install the digital valves/dampers and ductwork/by-pass assembly per the layout defined in Section 3.1.2
3.1.3.2 Electrical Equipment; discconect existing power and data connections. Route and connect new digital equipment/components per layout defined in Section 3.1.2
3.1.3.3 Electrontonic Equipment; disconnect exisiting sensor and data collectors. Install new digital equipment/components per layout defined in Section 3.1.2
CDRL Data Item No. A059; DI-QCIC-80553A; ACCEPTANCE TEST PLAN;
formatted by the Contractor and documenting the component functional tests, signal responses, data transmission and display, and emergency fail-safe modes.
3.1.4 Conduct Acceptance testing and hood certification;
1. Use approved ATP for functional connections and signal transmission of all hardware.
2. Use approved ATP to verify all software/firmware and all BMS displays are functioning.
3. Use approved ATP to verify response times, communications, and entire HVAC Exhaust system performance.
4. Document and report results; add red-line approved changes to drawings.
The Contractor shall conduct an ASHRAE 110-1995 Hood-Glovebox System Test and Certify at their facility. Test shall include:
A. Smoke/Video tests B. Verify Face Velocity
C. Containment with 3 sash opening and 2 pt monitoring
5. Functional and Acceptance testing at DPG (CDRL A05):
A. Demonstrate Access to all areas of Hood perform sequence of operations under sustained negative pressure, sustained operations at up to 100 LFM air flow, and filter change-out. Prior to the demonstration testing, all doors, outlets, dampers, and interlocks shall operate successfully.
B. Hood demonstration; all sash and doors operate, sustained air flow at 100 +/- 10
LFPM,
C. Provide technical support and perform minor changes/adjustments during independent contractor’s ASHRAE-110 as-installed testing to achieve certification.
D. Report performance values and test results to the Government.
CDRL Data Item No. A058; DI-QCIC-80512; INSTALLATION TEST REPORT; formatted by the Contractor and describing installation issues, configuration changes, and Acceptance Test data w/ tables matching requirement against functional test results.
3.1.5 Document As-installed drawing changes and Final Installation Test Report.
CDRL Data Item No. A012; DI-DRPR-81242; INSTALLATION CONTROL DRAWINGS;
formatted by the Contractor and showing interfaces, dimensions, and connection drawings for the as-installed final accepted configuration.
3.1.6 Information Assurance Training and Workforce Management. IA/IT training and/or certification is not required under this contract.
3.1.6.1 OPSEC Standing Operating Procedure/Plan: An OPSEC SOP/Plan is not required in the performance of this contract.
3.1.7 Contractor Full-Time Equivalent Reporting Addendum. The Contractor shall, IAW DESP3 basic IDIQ PWS section 3.7, report contractor labor hours in the http://www.ecmra.mil system.
Contractors have the inherent responsibility to track personnel on contract and labor hours are already being tracked under CDRL A002 of the DESP3 basic IDIQ contracts; therefore, the Government does not expect additional costs associated with this reporting requirement.
3.1.8 Basic or Applied Research. This requirement includes basic or applied research that will result in new digital controlled exhaust capability that operates with the existing pneumatic analog controlled systems.
3.1.9 Professional Certifications and/or Licenses Required for Contractor Personnel
Contractor personnel are not required to possess Professional Certifications and/or Licenses in support of this task. Changes to the installation configuration shall be included in CDRL A012;
DI-DRPR-81242; INSTALLATION CONTROL DRAWINGS
3.2 ORDERING PERIODS
3.2.1 Options Sequence 1 thru 8 ordering period for year 2, year 3 and year 4
3.2.2 Option To Extend Services up to Six (6) Months IAW FAR 52.217-8
4.0 PLACE / PERIOD OF PERFORMANCE & DELIVERY SHIP TO / SCHEDULE
4.1 Place of Performance: Work shall be performed at the contractor’s facility for the design phase and prototype fabrication. Work shall be performed at Dugway Proving Ground Building 4156 Rm 53/55 to install the valves, digital control unit, and demonstrate performance.
Note: Reference Section 6.0, Travel Requirements, of this CET regarding when Contractor personnel may be required to travel on an “as needed basis” to other Government location(s) to support the objectives of this CET.
