17. Attach 2 App B Tree Meas.docx

DOCX document 88 KB Posted

Attached to
IRSC San Juan NF, CO Dolores RD
Solicitation number
1240BD21Q4002
Issued by

View the file

Other files

File Type Posted
17. Attach 5 WD's Dolores Cty, CO.pdf PDF
17. Attach 6 Past Perf Ques.docx DOCX document
17. Attach 3 App C Luggan Road Maint.docx DOCX document
17. Attach 7 IPP Payment Requirements.docx DOCX document
17. Attach 4 Luggan Maps.pdf PDF
17. 1240BD21Q4002 Luggan V1.pdf PDF
17. Attach 1 App A Tech Spec's.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

Appendix B Tree Measurement

RFQ # 1240BD21Q4002

APPENDIX B- TREE MEASUREMENT

STEWARDSHIP CONTRACT TIMBER REMOVAL SPECIFICATIONS

Luggan Stewardship IRSC Page 1 of 13

Revised 2.16.2021

BT1.0 CONTRACT AREA

BT1.1 Contract Area Map BT1.2 Claims

BT2.0 TIMBER SPECIFICATIONS

BT2.1 Included Timber BT2.11 Standard Timber BT2.12 Substandard Timber BT2.13 Damaged Timber BT2.131 Damaged by Contractor BT2.13.2Negligent or Willful Damage BT2.134 Minor Damage by Natural Causes BT2.14 Unintentionally Cut Timber BT2.15 Construction Timber BT2.16 Other Material BT2.2 Utilization and Removal of Included Timber BT2.3 Timber Designations BT2.31 Clearcutting Units BT2 32 Construction Clearing BT2.3.21 Road Clearings BT2.322 Other Authorized Clearings BT2.33 Overstory Removal Units BT2.34 Understory Removal Units BT2.35 Individual Trees BT2.37 Designation Changes BT2.4 Quantity Estimate

BT3.0 RATES OF PAYMENT

BT3.1 Current Contract Rates BT3.4 Other Payment Rates BT3.41 Material and Quantities Not in Division AT BT3.42 Timber Cut Through Mistake BT3.43 Undesignated Timber Damaged Without Negligence BT3.44 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut BT3.45 Liquidated Damages

BT4.0 PAYMENTS

BT4.1 Amount Payable for Timber BT4.2 Integrated Resource Account BT4.215 Deposits When Payment Guaranteed

BT6.0 OPERATIONS

BT6.33 Safety BT6.4 Conduct of Logging BT6.41 Felling and Bucking BT6.411 Felling in Clearings BT6.412 Stump Heights BT6.414 Limbing BT6.42 Skidding and Yarding BT6.421 Rigging BT6.422 Landings and Skid Trails BT6.423 Skidding on Roads BT6.424 Arches and Dozer Blades BT6.63 Temporary Roads BT6.64 Landings BT6.65 Skid Trails and Fire Lines BT6.66 Current Operating Areas BT6.67 Erosion Control Structure Maintenance BT6.7 Slash Disposal BT6.8 Measuring **BT6.842 Product Identification

BT8.0 OTHER CONDITIONS

BT8.1 Title and Liability BT8.11 Title Passage BT8.12 Liability for Loss BT8.5 Sale of Other Materials

CT2.301# - Cutting Unit Boundaries. (9/01) CT2.353# – Designation by Damage Class. (9/04) RO-CT2.355# - Individual Trees (Cut Tree Marking).

CT4.4 - Payments Not Received. (8/12) CT5.12# – Use of Roads by Contractor. (9/04) RO-CT5.36# - Snow Removal (9/01) RO-CT5.41# - Closure To Use By Others (4/04) RO-CT6.223 – Protection of Fences. (9/01) RO-CT6.312# - Sale Operation Restrictions. (4/04) RO-CT6.411# - Felling and Bucking (Special Objectives). (11/98) RO-CT6.42# - Skidding And Yarding (Special Objectives).

RO-CT6.6# - Erosion Prevention And Control. (11/98) RO-CT6.601# - Erosion Control Seeding. (11/98) RO-CT6.7# - Slash Treatment. (4/03) RO-CT6.8# - Measuring. (9/03) RO-CT6.81# - Accountability. (4/03) R2-CT7.2 – Fire Precautions. (9/93) WO-CT8.66# Use of Timber (Option 1) (9/04)

Division AT

Location and Area:

This Contract Area of 625 acres is more or less located in Portions of sections 1, 2, 10, 11 & 12. Township 41 North, Range 17 West;

Dolores County, CO. New Mexico Principal Meridian.

Volume Estimate and Utilization Standards

Species Group
Product
Estimated

Quantity * Unit of Measure Minimum Specifications

Merchantable Tree
Piece Required to be Removed

Diameter Breast High (d.b.h.)

(inches) Number of Minimum Pieces per Tree Length

(feet) Diameter Inside Bark at Small End

(inches) Net Scale in % Gross Scale 1/

Live & Dead Ponderosa Pine
Sawtimber
1488
CCF
9.0”
1
8.0’
6.0”
10.67x

Live & Dead Ponderosa Pine

Nonsaw
52
CCF
5.0”
1
6.5’
4.0”
8.00x

Timber Subject to Agreement

NA

Total Quantity

1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.

