17. Attachment B - Drawings.pdf

PDF 1 MB Posted

Attached to
Cody Admin Bldg Roof and Bathroom
Solicitation number
89503220QWA000246
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23 June 2020

Attachment B

Cody Admin Building Roof and Bathroom - Drawings

89503220QWA000246

Cody Admin Bldg Roof

PROJECT DRAWINGS

A. GENERAL:

CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.

PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale.

Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.

STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.

INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.

EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.

REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.

CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise Western of any errors or omissions.

B. LIST OF DRAWINGS:

LOCATION MAP:

1. CDY 0017 – Location and Vicinity Map - FIO

ARCHITECTURAL:

2. CDY 3000 Rev C – Building Layout - FIO

3. CDY 3006 Rev C – Building Elevations – EI

4. CDY 3006 Rev D – Building Elevations

5. CDY 3024 Rev B – Roof Plan - EI

6. CDY 3024 Rev C – Roof Plan

7. CDY 3029 Rev B – Vehicle Storage Building – Floor Plan - EI

8. CDY 3029 Rev C – Vehicle Storage Building – Floor Plan

9. CDY 3032 - Building Elevations – FIO

10. CDY 3046 - Vehicle Storage Building – Bathroom Plan, Sects, & Dtls

MECHANICAL:

11. CDY 3304 – Vehicle Storage Building – Bathroom Plumbing Plans

12. CDY 3305 - Vehicle Storage Building – Mechanical Plan - EI

13. CDY 3305 – Rev A - Vehicle Storage Building – Mechanical Plan

ELECTRICAL:

14. CDY 3404 - Vehicle Storage Building – Electrical Power Plan - EI

15. CDY 3404 – Rev A - Vehicle Storage Building – Electrical Power Plan

16. CDY 3404 - Vehicle Storage Building – Electrical Lighting Plan - EI

17. CDY 3404 – Rev A - Vehicle Storage Building – Electrical Lighting Plan

18. CDY 3420 – Vehicle Storage Building – Electrical Panel Schedule DHE - EI

19. CDY 3420 – Rev A – Vehicle Storage Building – Electrical Panel Schedule DHE https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx

YAPA F 6400.9

( 8-82) d l'Q!l

0::

0::

I.L cri

14 (§

N.CODY

SUBJ,,/

-0 30 I

VICINITY MAP

• I

I

Rl02W IIIOIW

T53N

T52N

JL

·1 r

-::���"""'-"'=�1�'�

1J�

L�

TO GREYBULL

( /\LKIILI

L

LAKE. D

t

I D

JACKSON

UTAH

@,s

DUBOIS

DANIEL

GREV BULL

MEETEESE

WORLAND

THERMOPOLIS

SHOSHONI

RIVERTON

U\NDER 8

LOCATION MAP

BUFFALO

GILLETTE

, CASPER

�-----..._DOUGLAS

RAWLINS

LARAMIE

COLORADO

CHE_'tE.NNE

I-

D

I I

<l"'

0::

ro w z

(j).

UNITED STATES DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

HEADQUARTERS - GOLDEN COLORADO

CODY SERVICE CENTER

WYOMING

LOCATION 8 VICI-NI-TY MAP

DESIGNED JA_R!_ _!l��S- ______ RECOMMENDEp.J� _,.-Ji,-...:<,�

DR.-1WN_JAN�T _ 2.,_Y� - - - - - - -- APPROVED111£

CHECKED PETER SEEKELL _____ _

MARCH II , 1986 CDY 0017

2/ X 36

--r I i case Polygonal Line case Typewritten Text

FOR INFORMATION ONLY

cdy_0017
ADPDBF4.tmp
A. GENERAL:
ADP3BF7.tmp
A. GENERAL:
ADP62C1.tmp
A. GENERAL:
CDY_Cody Admin Bldg Roof_Drawing Cover.pdf
A. GENERAL:
Cover Page.pdf
Cheyenne Substation Gate Replacement_Specs_Cover Page
Cheyenne Substation Gate Replacement_Specs_Table of Contents
Cheyenne Substation Gate Replacement_Specs_Div 1
A. PROJECT REQUIREMENTS
C. DESCRIPTION OF BID ITEM “Mobilization and Preparatory Work”:
1. GENERAL: The Contractor shall furnish submittals as specified in the Construction Standards and this Project Specification via the email address listed below.
2. TRANSMITTAL: The Contractor shall submit all correspondence (Request For Information, Submittals, etc.) to the following email address care of the COR.
3. SUBMITTAL RESPONSE: WAPA will provide a response to all submittals in accordance with Division 1. D.2 of these Specifications with an “Acceptable for Use” or “Not Acceptable” status, with comments as appropriate, to the email address where the sub...
4. PROJECT PROTOCOL: Electronic Correspondence
Cheyenne Substation Gate Replacement_Specs_Div 2
A. General
The Contractor shall provide all labor, equipment, and materials to complete the work as defined in this section.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS
1. Bidding schedule item “Demolition”:
a. The Contractor shall remove and dispose of the following as shown on drawing CH T-001. Refer to Standard 13 for disposal information and regulations.
1. Saw-cutting asphalt driveway
2. Concrete driveway
3. Chain link fencing and associated fence posts
4. Chain link gate and associated materials and posts (Gates to be saved on site)
5. Electrical wire and associated equipment that runs from the communications box, along the north fence running to the east, runs along the east fence to the south, and enters the garage to connect to panel. This wire is only buried at the driveway a...
b. SUBSTATION AND CONTROL EQUIPMENT PROTECTION: The substation and control equipment shall remain energized for the duration of this project. The Contractor shall protect all equipment inside the control building from weather exposure, dust, and any...
2. Bidding schedule item “EXCAVATION”:
a. Excavations for foundations and slabs as shown on drawing CH 3032 and T-001.
1. Contractor shall take extra care to note locations of underground conduit as shown on drawing CH 1716, when excvating.
b. Trenching for conduits, detector loops, and cables as necessary to install new gate as shown on drawings CH 3032 and T-001.
1. Contractor shall take extra care to note locations of grounding grid as shown on drawing CH 1503, when trenching. Contractor shall repair at their own cost, any grounding grid damage that occurs during trenching in accordance with Standard 9, secti...
3. Bidding schedule item “BACKFILL”:
a. Disturbed soil between finished driveway and undisturbed soil shall be finished to match existing.
b. Placing and compacting earth material under foundations and all other concrete placements.
c. Providing 12” of gravel fill under pivot gate concrete foundation slab (not under pilings). See foundation on Sheet 3.
d. Providing sand fills and earthen material as necessary to backfill conduit trenches.
1. Buried conduit shall be bedded in a minimum of 6 inch sand fill. Sand material shall meet ASTM C33 for fine aggregate. Conduit shall be spaced with a minimum of 1 inch clear distance between each conduit and sand fill placed between conduits.
4. Bidding schedule item “FENCING”:
Cheyenne Substation Gate Replacement_Specs_Div 3
A. GENERAL:
The Contractor shall provide all labor, equipment, and materials to complete the work as defined in this section.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
Cheyenne Substation Gate Replacement_Specs_Div 11
Cheyenne Substation Gate Replacement_Specs_Div 13 NOT FROM ENVIRO
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. DESCRIPTION OF REQUIREMENTS: Bidding Schedule does not contain a separate item for “Environmental Quality Protection”. The cost of compliance with requirements of Construction Standard 13 – Environmental Quality Protection shall be included in th...
Cheyenne Substation Gate Replacement_Specs_Div 15
Message from the Administrator
Specs_Logo

File details come from the government source that posted it. Updated .