4.2 DELIVERY SHIP TO
Deliverables shall be shipped to the following locations:
http://www.ecmra.mil/
4.2.1 Contract Data Requirements List (CDRLs): IAW DD1423s of the task order (reference
Section J, List of Attachments, of the task order).
4.2.3 Limited Production Runs: NA
4.3 PERIOD OF PERFORMANCE
The overall period of performance for this task shall be IAW Section B, The Schedule, of the task order (i.e. established and identified under the individual CLINs of the order).
4.3.1 Contract Holidays
When work is to be performed at a Government location, the prices/costs in Section B, The Schedule, shall include holiday observations; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. Holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday. The following days are contract holidays.
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
4.3.2 Days and Hours of Operation
Accomplishment of the results contained in this PWS requires work at Dugway Proving Ground and at various Contractor, Subcontractor, and Government facilities (mainly in the continental United States). Normal workdays are Monday through Thursday except US Federal Holidays. Workers typically work ten (10) hours per day, 40 hours per week. Flextime workers start not earlier than 0600 and not later than 0900. Core hours of work are from 0700 to 1700 daily.
All employees are expected to be available during core hours.
4.3.3 Government Provided Service Plan
When work is to be performed at the Government’s location, the Government will prioritize service requirements based on operating requirements. The Government will provide the Contractor’s Technical Lead a generalized projected service plan that may be reviewed or revised by the Government Program Manger as necessary. The purpose of the plan is to prioritize Government service requirements and provide the contractor with the information required to effectively manage their personnel.
The Contractor shall provide total task management and supervise contractor personnel. The Government’s relationship in this non-personal services contract is with the Contractor and not with individuals employed by the Contractor. At all times, it must be clear that the Contractor, not the Government, manages its employees. The Contractor’s Technical Lead shall serve as the primary point of contact for all technical aspects of the required work. This person shall also be a prime provider of the required technical services. No personal services shall be performed.
When work is to be performed at the Government’s location and for meetings with Government personnel, Contractor employees shall identify/represent themselves as contractor personnel by introducing themselves and/or being introduced as contractor personnel, displaying distinguishing badges or other visible identification, and appropriately identify themselves as contractor employees in telephone, conversations and formal/informal written correspondence.
AFI63-138, Chapter 6, Section 6.4, Initial Contract Performance Review, states “The initial evaluation of contractor performance is a joint determination by the MFT that the contractor has successfully started performance, completed transition, is fully operational, and is within the estimated cost, schedule, and performance parameters of the contract. The initial performance review criteria shall be included in the QASP or similar documentation. The SDO may waive the initial evaluation for contractors that have continued performance under a successor contract award (prior incumbent), or for contractors that have otherwise demonstrated full compliance with contract start-up. Separate initial contract performance reviews are not required when they would duplicate existing reviews.”
AFI63-138, Chapter 6, Section 6.4.1, Scheduling, states “The review shall take place within 30 days after the contractor assumes full performance responsibility (i.e. after completion of transition/mobilization).”
In order to help the contractor start performance, complete transition/mobilization and become fully operational when work is to be performed at the Government location, the following initial performance review criteria is provided below.
These criteria shall be used for the “Initial Contract Performance Review” that shall take place 30 days after receipt of task order (DAROTO) (i.e. contract award) and shall also be considered as the initial generalized projected service plan. This list shall not be considered to be all inclusive and may be reviewed or revised by the Government Program Manger as necessary after award.
Initial Performance Review Criteria / Government Provided Service Plan
DAROTO
(Business Days) Performance / Objective Element
Contractor shall provide a notice of who their designated “Technical Lead” is for this contract to the Program Manager, Contracting Officer and Contracting Officer Representative (COR). The Technical Lead shall serve as the primary point of contact for all technical aspects of the required work. This person shall also be a prime provider of the required technical services.
Contractor personnel shall provide a completed copy of the Nondisclosure Agreement to the Government Program Manager, Contracting Officer Representative (COR) and Contracting Officer prior to performing work that involves Confidential, Proprietary and/or Sensitive Information held by the USA relating to the tasks to be performed under this Task Order.
(Ref. Section 5.1.3)
Contractor personnel shall coordinate receipt/assignment of Base Support - Government Provided Office Space with the Program Manager and Contracting Officer Representative. (Ref. Section 5.3)
Contractor’s Technical Lead shall notify the Program Manager and Contracting Officer Representative (COR) when the Contractor has obtained the Government documents referenced in Section 2.1.