Timber Designations, acres are approximate:

Number

Acres

Clearcutting Units (B2.31)

Overstory Removal Units (B2.33)

Understory Removal Units (B2.34)

Individual Trees (B2.35)
All

Designation by Description or Prescription (C2.351-C2.355)

High Stumps

Species
Product
Maximum Stump Height

(inches)

All
All
12”

Roads

Name and Date of Governing Road Specifications:
NA
Project
Design

Class Approx.

Length (mi./km.)

Sheet Numbers and Approval Date Performance Responsibility

Survey
Design
Const.

Staking1/

Road No.
Name

NA

1/ Indicate timing, i.e., before clearing (BC) or after clearing (AC).

Specification sheets with itemized construction codes also attached

Schedule of Payment Units

Payment Unit Number Approx.

Acres To be Paid for at Flat Rates

Total Flat Rate Payment Total Required Deposits For Slash Disposal $

Species
Products
Quantity
Unit of

Measure

NA

APPLICABLE REGIONAL CLAUSES MAY BE ADDED

UNITED STATES DEPARTMENT OF AGRICULTURE

Forest Service

TIMBER REMOVAL SPECIFICATIONS

CLAUSES FOR TREE MEASUREMENT TIMBER REMOVAL CONTRACTS

(Applicable to Contracts to be Measured Before Felling)

This Division is organized into Parts, Sections, Subsections, and Items. These are numbered in accordance with the following scheme: Part BTl.0, Section BTl.1, Subsection BTl.11, and Item BTl.111. References to a Part include all Sections, Subsections, and Items within that Part; references to a Section include all Subsections and Items within that Section; and references to a Subsection include all Items within that Subsection. Cross references within this contract cite the reference number of the applicable Division, Part, Section, Subsection, and Item. Descriptive headings used are not to be considered in determining the rights and obligations of the parties hereunder. The Standard Clauses in this Division are subject to Specific Conditions of the contract stated in Division AT. Wherever appropriate, Specific Conditions established in Division AT are herein cited by reference number. References to Standard Clauses also apply to Special CT Clauses with the same numbers. These clauses are applicable only to the timber removal portion of the Luggan Stewardship Contract except where otherwise specifically referenced. “Timber” when used in this appendix includes timber and other products.

BT1.0—CONTRACT AREA

BT1.1 Contract Area Map. The boundaries of “Contract Area” and any Payment Unit thereof, are as shown on the attached “Contract Area Map” that is made a part hereof, and were, before contract solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of Contract Area and its approximate acreage are stated in Division A. Payment Units may be revised and additional ones may be established only by written agreement. Upon Contractor’s request, Forest Service shall subdivide Payment Units to reduce them to a size that can be logged within 60 days at Contractor’s normal rate of logging.

Where applicable, the following are also identified on Contract Area Map:

(a) Identified claims limiting Contractor’s rights under BT1.2.

(b) Payment Units where timber is to be Measured or Marked after date of contract solicitation and approximate location of sample Marked timber under BT2.36 and BT2.4.

(c) Boundaries of Clearcutting Units, Overstory Removal Units, and Understory Removal Units under BT2.3.

(d) Diameter limits for Overstory Removal Units and Understory Removal Units under BT2.33 and BT2.34.

(e) Areas where leave trees are Marked to be left un-cut under BT2.35.

(f) Specified Roads listed in AT7.

(g) Sources of base course, surface rock, and rock riprap listed in the Schedule of Items.

(h) Roads where log hauling or use is prohibited or restricted.

(i) Roads and trails to be kept open.

(j) Improvements to be protected.

(k) Locations of known wildlife or plant habitat and cave resources to be protected.

(l) Locations of areas known to be infested with specific invasive species of concern.

(m) Maximum stump heights when more than one height is listed by areas in AT6 under BT6.412.

(n) Skidding or yarding methods specified under BT6.42.

(o) Streamcourses to be protected.

(p) Locations of meadows requiring protection.

(q) Locations of wetlands requiring protection.

(r) Locations of temporary roads to be kept open; and

(s) Other features required by Division BT or CT.

BT1.2 Claims. Valid claims are excluded from Contract Area, except those on which timber cutting is authorized in writing by the claimant and except mining claims on which cutting is authorized by the Act of July 23, 1955 (30 USC 614). Claims that limit Contractor’s rights to operate under this contract and that Forest Service has been able to identify are shown on Contract Area Map. Contractor is not obligated to operate contrary to existing claim limitations. Forest Service shall designate boundaries of claims on the ground to the extent necessary to identify Included Timber.

BT2.0—TIMBER SPECIFICATIONS

BT2.1 Included Timber. “Included Timber” consists of:

BT2.11 Standard Timber. Live and dead trees and portions thereof that meet Utilization Standards under BT2.2 and are designated for cutting under BT2.3.

BT2.12 Substandard Timber. Live and dead trees that:

(a) Do not meet Utilization Standards and

(b) Are located in Clearcutting Units or construction clearings or are otherwise designated for cutting.

BT2.13 Damaged Timber.