10 Contractor personnel in place at their facilities and ready to begin performance of Section 3.2.1 task.
Contractor shall provide a listing of personnel who require Base or Area Badges and Access to Facilities to the Program Manager, Contracting Officer and Contracting Officer Representative (COR). (Ref. Section 5.1.6)
4.4 DELIVERY SCHEDULE FOR CDRLS
Documentation deliverables shall be delivered in accordance with this CET and the Form DD1423s attached to the task order (reference Section J, List of Attachments, of the task order), unless otherwise specified by the Government Program Manager and Contracting Officer through a contract modification or PCO letter. If there is a discrepancy in due dates between the CET and the DD1423s, this CET shall take precedence. Due dates falling on non-working days (Saturdays, Sundays, and recognized national (legal) holidays) shall be construed to mean the next regular working day. All due dates (i.e. 30 DAC) are calendar counted unless designated otherwise.
CET
Para. # Description CDRL
Data Item No. Frequency
Date of First
Submissi on
Date of Subsequent Submission
3.1.1 Monthly Report:
Develop Program task and schedule and track/report monthly. Email staff list for DPG entry 10 days before access is needed.
Contractor format acceptable.
A039 Monthly 35
DAC
Monthly
3.1.2
Layout of exhaust system:
Reviews 60% & 90% on mechanical, electrical, and electronic interfaces and the functional performance demonstration specifications.
Autocad drawings of mechanical, electrical, and electronic equipment layout and JACE interface designation.
A017, A023, A026, A032, A079, A080, & A059
1TIME 120
DAC
150 DAC
6.4 Mobilization:
Develop plan for employee procedures for working in potential Chemical Hazard Environment while at Bldg. 4156
A085 1TIME 90 DAC 150 DAC
3.1.4 Conduct functional
demonstrations:
Provide as-installed redlined of mechanical, electrical, and electronic equipment layout and connection into the BMS.
Report on as-installed items for mechanical, electrical, and electronic changes and functional performance demonstration results.
A058 1TIME 210
DAC
Contractor designated
3.1.5 As-Installed changes A012 1TIME 240
DAC
Contractor designated
4.5 GOVERNMENT INSPECTION AND ACCEPTANCE OF DELIVERABLES
Documentation deliverables shall be delivered in accordance with this contract, unless otherwise specified by the Government Program Manager and Contracting Officer through a contract modification or PCO letter. The Government has the inherent right to disapprove any data item.
Therefore, the Government Program Manager will have the right to reject or require correction of any deficiencies found in deliverables. In the event of rejection of any deliverable, the Government Program Manager, with coordination with the Contracting Officer, will notify the Contractor in writing of the specific reasons why the deliverable was rejected. The Contractor shall have 30 calendar days, or as outlined in the table in section 7.0 (whichever is shorter) or unless designated otherwise through a PCO letter, to correct the rejected deliverable and resubmit to the Government Program Manager for re-inspection. The Government must approve final versions of data deliverables.
5.0 SPECIAL CONSIDERATIONS
5.1 SECURITY
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
5.1.1 Safeguarding Covered Defense Information and Cyber Incident Reporting The following DFARS clauses are applicable to this effort. Contractor shall control information IAW these clauses, other sections of this CET and terms and conditions of the DESP3 basic IDIQ contract and this task order.
• 252.204-7008 Compliance with Safeguarding Covered Defense Information
Controls
• 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
• 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting
5.1.2. Release or Removal of Information
Contractor personnel shall not release or remove system documentation, data, or reports generated by or through use of government systems. All requests for information shall be forwarded to the Government Program Manager.
5.1.2.1 PUBLIC RELEASE: No test data, reports or documents shall be released to other organizations unless authorized in writing by the Contracting Officer, assigned COR through the designated ATEC/AEC Directorate, and the ATEC OPSEC Coordinator. Any information (classified or unclassified) pertaining to this contract shall not be released for public dissemination.
Proposed public releases shall be submitted for Government approval prior to public release. All request for information shall be directed to TSD/TSE, Dugway Proving Ground, Dugway UT 84022.