BT2.131 Damaged by Contractor. Undesignated live trees meeting Utilization Standards:

(a) Within 200 feet slope distance from centerline of roads constructed hereunder that are damaged by Contractor’s construction to the extent that considerable deterioration or mortality is imminent and are designated by Forest Service for felling before the nearest road segment is Substantially Completed or

(b) That are damaged by Contractor in logging or stewardship project operations and are subsequently Marked before Contractor has completed work in the immediate area.

By agreement, such trees may be left without charge if their removal would cause undue damage or be grossly uneconomic.

BT2.132 Negligent or Willful Damage. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Contracting Officer.

BT2.134 Minor Damage by Natural Causes. Undesignated trees within Contract Area and meeting Utilization Standards, in amounts that become insect infested, windthrown, suffer serious damage, or die, as designated by agreement.

BT2.14 Unintentionally Cut Timber. Trees within or immediately adjacent to Contract Area or to road construction or other authorized clearing outside Contract Area, not designated for cutting under BT2.3 but that are cut through mistake by Contractor, when included by Contracting Officer.

BT2.15 Construction Timber. Trees to be used for construction under this contract.

BT2.16 Other Material. Species or products not listed in the contract, upon written approval of Forest Service.

BT2.2 Utilization and Removal of Included Timber. “Utilization Standards” for trees and minimum pieces are stated in Division AT. To meet minimum tree specifications, trees must equal or exceed tree diameters listed in Division A and contain at least one minimum piece. Except for timber required or authorized to be left, Contractor shall fell and buck such trees and shall remove from Contract Area all pieces that:

(a) Meet minimum piece standards in Division AT or

(b) Do not meet such standards but would have qualified as part of minimum pieces if bucking lengths were varied to include such material.

BT2.3 Timber Designations. Timber designated for cutting shall be confined to Contract Area, except as otherwise provided in BT2.131, BT2.14, BT2.15, and BT2.32. Contract Area Map indicates Payment Units, if any, where Marking under BT2.35 is to be done after contract advertisement, except for construction clearing under BT2.23, designation changes under BT2.37, and damaged timber. The boundaries of Clearcutting Units, Overstory Removal Units, and Understory Removal Units were plainly Marked on ground before contract advertisement and are shown on Contract Area Map. Boundary trees shall not be cut. Such units where Measuring is to be completed after date of contract advertisement are also shown. The number of units and approximate acreage of timber designations are stated in Division AT.

BT2.31 Clearcutting Units. All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

BT2.32 Construction Clearing. All timber is designated for cutting that is within the clearing limits of roads constructed hereunder or is in other authorized clearings. All dead or unstable live trees are designated for cutting that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified and Temporary Roads when Marked in advance of work in the immediate area. Pieces meeting Utilization Standards from such dead or unstable live trees shall be removed unless there is agreement that to do so could damage the road.

BT2.321 Specified Road Clearings. Timber within the clearing limits of Specified Roads is within separate Payment Units, as shown on Contract Area Map, and the quantities are in Division AT. These Payment Units are subject to revision, as specified in BT2.37. The quantities of dead or unstable trees designated outside the clearing limits are not included in Division AT.

BT2.322 Other Authorized Clearings. Timber within authorized clearings for Temporary Roads, landings, or other construction clearings is designated for cutting. Quantities of such timber are not included in Division AT.

BT2.33 Overstory Removal Units. All trees within “Overstory Removal Units” are designated for cutting when they meet Utilization Standards and equal or exceed the diameter limits shown on Contract Area Map.

BT2.34 Understory Removal Units. All trees within “Understory Removal Units” are designated for cutting when they meet Utilization Standards and are smaller than the diameter limits shown on Contract Area Map.

BT2.35 Individual Trees. All trees to be cut, other than in the units described in BT2.31, BT2.32, BT2.33, and BT2.34, are Marked or designated by description. Trees are “Marked” when individually designated by Forest Service with paint marks above and below stump height. Contract Area Map indicates areas plainly identified on the ground where leave trees are Marked to be left uncut.

BT2.37 Designation Changes. Within Contract Area, minor adjustments may be made in boundaries of cutting units or in the timber individually Marked for cutting when acceptable to Contractor and Forest Service.

BT2.4 Quantity Estimate. The estimated quantities of timber by species designated for cutting under BT2.3 and expected to be cut under Utilization Standards are listed in Division AT. Estimated quantity in Division AT does not include the following:

(a) Damaged timber under BT2.13.

(b) Unintentionally cut timber under BT2.14.

(c) Construction timber under BT2.15 cut outside of Payment Units and removed from construction use for utilization by Contractor.

(d) Timber within clearing limits of Temporary Roads or other authorized clearings and that is not designated under BT2.31, BT2.33, BT2.34, or BT2.35; or

(e) Dead or unstable live trees that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified Roads under BT2.32.

Estimated quantities for such timber not included in Division AT shall be determined as stated herein.

If Contract Area Map shows Payment Units where Marking or Measuring is to be completed after date of con-tract advertisement, the objective of Forest Service shall be to designate for cutting in such Payment Units sufficient timber so that Contract Area shall yield the approximate estimated quantities by species or species groups stated in Division AT. However, the estimated quantities stated in Division AT are not to be construed as guarantees or limitations of the timber quantities to be designated for cutting under the terms of this contract.