5.1.2.2 Visitor Group Security Agreement:
Access to classified information is not expected during the performance of this Contract. However, the Contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements; security education; personnel security clearances; reports;
security checks; security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.
5.1.3 Access to Confidential, Proprietary and/or Sensitive Information Contractor personnel may be required to access Confidential, Proprietary and/or Sensitive Information held by the Government relating to the tasks to be performed under this Task Order. This information may belong to other contractors, other third parties, or the Government. Contractor personnel shall provide a completed copy of the Nondisclosure Agreement provided below to the Government Program Manager, Contracting Officer Representative (COR) and Contracting Officer prior to performing work that involves Confidential, Proprietary and/or Sensitive Information held by the Government relating to the tasks to be performed under this contract.
It should be noted that Confidential, Proprietary and/or Sensitive Information shall not include information that the Contractor personnel or the Contractor can demonstrate:
(A) was known by the Contractor personnel or the Contractor without restriction as to further disclosure when received or was developed independently by the Contractor by individuals who had no direct or indirect access to such information,
(B) was obtained from a source other than the Government, its employees, agents, or contractors through no breach of confidence, What acquisition vehicles can your company be accessed from?
5.0 Responses
5.1 In their response to this notice, contractors should clearly convey their experience and respond to the questions in section 4 (above). Each response should include the following business information:
a. DUNS.
b. Company Name.
c. Company Address.
d. Current government contracting vehicles appropriate to this RFI (for example, GSA
Schedules (which ones?), NITAAC, Government IDIQs the contractor participates in, task order contracts appropriate to the work described, etc.).
e. Do you have a Government approved accounting system? If so, please identify the agency that approved the system.
f. Business type (small business, small disadvantaged business, 8(a)-certified small disadvantaged business, HUBZone small business, woman-owned small business, very small business, veteran-owned small business, service-disabled veteran-owned small business) as validated via the Central Contractor Registration (CCR). All offerors must register on the CCR located at http://www.ccr.gov/index.asp
g. Company Point of Contact, Phone and Email address
Teaming Arrangements: All teaming arrangements should also include the above-cited information and certifications for each entity on the proposed team. Teaming arrangements are encouraged.
Responses must be submitted not later than April 24, 2017. Capability statements will not be returned and will not be accepted after the due date. The maximum number of pages for submission is_10_pages.
6.0 Industry Discussions
Dugway Proving Ground representatives may or may not choose to meet with potential offerors. Such discussions would only be intended to get further clarification of potential capability to meet the requirements, especially any development and certification risks.
7.0 Questions
Questions regarding this announcement shall be submitted in writing by e-mail to the Contracting Officer, Patricia.Natividad@psc.hhs.gov Verbal questions will NOT be accepted.
Disclaimer and Important Notes: This notice does not obligate the Government to award a contract or otherwise pay for information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization’s qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation.
Hood Air Supply/Exhaust Systems Upgrades Appendixes Appendix A -1 Hood Air Supply/return systems Location
Hood configuration and sequence
Seq Rm Hood/valves Snorkels Supply Return Exhaust #
1 34 2 hood/4 valves 0 1 1 5/XX
36 2 hood/4 valves 0 1 1 5/XX
35 2 hood/4 valves 0 1 1 6/XX
45 2 hood/4 valves 0 1 1 6/XX
2 8 2 hood/4 valves 2 3 3 2/0X
57 2 hood/4 valves 2 4 4 2/XX
58 1 hood/2 valves 1 3 2 11/XX
59 1 hood/2 valves 1 4 2 11/0X
3 37 4 hood/8 valves 0 2 2 7/XX
62 4 hood/8 valves 0 2 2 8/XX
4 63 2 hood/4 valves 0 1 1 10/XX
69 6 hood/12 valves 0 2 2 13/XX
5 2 1 hood/2 valves 4 2 2 3/4X
5 1 hood/2 valves 2 2 2 3/0X
53 1 hood/2 valves 0 2 2 3/XX
55 1 hood/2 valves 0 2 2 3/0X
Seq Rm Hood/valves Snorkels Supply Return Exhaust #
6 68 1 hood/2 valves 20 4 4 9/0X
71 1 hood/2 valves 20 4 4 9/0X
72 4 hoods/2 valves
74 1 hood/2 valves 20 4 4 9/0X
7 27 1 hood/2 valves 1 2 2 4/4X
30 1 hood/2 valves 2 2 2 4/0X