BT3.0—RATES OF PAYMENT

BT3.1 Current Contract Rates. Included Timber that is Released for Cutting shall be paid for at Current Contract Rates determined under this Section. “Current Contract Rates” shall be Flat Rates. Flat Rates shall be those listed in Division AT or B2 of the Schedule of Items. In the event contract time is adjusted, Current Contract Rates shall be continued in the same manner as immediately prior to the adjustment period.

BT3.4 Other Payment Rates.

BT3.41 Material and Quantities Not in Division AT. Incidental amounts of products or portions of trees of species that do not meet Utilization Standards may be removed without charge. Such material may be purposely removed in more than incidental amounts without charge upon written approval of Contracting Officer, and subject to agreement on deposits if needed for road maintenance and use. Other species or products not listed may be cut and removed upon written approval of Contracting Officer and subject to agreement on rates of payment. Timber for which the quantity is not included in the estimate, shall be paid for at Current Contract Rates and Required Deposits.

BT3.42 Timber Cut Through Mistake. Undesignated timber meeting Utilization Standards, cut by Contractor through mistake and included by Contracting Officer under BT2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such material is not listed in Division AT. In such event, Contracting Officer, in accord with standard Forest Service methods, shall establish rates to be paid.

BT3.44 Undesignated Timber Damaged Without Negligence. Undesignated timber meeting Utilization Standards, damaged without negligence by Contractor and designated by Forest Service under BT2.131, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits.

BT3.45 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Forest Service under BT2.132, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits that are in addition to liquidated damages under BT3.46. If such timber is of a species or size not listed in Division AT or is of a quality different from designated timber, Contracting Officer shall establish payment rates in accord with standard Forest Service methods.

BT3.46 Liquidated Damages. Unnecessary damage to or negligent or willful cutting of undesignated timber, as described in BT3.45, on portions of Contract Area cut over under this contract is likely to cause substantial silvicultural or other damage to the National Forest. It will be difficult, if not impossible, to determine the amount of such damage. Therefore, Contractor shall pay as fixed, agreed, and liquidated damages an amount equivalent to the amount payable at Current Contract Rates. If designated by Contracting Officer, Contractor shall remove such dam-aged or cut timber and pay for it at Current Contract Rates.

BT4.0—PAYMENTS

BT4.1 Amount Payable for Timber. Except as provided in BT3.1, Current Contract Rates and Required Deposits in effect when a Payment Unit is Released for Cutting shall be applied to the timber quantities to determine the amount Contractor shall pay. A “Payment Unit” is a portion of Contract Area established for payment purposes.

BT4.2 Integrated Resource Account. “Integrated Resource Account” is an account maintained by Forest Service of all Contractor’s deposits, credits, payment guarantees, and the charges for:

(a) Timber at Current Contract Rates.

(b) Slash disposal and road maintenance at Required Deposit rates.

(c) Stewardship Credits established; and

(e) Other charges provided in this contract.

Cash deposits and Stewardship Credits earned shall be recorded currently in such account.

Charges for timber cut shall be made when Forest Service prepares and furnishes to Contractor periodic statements of volume and value of such timber cut and Scaled. Charges against Stewardship Credits shall be limited to timber value more than Required Deposits. Required Deposits and Other Charges shall be paid in cash.

Contractor shall make cash deposits to meet Contractor’s obligations within 15 days of billing by the Forest Service. Deposits shall be made to Forest Service, USDA, by mail or delivery to the address shown on the bill for collection.

BT4.215 Deposits When Payment Guaranteed. To the extent payment guarantee is provided under Clause entitled, “PRODUCT PAYMENT GUARANTEE” requirements for advance cash deposits shall be waived for the value of Product on contract area that is cut, but not removed, and for the value of Products removed from contract area, up to limit of remaining stewardship credits to be earned and exchanged for value of included product except for Required Deposits and Associated Charges. Associated charges shall be waived for not more than one monthly billing period.

BT6.0—OPERATIONS

BT6.33 Safety. Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees.

In the event that Contracting Officer identifies a conflict between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an adjustment in Current Contract Rates to compensate for the changed conditions.

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Ser-vice shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.

BT6.4 Conduct of Logging. Unless otherwise specifically provided herein, Contractor shall fell trees designated for cutting and shall remove the portions that meet Utilization Standards, as provided in BT2.2, prior to acceptance of Payment Unit for completion of logging. Forest Service may make exceptions for occasional trees inadvertently not cut or trees or pieces not removed for good reason, including possible damage to forest resources or gross economic impracticability at the time of removal of other timber. Logging shall be conducted in accordance with the following, unless other clauses set forth requirements to meet special or unusual logging conditions:

BT6.41 Felling and Bucking. Felling shall be done to minimize breakage of Included Timber and damage to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in Division AT. Contractor may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net Measure in percentage of gross Measure, or based on the merchantability factor, whichever is stated in Division AT. If necessary to assess extent of defect, Contractor shall make sample saw cuts or wedges.

BT6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings permit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and areas of regeneration cutting.

BT6.412 Stump Heights. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in Division AT except that occasional stumps of greater heights are acceptable when Contractor determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Contractor shall re-cut high stumps so they will not exceed heights specified in Division AT and shall dispose of severed portions in the same manner as other logging debris. The stump heights shown in Division AT were selected with the objective of maximum reasonable utilization of the timber, unless Contract Area Map shows special areas where stump heights are lower for aesthetic, land treatment, or silvicultural reasons.