60 1 hood/2 valves 1 2 2 4/0X
61 1 hood/2 valves 2 2 2 4/4X
8 73 0 0 3 3 17/0X
13 2 hood/4 valves 0 1 1 1/XX
16 2 hood/4 valves 0 1 1 1/XX
46 3 hood/6 valves 0 2 2 12/XX
Appendix A-2 Sequence 1: 34, 36 35, 45 Rm 34 & 36
Rm 35 &45
Appendix A-3 Sequence 2: 8, 57, 58, 59 Rm 8 & 57
Rm 58 & 59
Appendix A-4 Sequence 3: 37, 62 Rm 37, Rm 62
Appendix A-5 Sequence 4: 63, 69 Rm 63
Rm 69
2-12”dia. valves /hood
Appendix A-6 Sequence 5: 2, 5, 53, 55 Rm 2, 55
Rm 5, 53
Appendix A-7 Sequence 6: 68, 71, 72, 74
Rm 68, & 74
Rm 71
Rm 72
Appendix A-8 SEQUENCE 7; 27, 30, 60, 61, Rm 27
3-12”dia. valves /hood
Rm 30 & 61
Rm 60
Appendix A-9 Sequence 8; 73, 13, 16, 46
Rm 73
Rm 13 & 16
Rm 46
Sequence A-1E; Rms. 34, 36 35, 45
Sequence A-2E; Rms. 8, & 57, & 58, 59
Sequence A-3E; Rms. 8, 37 & 62
Sequence A-4E; Rms. 63 & 69
Sequence A-5E; Rms. 2, 5, 53, 55
Sequence A-6E; Rms. 68, 71, 74 & 72
Sequence A-7E; Rms. 27, 30, 60, 61, Sequence A-8E; Rms. 13, 16 & 46 &73
Appendix A-10 Hood Sensor, JACE, Damper, and Valve
Sensor
Damper
Controller
Valve
Appendix B; iWATCH Briefing iWATCH Army Training for Contractors “See Something -- Say Something”
Unclassified
Always Ready. Always Alert.
Because someone is depending on you.
Unclassified date
Appendix C
5.5.1 General Safety Requirements
While performing work under this contract the contractor shall comply with all applicable federal, state, local and the specific Dugway Army regulations regarding occupational safety and health addressed in the PWS/SOW. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract. The contractor shall notify the (CO) within eight (8) hours of any injury to contract personnel which occur while on a government installation.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
While on a government installation the contractor will be required to follow applicable installation traffic safety regulations and any applicable safety requirements required by the work center supervisor as it pertains to execution of the contract while on DPG.
5.5.2 The contractor shall cooperate with any and all government mishap investigations.
Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA COR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
A. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
B. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.
5.5.3 If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Program Manager
A. The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include AFI 91-203, Air Force Consolidated Occupational Safety Instruction, AFI 91-204, Safety investigations Reports, AFPAM 91-210, Contract Safety, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.
5.5.4 The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken.
5.5.5 Hazard Assessment. In accordance with 1910.132(d)(2), the contractor shall conduct a certified Hazard Assessment on all work areas and include in the Section . A follow-on survey shall be conducted by the contractor when the workload or environment conditions change. If respirators are necessary to protect the health of the employee or whenever respirators are required by the contractor, the contractor employer shall establish and implement a written respiratory protection program according to 29CFR 1910.134.
5.5.6 Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
5.5.7 The contractor’s prepared HSP shall:
- Demonstrate a management commitment to employee safety and health
- Identify applicable rules and regulations http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0
- Identify the roles and responsibilities of Management, Supervisors, Employees and Safety
Coordinator
- Identify work to be performed and location of expected operations
- Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel
- Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
- Identify employee safety and health training requirements and the documentation process
- Include emergency response plans and procedures that relate to protection of government personnel and property
- Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards
- Identify procedures for accident reporting and investigation
- Identify the process for tracking controlled hazards in contractors work area
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
5.5.8 All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
5.5.9 Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99;
5.5.10 Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
The authorized Government Representative (WDTC TSD/TSE) shall approve the contractor’s procedures within the Health and Safety Plan as meeting the intent of the below referenced standards, with the exception of Mishap Notification / Reporting Procedures, which are outlined in Section 5.16.1 of this Appendix C.