BT6.414 Limbing. When Forest Service determines it is necessary to minimize damage to the residual stand during skidding, Contractor shall cut exposed limbs from products prior to skidding. Contractor may leave un-cut those limbs that cannot be cut with reasonable safety.

BT6.42 Skidding and Yarding. Methods of skidding or yarding specified for particular areas, if any, are indicated on Contract Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding.

BT6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees designated for cutting.

BT6.422 Landings and Skid Trails. Location of all landings, tractor roads, and skid trails shall be agreed upon prior to their construction. The cleared or excavated size of landings shall not exceed that needed for efficient skidding and loading operations.

BT6.433 Skidding on Roads. Products may be skidded on permanent roads authorized for hauling only by prior written agreement.

BT6.424 Arches and Dozer Blades. Skidding tractors equipped with pull-type arches or dozer blades wider than tractor width or C-frame width, whichever is greater, shall not be used in residual timber outside Clearcutting Units and other authorized clearings, except on constructed tractor roads or landings, unless there is written agreement that residual timber will not be damaged materially by such use.

BT6.63 Temporary Roads. As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as out-sloping, drainage dips, and water-spreading ditches.

After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out-slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.

BT6.64 Landings. After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize erosion.

BT6.65 Skid Trails and Fire Lines. Contractor shall construct cross ditches and water-spreading ditches on tractor roads and skid trails, where staked or otherwise marked on the ground by Forest Service. Forest Service shall designate cross ditching on Contractor-built fire lines prior to or during construction. By agreement, Contractor may use other comparable erosion control measures, such as backblading skid trails, in lieu of cross ditching.

BT6.66 Current Operating Areas. Where logging, road construction, or other stewardship project work is in progress but not completed, unless agreed otherwise, Contractor shall, before operations cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion.

Such protection shall be provided, prior to end of November 30th for all disturbed, unprotected ground that is not to be disturbed further prior to end of operations each year, including roads and associated fills, tractor roads, skid trails, and fire lines. When weather permits operations during December 1st through February 28th. Contractor shall keep such work on any additional disturbed areas as up to date as practicable.

BT6.67 Erosion Control Structure Maintenance. During the period of this contract, Contractor shall provide maintenance of soil erosion control structures con-structed by Contractor until they become stabilized, but not for more than 1 year after their construction. Contractor shall not be responsible for repair of such structures damaged by other National Forest users whose activities are not a part of Contractor’s Operations.

BT6.7 Slash Disposal. Contractor’s timing of product removal and preparatory work shall not unnecessarily delay slash disposal. Specific slash disposal measures to be employed by Contractor are stated elsewhere herein and are in addition to Required Deposits for slash disposal.

BT6.8 Measuring. “Measuring” is the estimation of timber quantities using certain dimensions and applicable volume tables or formulae to determine the contents of trees or stands in a standard manner. Sampling may be on an individual tree or area basis. Examples of standard procedures are tree measurement, sample tree measurement, and area estimate. The quantity of timber designated or to be designated for cutting has been or shall be Measured, as specified in this contract

BT6.842 Product Identification. For contracts west of the 100th meridian, before removal from Contract Area, unless Contracting Officer determines that circumstances warrant a written waiver or adjustment, Contractor shall:

(a) Hammer brand all products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter.

(b) West of the 100th meridian, paint with a spot of highway-yellow paint all domestic processing products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter. Each paint spot must be not less than three (3) square inches in size.

Contracting Officer shall assign brands and, if Contract Area is within a State that maintains a log brand register, brands shall be registered with the State. Contractor shall use assigned brand exclusively on logs from this contract until Contracting Officer releases brand. Contractor will furnish and apply highway-yellow paint of a lasting quality (oil-base or equivalent).

All hammer brands and/or highway-yellow paint must remain on logs until they are domestically processed. Contractor shall replace identifying marks if they are lost, re-moved, or become unreadable. Contractor may remanufacture products into different log lengths. Except for logs remanufactured as part of the mill in-feed process immediately before processing, remanufactured products must be rebranded with the assigned contract brand and repainted with highway-yellow paint, unless otherwise agreed to in writing by Contracting Officer. For such remanufactured products, Contracting Officer may approve use of a brand to be used exclusively as a catch brand, in lieu of the assigned contract brand.

BT8.0—OTHER CONDITIONS

BT8.1 Title and Liability.

BT8.11 Title Passage. All right, title, and interest in and to any Included Timber shall remain in Forest Service until it has been Measured, removed from Contract Area or other authorized cutting area, and paid for, at which time title shall vest in Contractor. Timber cut under the terms of clause Product Payment Guarantee, shall be considered to have been paid for. Title to any Included Timber that has been Measured and paid for, but not removed from Contract Area or other authorized cutting area by Contractor on or prior to contract termination, shall remain in Forest Service.

BT8.12 Liability for Loss. If Included Timber is destroyed or damaged by an unexpected event that significantly changes the nature of Included Timber, such as fire, wind, flood, insects, disease, or similar cause, the party holding title shall bear the timber value loss resulting from such destruction or damage; except that such losses caused by insect or disease after felling of timber shall be borne by Contractor, unless Contractor is prevented from removing such timber for reasons by the Forest Service. Deterioration or loss of value of salvage timber is not an unexpected event.