Element/Requirement Referenced Benchmark
Mishap Notification/Reporting Appendix C, Section 5.16.1
Facility Fire Protection NFPA 13, 70, & 72
NFPA 409/410
AFI 91-203 Chapters 6, 22
Handling, Storage and use of Flammable/ NFPA 30, 33
Combustible Liquids
Storage and Materials Handling DoDI 4140.62, DoDI 41
5.5.11 Contractor and associated sub-Contractors shall provide a safe and healthful work environment for their employees as prescribed in FAR 52.236-14, 29 CFR Part 1910, pertinent provisions of AR 385-10, and local regulations, policies, and SOPS. They shall safeguard public and government personnel, property, and equipment, and avoid interruption of Government Operations. The Contractor will report accidents or losses to the Contracting Officer as specified in relevant regulations and standards. Whenever the Contractor becomes aware of serious or imminent danger to Government, civilian or Contractor personnel, the Contractor shall take immediate corrective action.
5.5.12 Contractor shall notify the PM, if it becomes necessary to conduct welding or cutting operations during removal or installation tasks. The PM will obtain the necessary Hot Work permits from DPG Fire Department. Hot Work permits will require 48 hour advanced notification. The Contractor shall have the appropriate fire prevention equipment and trained personnel in place prior to the start of permitted “Hot Work”.
5.5.A. Standard Air Intakes: Air intakes to heating, ventilating, and air conditioning (HVAC) systems that are designed to move air throughout a building that are at ground level provide an opportunity for aggressors to easily place contaminants where they could be drawn into buildings. The following measures will be applied to minimize those opportunities. The requirements of this standard do not have to be applied when air intakes are located within an enclosed mechanical equipment yard or similar area with access control such as an enclosed courtyard. Controlled perimeters will not be considered to meet the requirement of access control for the purpose of this standard.
5.5.A.1 Existing Buildings: Add means such as exterior chimneys to extend the elevations of air intakes to at least 10 feet (3 meters) above the ground for all buildings that must comply with these standards.
5.5.A.2 HVAC Replacements and Upgrades. Where air handling equipment in heating, ventilating, and air conditioning systems is being replaced or when they are being upgraded, ensure that air intakes are either 10 feet (3 meters) above the ground or that means such as chimneys are added to extend the intakes to that height.
5.5.B Interior Walls and Doors in Equipment Rooms: Where air intakes that are designed to cool equipment may allow blast pressures to infiltrate equipment rooms, design equipment room interior walls and doors to the same standards for blast resistance as the exterior walls and doors of buildings based on the standoff distance provided and allowing for blast pressure reductions where they can be validated.
5.5.C Standard Emergency Air Distribution Shutoff: For all new and existing buildings required to comply with these standards, provide an emergency shutoff switch in the HVAC control system that can immediately shut down the air distribution and exhaust systems throughout the building and close all dampers leading to the outside except where interior pressure and airflow control would more efficiently prevent the spread of airborne contaminants and/or ensure the safety of egress pathways. Systems without duct connections to the outside (intake, exhaust or pressure relief) are exempt from that requirement. The switch must be capable of shutting down all required systems and closing all required dampers, even if the local hand/off/auto switch is in the hand position, within 30 seconds of switch activation . Locate the shutoff switch (or switches) to be easily accessible by building occupants by locating them similarly to mass notification system (MNS) local operating consoles (LOC) (see UFC 4-021-01 for additional information on MNS LOCS) so that the travel distance to the nearest shutoff switch will not be in excess of 200 feet (61 meters). Ensure that the shutoff switches are well labeled, and of a different color than fire alarm pull stations.
5.5.C.1 Outside Air Intakes, Relief Air, and Exhausts: Provide all outside air intakes, relief air, and exhaust openings with low leakage dampers that are automatically closed when the emergency air distribution shutoff switch is activated. The low leakage dampers will have maximum leakage rates of 3 cfm/square foot (15 liters/second/square meter) with a differential pressure of one inch of water gage (250 Pa) across the damper. If shutting down an exhaust system will violate building or fire codes or create an unsafe condition, then the exhaust system may continue to operate.