In the event Included Timber to which Forest Service holds title is destroyed, Contractor will not be obligated to remove and pay for such timber. In the event Included Timber to which Forest Service holds title is damaged, Contracting Officer shall make an appraisal to determine for each species the difference between the appraised unit value of Included Timber immediately prior to the value loss and the appraised unit value of timber after the loss. Current Contract Rates in effect at the time of the value loss shall be adjusted by differences to become the redetermined rates.

There shall be no obligation for Forest Service to supply, or for Contractor to accept and pay for, other timber in lieu of that destroyed or damaged. This Subsection shall not be construed to relieve either party of liability for negligence.

BT8.5 Sale of Other Materials. Forest Service reserves the right to sell from Contract Area during the period of this contract any materials or products not subject to its terms, but shall not permit removal, possession, or use thereof that will materially interfere with Contractor’s Operations. Contractor shall not be obligated to do any work made necessary by the action of others.

NOTE TO CO – THERE ARE A LOT OF REFERENCES TO OTHER CLAUSES IN THIS NEXT SECTION. IF YOU USE ANY OF THESE CLAUSES BE SURE TO CHECK THE REFERENCES TO ENSURE YOU ARE NOT REFERENCING CLAUSES THAT WILL BE EXCLUDED!

INSERT WO AND REGIONAL CT CLAUSES AS NEEDED AND NOT IN CONFLICT WITH OTHER SECTIONS OF THIS CONTRACT.

RO-CT2.301# - CUTTING UNIT BOUNDARIES. (9/01) The boundaries of cutting units are designated as shown in the following table. The trees used for boundarydesignation are not to be cut.

Cutting Unit Boundary Designation Table

Cutting UnitPaint ColorDesignation
All
Orange
Two vertical stripes facing along boundary and a dot facing into the area to be cut. Butt mark below stump height.

CT2.353# – DESIGNATION BY DAMAGE CLASS. (9/04) Within Payment Unit(s) or cutting unit(s) ALL, as shown on Contract Area Map, the following criteria are used to designate trees and other products for cutting and removal:

(a) Trees 5.0” to 20.0” with 100% brown or red needles, or no needles.

(b) Additional trees to be cut, if any, are Marked with Yellow paint.

(c) Cutting unit boundaries and other trees that shall be left uncut are Marked with Orange paint.

RO-CT2.355# - INDIVIDUAL TREES (CUT TREE MARKING). (9/01) Notwithstanding BT2.35, individual trees are designated for cutting only if marked above and below stump height as show in the table below.

Cut Tree Marking Table

Cutting Unit Paint Color

ALL
BLUE

CT4.4 Payments Not Received. (8/12) (a) Payments are due and payable on the date of issue indicated on the bill for collection. When a payment for timber cut and other charges is not received at the location designated by Forest Service by the date specified in the bill for collection, Contracting Officer will sus- pend all or any part of Purchaser’s Operations until payment or acceptable payment guarantee is re- ceived. Other charges include, but are not limited to:

(i) Slash disposal and road maintenance deposits;

(ii) Cooperative work at rates established by specific agreement under BT4.218;

(iii) Damages pursuant to BT9.4;

(iv) Road use fees;

(v) Restoration of downpayment pursuant to BT4.22;

(vi) Periodic payments pursuant to BT4.213; (vii)Extension Deposits pursuant to BT4.217; and (viii)Other mandatory deposits.

(b) Failure to pay amounts due by the date specified in the bill for collection shall be considered a breach under BT9.3. The 30-day notice period prescribed therein shall begin to run as of the end of busi- ness on the date specified for receipt of payments.

If the performance or payment is guaranteed by surety bond, the surety will receive a copy of the written notification of breach. Demand will be made on the surety or other institution providing the guarantee or bond instrument for immediate payment 10 days after issuance of written notification of the breach.

(c) Pursuant to the Debt Collection Improvement Act of 1996, as amended, if payment is not received by Forest Service within 15 days after the date of issue indicated on the bill for collection: (i) Simple interest shall be assessed at the Current Value of Funds Rate as established by the Secretary of the Treasury. Interest will begin to accrue as of the date of issue indicated on the initial bill for collection.

(ii) Debtors will be assessed administrative charges, in addition to the delinquent amount due. Administrative charges are those additional costs incurred by the Government in processing, han- dling, and collecting delinquent debts.

(iii) A penalty charge of six (6) percent per annum will be assessed on any portion of a debt de- linquent more than 90 days. This penalty charge is in addition to interest and administrative charges under paragraphs (c)(i) and (c)(ii). The penalty charge shall accrue from the date of issue indicated on the bill for collection and shall be assessed on all outstanding amounts, including interest and ad- ministrative costs assessed under paragraphs (c)(i) and (c)(ii).

(iv) Payments will be credited on the date received by the Federal Depository or Collection Officer designated on the bill for collection.

(d) Forest Service remedies for Purchaser’s failure to make payment for timber cut and other charg- es when due, except for accrual of interest, suspension of all or any part of Purchaser’s Operations, and administrative offset, shall be stayed for so long as: (i) A bona fide dispute exists as to Purchaser’s obligation to make such payment and

(ii) Purchaser files and prosecutes a timely Claim.