5.5.C.2 Critical Areas: Local air handing units serving critical areas where cooling and/or heating must be maintained to prevent mission failure, loss of data or unsafe conditions can continue to recirculate air, but outside air, relief air and exhaust must be closed with low leakage isolation dampers.
5.5.C.3 Fan Coil Unit Heaters and Air Conditioners: Fan coil unit heaters and air conditioners do not require low leakage dampers, but for all new buildings required to comply with these standards, they must have a system that allows all of them to be shut off in an emergency.
| RFI FOR DUGWAY |
| ++REQUEST FOR INFORMATION AND SOURCES SOUGHT |
| 1.0 Description |
| 1.1 Scope |
| 1.2 Background |
| 2.0 Assumptions |
| 3.0 Requested Information |
| 3.0 CONTRACTOR TASKING / REQUIREMENTS |
| 3.1 Contractor Requirements |
| 3.1.2 Layout COTS valve/damper/ transition ductwork/sensors for supply/return, hoods, and snorkels along with line connections with existing JACE interface to the Micro-Processor Control plug-in unit; |
| The Contractor shall investigate the layout of the existing exhaust system and components. Create schematics for new digital valve /bubble damper layout for hoods, Supply/return ducts, and snorkels; including subcomponet notes and interfaces required.. |
| 3.1.3 The contractor shall fabricate fully seal-welded stainless steel ductwork that interfaces with Appendix A 1-10 valves, dampers, controllers, sensors and associated components meeting the specifications listed. Install Valve/damper/sensors/tran... |
| 3.1.6 Information Assurance Training and Workforce Management. IA/IT training and/or certification is not required under this contract. |
| 3.1.7 Contractor Full-Time Equivalent Reporting Addendum. The Contractor shall, IAW DESP3 basic IDIQ PWS section 3.7, report contractor labor hours in the http://www.ecmra.mil system. Contractors have the inherent responsibility to track personnel o... |
| 3.1.8 Basic or Applied Research. This requirement includes basic or applied research that will result in new digital controlled exhaust capability that operates with the existing pneumatic analog controlled systems. |
| 3.1.9 Professional Certifications and/or Licenses Required for Contractor Personnel |
| 3.2 Ordering Periods |
| 3.2.1 Options Sequence 1 thru 8 ordering period for year 2, year 3 and year 4 |
| 3.2.2 Option To Extend Services up to Six (6) Months IAW FAR 52.217-8 |
| 4.0 PLACE / PERIOD OF PERFORMANCE & DELIVERY SHIP TO / SCHEDULE |
| 4.2 Delivery Ship To |
| 4.2.1 Contract Data Requirements List (CDRLs): IAW DD1423s of the task order (reference Section J, List of Attachments, of the task order). |
| 4.2.3 Limited Production Runs: NA |
| 4.3 Period of Performance |
| 4.3.1 Contract Holidays |
| 4.3.2 Days and Hours of Operation |
| 4.3.3 Government Provided Service Plan |
| 4.4 Delivery Schedule for CDRLs |
| 4.5 Government Inspection and Acceptance of Deliverables |
| 5.0 SPECIAL CONSIDERATIONS |
| 5.1 Security |
| 5.1.1 Safeguarding Covered Defense Information and Cyber Incident Reporting |
| The following DFARS clauses are applicable to this effort. Contractor shall control information IAW these clauses, other sections of this CET and terms and conditions of the DESP3 basic IDIQ contract and this task order. |
| 252.204-7008 Compliance with Safeguarding Covered Defense Information Controls |
| 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| 5.1.2. Release or Removal of Information |
| 5.1.2.2 Visitor Group Security Agreement: |
| 5.0 Responses |
| 6.0 Industry Discussions |
| B4156 Appendies final Hoods Air Supply Exhaust Systems Upgrades R2 02015017 |
| Appendix C |
| 5.5.1 General Safety Requirements |
| 5.5.A. Standard Air Intakes: Air intakes to heating, ventilating, and air conditioning (HVAC) systems that are designed to move air throughout a building that are at ground level provide an opportunity for aggressors to easily place contaminants wher... |
| 5.5.A.1 Existing Buildings: Add means such as exterior chimneys to extend the elevations of air intakes to at least 10 feet (3 meters) above the ground for all buildings that must comply with these standards. |