CT5.12# – USE OF ROADS BY CONTRACTOR. (9/04) Contractor’s use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:

Code Use Limitations

XHauling prohibited
RHauling restricted
UUnsuitable for hauling prior to completion of agreed reconstruction
PUse prohibited
APublic use restriction
WRegulation waiver

Roads coded A will be signed by Forest Service to inform the public of use restrictions. Contractor’s use of roads coded R, A, or W shall be in accordance with the following restrictions:

Restricted Road List

Road Number
Road Name
Termini
Miles
Map Legend
Description of Restrictions
From
To
504
Lone Dome
0.0
18
18
R
Log trucks are restricted to a maximum gross vehicle weight of 85,000 lbs.
508
Wolf Den
0.0
2.7
2.7
508.A
Wolf Den A
0.0
1.1
1.1
ALL
All other roads
0.0
EOR
-
X
All use prohibited

RO-CT5.36# - SNOW REMOVAL. (9/01) Snow removal shall be done in a manner to preserve and protect the roads to insure safe and efficient transportation and to prevent unacceptable erosion damage to roads, streams, and adjacent lands.

A. Description. Snow removal work by Purchaser shall include:

1. Removal of snow from entire road surface width including turnouts.

2. Removal of snow slides, minor earth slides, fallen timber and boulders that obstruct normal road surface width including turnouts.

3. Maintain drainage so that the drainage system will function efficiently.

B. Performance. All items of snow removal shall be done currently as necessary to insure safe, efficient transportation. Work shall be done in accordance with the following minimum standards of performance.

1. Removal of material. All debris, except snow and ice, that is removed from the road surface and ditches shall be deposited away from stream channels at agreed locations.

2. During snow removal operations, banks shall not be undercut nor shall gravel or other selected surfacing material be bladed off the roadway surface.

3. Ditches and culverts shall be kept functional during and following roadway use.

4. Snow berms shall not be left on the road surface. Berms left on the shoulder of road shall be removed and/or drainage holes shall be opened and maintained. Drainage holes shall be spaced as required to obtain satisfactory surface drainage without discharge on erodible fills.

5. Dozers and skidders shall not be used to plow snow on system roads without written approval of Forest Service. Upon approval, dozers and skidders must be equipped with shoes or runners to keep the plow blade a minimum of 2 inches above the road surface unless specifically removed from the requirements in writing.

6. Snow must not be removed to the road surface. A minimum 2 inch depth must be left to protect the roadway.

7. Purchaser's damage from, or as a result of, snow removal shall be restored in a timely manner.

RO-CT5.41# - CLOSURE TO USE BY OTHERS (4/04)

A. Closure of Roads During Period of Contract. Unless otherwise agreed in writing between Purchaser and Forest Service, Purchaser shall within 15 days of receipt of notice from Forest Service, install gates listed below and close gates on roads designated "To Be Closed" on Sale Area Map and listed below to effectively block access behind such gates to vehicle traffic except that constituting official use. Installation of gates shall follow closure details attached hereto and made a part hereof.

Official vehicle traffic shall constitute that use by Purchaser and his employees when engaged in timber sale activities. It shall also include administrative traffic by Forest Service, and other landowners for the administration of their lands. Purchaser will close gates as directed by Forest Service at the completion of daily activities or close gates after passage of each vehicle. Forest Service will monitor and administer closure activities.

Gate Location(s)

Road Number
Location
Gate

Furnished By 1/ Gate Installed By 1/ In Place 3/

504
Botton of 504 switchbacks
FS
FS
YES

B. Closure of Roads at End of Purchaser's Use. Unless otherwise agreed in writing between Purchaser and Forest Service, upon completion of use, Purchaser shall effectively close to public use the following roads designated "To Be Closed" on Sale Area Map and listed below. As an element of final road maintenance and environmental or resource protection, the designated closure shall be accomplished by using the methods required for each road as described below:

Installation of barricades, which may include earth berms, logs, timber, rock, metal railing, etc., in accordance with details attached hereto and made a part hereof, including the proper barricade and closure signing.

Scarify, seed, and fertilize these travel ways full width as described in CT6.601#. Recontour or reshape cut or fill slopes in accordance with details attached hereto and made a part hereof; seed, scarify, and fertilize as described under CT6.601#; pull existing drainage structures; haul designated culverts to approved stockpile site, or other work needed to obliterate or put road to bed as described in attached road logs or details. Construct cross ditches by cutting a dip at least six (6) inches deep in the road surface and mounding the excavated material along the downgrade edge of the dip. Dips shall be cut at a sufficient angle so that they will drain to the outside of the road. They shall cross the entire width of the roadbed and be constructed at the following spacing:

Water Dip Specification(s)

Percent Grade
Maximum Spacing
NA
NA

Close and Lock Existing Gate(s)

Closure Location(s)

Road Number
Location
Closure Method 2/
Furnished

By 1/ In Place 3/

504
Botton of 504 switchbacks
Lock
FS
YES

During the life of this contract, Purchaser is authorized to install temporary barricades on the roads designated "To Be Closed." Gates with adequate and protected locks may be considered a temporary barricade. Temporary barricades shall be installed so that they may be readily opened by Purchaser or Forest Service for access to Sale Area in case of fire or other emergency. Official vehicle traffic shall also include administrative traffic by Forest Service and other landowners for the administration of their lands. Purchaser shall provide and post approved signs as authorized by Forest Service.

C. Purchaser's Operations in areas otherwise closed to motorized vehicle. During the period January 1st to Decmber 31st when Purchaser's Operations are in areas otherwise closed to motorized vehicles, Purchaser shall not be permitted to hunt, transport hunters, discharge firearms, or transport big game animals with vehicles within the closed areas.

RO-CT6.223 – PROTECTION OF FENCES. (9/01) Unless otherwise agreed to in writing, all fences, as designated on Sale Area Map, which are required to be cut because of temporary road construction, skid road construction, or other logging activities, shall not be cut until the fence has first been "line braced" or "fence braced," to prevent loss of tension, on both sides of the wire span or series of short spans to be cut.

The Purchaser shall install temporary cattleguards in accordance with attached plans at each location where the fence is cut for temporary road access unless otherwise approved in writing by Forest Service. All fences will be restored promptly after logging to the condition existing immediately prior to logging. Fence repair will be kept current with logging operations.

RO-CT6.312# - SALE OPERATION RESTRICTIONS. (4/04) Unless otherwise agreed to in writing, sale operations will be restricted as listed below:

Sale Operation Restriction Schedule

Cutting Unit/Location
Restriction
Purpose

ALL

Operations in Colorado Parks and Wildlife (CPW)-mapped elk production habitat shall not occur from May 15th to June 30th without line officer approval.

Protection of elk production habitat.

NFSR 504

No hauling will be permitted on NFSR 504 over the Labor Day holiday weekend (starting on Friday at 12:00 am and extending through Tuesday at 12:00am).

To prevent conflict with recreationists.

NFSR 504

No hauling will be permitted on NFSR 504 over Memorial Day holiday weekend (starting on Friday at 12:00 am and extending through Tuesday at 12:00am).

To prevent conflict with recreationists.

NFSR 504

No hauling on July 4th and 5th (starting at 12:00 am on July 4th and ending at 12:00 am on July 6th)

To prevent conflict with recreationists.

RO-CT6.411# - FELLING AND BUCKING (SPECIAL OBJECTIVES). (11/98) Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:

Cutting Unit Special Objective

All
Trees shall be felled insofar as reproduction, topography and lean will permit with ends angled toward skid roads or skid trails in the direction of skidding.

To restrict residual tree damage, harvest trees shall be felled, insofar as reproduction, topography, safety and lean will permit, to angle into tractor roads and or skid trails.

Purchaser and Forest Service will agree on felling lead at time of approval of tractor roads.

When soils are saturated, equipment operations will cease until the ground dries out or freezes. Soils are considered saturated when ruts created by equipment are 4.0 inches deep (beyond the lug tread of the tire) for 10.0 feet or longer. Repair any rutting deeper than 4.0 inches.

RO-CT6.42# - SKIDDING AND YARDING (SPECIAL OBJECTIVES). (11/98) Unless otherwise agreed in writing, silvicultural prescriptions and land management objectives shall be conducted and accomplished by the following requirements, methods and procedures:

Cutting Unit(s) or Location
Special Objectives
ALL
Logs should be skidded with leading end free of the ground. Purchaser shall reuse old skid trails and roads to the extent practical. Skid trails should have at a minimum 100.0 feet of spacing between each other.

Trees designated for cutting and/or logs will be left as rub trees as needed to protect young growth and leave trees while skidding.

When soils are saturated, equipment operations will cease until the ground dries out or freezes. Soils are considered saturated when ruts created by equipment are 4.0 inches deep (beyond the lug tread of the tire) for 10.0 feet or longer. Repair any rutting deeper than 4.0 inches.

Avoid mechanical treatments in wetlands, wet meadows and riparian areas. No skidding, decking or loading will be allowed in these areas in order to protect water quality, groundwater hydrology, existing soils and vegetative cover. Removal or mechanical treatment of riparian or wetland vegetation will be prohibited.

Avoid ground skidding on sustained slopes steeper than 40%. Conduct logging to disperse runoff as practicable. Landings and skid trails will be located and designed to disperse runoff and minimize soil disturbance.

Unless agreed to by Forest Service, skid trails will be located perpendicular to slope angles (along the contour) when feasible. Avoid skidding up or down drainage bottoms. As needed, install waterbars or outslope, and spread slash on skid trails upon completion of use.

Segments of the Fivepine-Nortez and Fughes-Sheek soils are present within sale area, as shown on Sale Area Map. Harvest activities, slash piles and temporary roads are allowed through these areas, but no decking or landings are allowed. Purchaser will discuss requirements and limitations with Sale Administrator prior to entering unit.

RO-CT6.6# - EROSION PREVENTION AND CONTROL. (11/98)

A. Purchaser shall locate Temporary Roads on locations approved by the Forest Service. Such location shall include the marking of road centerline or grade-line and the setting of such construction stakes as are necessary to provide a suitable basis for economical construction and the protection of National Forest lands.

B. Skidding with tractors within 100 feet of live streams shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent…