16J_Dawson Runway Pvmt Rehab_Plan Set.pdf
PDF 15 MB Posted
- Solicitation number
- PE-77879-NONST-2025-000000001
- Issued by
- Upson County, Georgia
About this file
The document is a comprehensive set of construction plans for the Runway 14/32 Pavement Rehabilitation Project at Dawson Municipal Airport (16J) in Dawson, Georgia, prepared by Alfred Benesch & Company for the Terrell County Airport Authority. The project involves a full pavement rehabilitation of the runway, including joint and crack repair, a 1-inch crack relief interlayer, and a 2-inch asphalt pavement overlay. The project is scheduled to be issued for bidding in April 2025, with a total construction duration of 69 calendar days divided into three phases. The work includes surface preparation, crack sealing, emulsified asphalt tack coat application, asphalt surfacing, and associated runway markings and signage.
The project is funded through the Georgia Department of Transportation (GDOT), with a project identification number T007948. The total quantities include approximately 2,926 gallons of emulsified asphalt tack coat, 878 tons of crack relief interlayer, 1,756 tons of 2-inch asphalt surface course, and 36,372 linear feet of joint and crack repair. The contractor will be responsible for maintaining airport safety, managing construction phasing, protecting existing infrastructure, and coordinating with airport operations. The project also includes seeding and topsoiling, with 1 acre of seeding and 232 cubic yards of topsoil. The contractor must provide a $5,000,000 vehicle insurance policy and comply with all federal, state, and local airport construction regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16J_Dawson Runway Pvmt Rehab_Bid Booklet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
V E
R S
H E
E T
1 G-1
CALL : 811 FOR LOCATION OF UNDERGROUND
TELEPHONE, ELECTRIC, GAS MAINS, CABLE AND
AIRPORT UTILITIES.
NOTE: EXISTING UNDERGROUND AND OVERHEAD
UTILITIES AND DRAINAGE STRUCTURES HAVE BEEN
PLOTTED FROM AVAILABLE INFORMATION AND
THEREFORE, THEIR LOCATIONS MUST BE
CONSIDERED APPROXIMATE ONLY. IT IS THE
RESPONSIBILITY OF THE INDIVIDUAL CONTRACTORS
TO EXACTLY LOCATE AND PROTECT EACH EXISTING
UTILITY BEFORE AND DURING ACTUAL
CONSTRUCTION.
PRIOR TO CONSTRUCTION:
100% SUBMITTAL
No Scale
VICINITY MAP
DAWSON MUNICIPAL AIRPORT
(16J)
DAWSON, GEORGIA
RUNWAY 14/32 PAVEMENT
REHABILITATION
PROJECT LIMITS
DAWSON
MUNICIPAL
AIRPORT(16J)
GDOT PID: T007948
APXXX-XXXX-XX(XXX)
GA 82
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
TERRELL COUNTY AIRPORT AUTHORITY
MARL HALBROOK - CHAIRMAN
2678 ALBANY HWY
DAWSON, GA 39842
PHONE: (229)-869-8853
EMAIL: BHALBROO@PHOEBEHEALTH.COM
PROJECT DESIGN TEAM:
CIVIL: BENESCH
600 PEACHTREE STREET NE - SUITE 2410
ATLANTA, GEORGIA 30308
706-722-4114
ALL MATERIALS USED SHALL BE IN ACCORDANCE WITH GEORGIA DEPARTMENT OF
TRANSPORTATION, STATE OF GEORGIA, STANDARD SPECIFICATIONS CONSTRUCTION OF
TRANSPORTATION SYSTEMS, 2021 EDITION AND/OR IN ACCORDANCE WITH APPLICABLE FAA
SPECIFICATIONS, OR BY SPECIAL PROVISION.
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
ISSUED FOR BIDDING - APRIL 2025
N O
T F
O R
C O
N S
T R
U C
T
IO
N
G E
N E
R A
L N
O T
E S
IN
D E
X
2 G-2
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
GENERAL NOTES
1. SITE CONDITIONS: CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE SITE AND
SURROUNDING AREAS IN A CLEAN NATURE.
2. SAFETY REQUIREMENTS: THE CONTRACTOR SHALL COMPLETE ALL WORK IN
ACCORDANCE WITH THE FAA ADVISORY CIRCULAR 150/5370-2G, OR CURRENT
VERSION, "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION" AND THE
CSPP DOCUMENTS. THE CONTRACTOR IS ADVISED THAT CERTAIN RULES AND
RESTRICTIONS, AS CONTAINED IN THIS ADVISORY CIRCULAR AND AUGMENTED BY
THESE PLANS AND SPECIFICATIONS, WILL APPLY TO THIS WORK. THE CONTRACTOR
SHALL BECOME FAMILIAR WITH ALL REQUIREMENTS APPLICABLE TO AIRPORT
CONSTRUCTION AND COOPERATE WITH THE ENGINEER AND OWNER IN
MAINTAINING A SAFE CONSTRUCTION SITE WHICH IS COMPATIBLE WITH AIRCRAFT
AND AIRPORT OPERATIONS.
3. CSPP PLAN CHANGES: ANY PROPOSED CHANGES TO THE APPROVED 7460 SHEETS
SHALL BE SUBMITTED AT LEAST 7 CALENDAR DAYS IN ADVANCE OF THE START OF
THE PHASE TO THE ENGINEER FOR REVIEW AND COORDINATION WITH THE OWNER
AND THE AIRPORT. AIRPORT AND OWNER APPROVAL IS REQUIRED PRIOR TO
CHANGING ANY AIRPORT SAFETY FEATURES. CHANGES MAY REQUIRE ADDITIONAL
FAA REVIEW AND DETERMINATION, WHICH CAN TAKE 90-120 DAYS.
4. SAFETY PLAN COMPLIANCE DOCUMENT (SPCD): THE CONTRACTOR SHALL SUBMIT
A SPCD AS DESCRIBED IN ADVISORY CIRCULAR 150/5370-2G (OR CURRENT
VERSION). THIS PLAN SHALL BE SUBMITTED AT LEAST 10 DAYS PRIOR TO THE
PRE-CONSTRUCTION CONFERENCE.
5. CONTRACTOR VEHICLES: ALL CONTRACTOR VEHICLES AND EQUIPMENT OPERATING
ON THE AOA SHALL MEET THE REQUIREMENTS OF THE CSPP DOCUMENTS
INCLUDING, DISPLAY FLASHING AMBER DOME TYPE LIGHT OR ORANGE/WHITE, 3' X
3' MINIMUM CHECKERBOARD FLAG (DAY ONLY).
6. SITE ACCESS: THE CONTRACTOR'S ACCESS TO THE SITE IS LIMITED TO THE
LOCATIONS AS SHOWN ON THE PLANS. ACCESS VIA ANY OTHER ROUTES OR GATES
NOT SHOWN ON THE PLANS WILL REQUIRE PRIOR APPROVAL BY THE
OWNER/AIRPORT.
7. AIRCRAFT TRAFFIC: THE CONTRACTOR IS ADVISED THAT AIRPORT TAXIWAY,
RUNWAY, AND RAMPS WILL BE ACTIVE DURING THIS CONTRACT. CONTRACTOR
WILL BE EXPECTED TO CONDUCT THE WORK SUCH THAT THE SAFETY OF AIRPORT
OPERATIONS IS NOT DEGRADED AND THAT AIRCRAFT FLOW (PER THE CSPP) IS
MAINTAINED WHEN RUNWAY IS OPEN. CONTRACTORS ARE FURTHER ADVISED,
AND SHALL ACCEPT AS AN IMPORTANT CONSIDERATION OF THE WORK, THAT THE
MAINTENANCE OF SAFE AND EFFICIENT AIRCRAFT OPERATIONS IS AN INTEGRAL
PART OF THE WORK. ALL CONSTRUCTION INTERFACE WITH AIRCRAFT PAVEMENTS,
TAXIWAY CROSSINGS, AND SECURITY REQUIREMENTS AS CONTAINED IN FAA
ADVISORY CIRCULAR 150/5370-2 (LATEST ADDITION) WILL APPLY.
8. AIRCRAFT MOVEMENT AREAS: NO VEHICLES ARE GIVEN CLEARANCE TO CROSS A
RUNWAY, TAXIWAY, OR ANY OTHER AREA OPEN TO AIRPORT OPERATIONS
(MOVEMENT AREA). ANY WORK REQUIRING ACCESS TO OR ADJACENT TO A
MOVEMENT AREA MUST BE COORDINATED IN ADVANCE WITH THE TERRELL
COUNTY AIRPORT AUTHORITY.
9. RADIO MONITORING: WHILE THE CONTRACTOR IS NOT REQUIRED TO MONITOR
LOCAL AIRCRAFT RADIO COMMUNICATIONS DURING WORK FOR THIS PROJECT, IT
IS HIGHLY RECOMMENDED AS PRESCRIBED IN AC 150/5370-2G 2-9.2.9.
10. EMERGENCY ACCESS: CONTRACTOR SHALL COORDINATE HIS/HER ACTIVITIES
THROUGHOUT THE PROJECT IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO
ALL RUNWAYS, TAXIWAY, APRONS, AND BUILDING FACILITIES AT ALL TIMES
WITHOUT DELAY TO EMERGENCY VEHICLES RESPONSE TIME.
11. GATE: CONTRACTOR SHALL SECURE GATES WHEN NOT IN USE.
12. CONSTRUCTION EQUIPMENT NEAR RUNWAY: RUNWAY SHALL BE CLOSED WHEN
WORK IS BEING PERFORMED NEAR RUNWAYS OR RUNWAY CRITICAL AREAS. NO
CONTRACTOR EQUIPMENT SHALL BE PERMITTED WITHIN THE RUNWAY SAFETY
AREA WHEN WORKING ON TAXIWAY 'A' OR 'B'.
13. CONSTRUCTION EQUIPMENT NEAR TAXIWAYS: NO CONTRACTOR EQUIPMENT
SHALL BE PERMITTED WITHIN 44.5' FROM THE CENTERLINE OF A TAXIWAY WHILE
THE TAXIWAY IS ACTIVE.
14. CONSTRUCTION EQUIPMENT NEAR AIRCRAFT OPERATIONS: CONSTRUCTION
EQUIPMENT SHALL REMAIN WITHIN THE STAGING AREA AS SHOWN ON THE PLANS
WHEN NOT IN USE.
15. FOD & PAVEMENT CLEANING BROOM: CAUTION SHALL BE TAKEN BY THE
CONTRACTOR IN PREVENTING ANY DUST, MUD OR OTHER FOREIGN OBJECTS AND
DEBRIS (FOD) WHICH MAY BECOME A HAZARD TO AIR AND GROUND OPERATIONS.
THE CONTRACTOR SHALL CONTROL DUST, MUD AND FOD AT ALL TIMES AND MAY
REQUIRE FULL TIME OPERATION OF WATER TRUCKS OR SWEEPERS. THE
CONTRACTOR SHALL MAINTAIN A FULLY FUNCTIONAL STREET BROOM (BROCE
350-96" BROOM, VIRNIG 96" BOBCAT ATTACHMENT ANGLE BROOM, OR
APPROVED EQUAL) ON SITE AND AVAILABLE AT ALL TIMES TO CLEAN ALL
PAVEMENT BEFORE ANY PAVEMENT IS OPEN TO AIRCRAFT, NO SEPARATE
MEASUREMENT OR PAYMENT FOR CLEANING. INCLUDE IN OVERALL COST OF
PROJECT. CLEANING EQUIPMENT SHALL STAY ON PAVEMENTS, AT ALL TIMES, TO
ENSURE MUD AND OTHER DEBRIS ARE NOT DEPOSITED ON WHEELS OF
EQUIPMENT TO BE UTILIZED FOR CLEANING PAVEMENTS. THE SWEEPER SHALL BE
OPERATED DAILY TO KEEP ALL PAVEMENTS TRAVERSED BY THE CONTRACTOR
EQUIPMENT CLEAN OF FOD. AT THE CONCLUSION OF EACH DAYS WORK PERIOD
ALL PAVEMENTS WILL BE INSPECTED BY THE RPR FOR FOD BEFORE THE
CONTRACTOR WILL BE ALLOWED TO LEAVE THE JOB SITE. IF, IN THE OPINION OF
THE AIRPORT OR THE RPR, DUST, MUD, OR FOD IS NOT BEING CONTROLLED, THEY
MAY SUSPEND WORK AND MAKE NECESSARY ARRANGEMENTS FOR DUST OR MUD
CONTROL.
16. CONTRACTOR CONSTRUCTION SCHEDULE: THE CONTRACTOR SHALL SUBMIT A
TWO WEEK ROLLING SCHEDULE FOR DAILY WORK. THE SCHEDULE MUST BE
REVIEWED BY THE ENGINEER AND OWNER PRIOR TO THE START OF WORK. IF
SCHEDULE REVISIONS ARE REQUIRED, AT LEAST 72 HOURS ADVANCE NOTICE TO
THE ENGINEER AND OWNER IS REQUIRED FOR APPROVAL. DUE TO WEATHER,
WIND DIRECTION, OR UNFORESEEN EMERGENCIES, THE CONTRACTOR MAY BE
REQUIRED TO VACATE ANY GIVEN AREA AT SHORT NOTICE.
17. WORKING HOURS: CONTRACTOR MAY PERFORM WORK OPERATIONS FROM DAWN
TO DUSK.
18. NIGHT WORK: NO NIGHT WORK SHALL BE PERFORMED DURING THE
CONSTRUCTION OF THIS PROJECT.
19. CALENDAR DAY VIOLATIONS: THE CONTRACTOR AND SUBCONTRACTOR(S) SHALL
PERFORM WORK IN A TIMELY MANNER AS AGREED TO WITH OWNER. AS AGREED
UPON, LIQUIDATED DAMAGES FOR THE TOTAL PROJECT ARE TO BE $500/
CALENDAR DAY FOR PHASES 1 AND 2, AND $1,000/CALENDAR DAY FOR PHASE 3.
THE ALLOWED CONSTRUCTION TIME IS TO BE 69 CALENDAR DAYS.
20. QUALITY CONTROL PLAN: THE CONTRACTOR IS NOT REQUIRED TO PRESENT A
QUALITY CONTROL PLAN FOR THE PROJECT; HOWEVER, IT IS STRONGLY
ENCOURAGED IN THE EVENT OF QUALITY ASSURANCE DIFFERENCES.
21. EXISTING INFRASTRUCTURE DAMAGE AND PHOTO LOG: THE CONTRACTOR SHALL
PROTECT EXISTING INFRASTRUCTURE AND EQUIPMENT WHICH IS NOT
DESIGNATED FOR DISPOSAL. THE CONTRACTOR, AT NO COST TO THE OWNER
AND/OR AIRPORT, SHALL REPAIR ANY DAMAGE TO EXISTING PAVEMENT, TURF,
CABLES, UTILITIES AND INCIDENTALS THAT ARE DUE TO THE CONTRACTORS
OPERATIONS. PRIOR TO ANY CONSTRUCTION OR HAULING ACTIVITIES, THE
CONTRACTOR SHALL MAKE A PHOTO/VIDEO LOG OF EXISTING CONDITIONS OF ALL
EXISTING PAVEMENTS, TURF, UTILITIES, ETC. THAT MAY BE AFFECTED BY THE
CONTRACTOR'S OPERATIONS. LOADED TRUCKS SHALL HAVE WEIGHT LIMITS TO
PROTECT EXISTING PAVEMENTS. ANY CONTRACTOR CLAIMS STATING DAMAGE
WAS PRE-EXISTING PRIOR TO THE START OF CONSTRUCTION MUST BE SUPPORTED
WITH CONTRACTOR PHOTOS FROM THEIR PHOTO LOG. ALL PHOTOS MUST BE
DATE STAMPED AND OF AN ADEQUATE QUALITY TO DETERMINE PRE-EXISTING
CONDITIONS.
22. SURVEY REQUIREMENTS & CONSTRUCTION STAKING: THE CONTRACTOR SHALL
PROVIDE ALL SURVEY CONTROL, ELEVATIONS, EXISTING GRADES AND ETC. PRIOR
TO BEGINNING CONSTRUCTION. ANY DISCREPANCIES EXCEEDING SIX INCHES
FROM ELEVATIONS ON PLANS SHALL BE REPORTED TO THE RPR PRIOR TO
BEGINNING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL
CONSTRUCTION STAKING AS DESCRIBED ON THE PLANS AND IN THE
SPECIFICATIONS, WHERE APPLICABLE.
23. PERMITS/LICENSES/INSPECTIONS: ALL PERMITS, LICENSES, INSPECTIONS AND
ARRANGEMENTS REQUIRED FOR THE WORK UNDER THE CONTRACT SHALL BE
OBTAINED BY THE CONTRACTOR AT THEIR EXPENSE AND INCLUDED IN THE COST
OF THE PROJECT. ANY ELECTRICAL WORK REQUIRED BY THE PROJECT SHALL MEET
THE CURRENT FEDERAL, STATE AND LOCAL ELECTRICAL CODES AS APPLICABLE. THE
CONTRACTOR SHALL FAMILIARIZE THEMSELVES AND ARRANGE TO COMPLY WITH
ALL REQUIREMENTS AS TO PERMITS, FEES, CODES AND ORDINANCES, ETC.
24. TEMPORARY CONSTRUCTION EQUIPMENT, HEIGHT, HEIGHT RESTRICTIONS:
OWNER/AIRPORT TO ISSUE PROPER NOTAMS AND 7460-1 FORMS FOR
TEMPORARY WORK AREAS FOR AN EQUIPMENT /WORK AREA HEIGHT OF 25 FEET,
INCLUDING WORK IN THE AIRSPACE. ALL CONSTRUCTION EQUIPMENT
ANTICIPATED TO BE GREATER THAN 25 FEET IN HEIGHT (SUCH AS CRANES,
CONCRETE PUMPS, ETC.), SHALL NOT BE USED UNLESS AN FAA FORM 7460-1
DETERMINATION LETTER HAS BEEN ISSUED FOR SUCH EQUIPMENT. REFERENCE
THE 7460 SHEETS AND CONTRACT DOCUMENTS. CONTRACTOR SHALL SUBMIT TO
ENGINEER EQUIPMENT MAXIMUM EXTENSION HEIGHT FOR EQUIPMENT TO BE
USED AFTER THE CONTRACT IS EXECUTED.
25. FAA EQUIPMENT: NO FAA CABLE LOCATES AND/OR EQUIPMENT RELOCATION IS
REQUIRED FOR THIS PROJECT. ENGINEER WILL COORDINATE WITH FAA FOR
ADDITIONAL SUBMITTALS AND APPROVAL.
26. RUNWAY/TAXIWAY LIGHTING AND SIGNAGE: CONTRACTOR TO COVER TAXIWAY
LIGHTS AND APPLICABLE SIGNAGE DURING PHASE I AND II WHEN TAXIWAY 'A' AND
TAXIWAY 'B' ARE TO BE CLOSED. AIRFIELD TO BE CLOSED DURING RUNWAY WORK
AND ALL LIGHTING AND SIGNAGE TO BE TURNED OFF.
27. UTILITIES: NO TOPOGRAPHIC SURVEY DEPICTING EXISTING CONDITIONS WAS
PROVIDED AS PART OF THESE PLANS. AERIAL INFORMATION WAS USED AND MAY
NOT INCLUDE ALL UTILITIES, UNDERGROUND STRUCTURES, OR EXISTING FEATURES
AT THE SITE. CONTRACTOR MUST CONTACT 811 AND/OR A PRIVATE UTILITY
LOCATE BEFORE START OF CONSTRUCTION AND, UNLESS OTHERWISE SPECIFIED,
MAINTAIN ALL UTILITY LINES IN OPERATION. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO PERFORM INSPECTION AND UTILITY LOCATIONS SERVICES,
INCLUDING PRIVATE UTILITY LOCATE, BEFORE DISTURBING THE SITE. ANY
DAMAGES TO EXISTING UTILITIES, STRUCTURES, SURVEY MONUMENTS OR
FEATURES THAT ARE TO REMAIN, INCLUDING THOSE NOT SHOWN ON THE PLANS,
SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL
EXERCISE EXTREME CAUTION WHEN EXCAVATING IN AREAS OF EXISTING UTILITIES.
THE CONTRACTOR SHALL MARK EXISTING UTILITIES IN ADVANCE OF EXCAVATION
IN ALL AREAS. THE LOCATION OF ANY UTILITIES SHOWN ON THE PLANS IS
APPROXIMATE ONLY, AND DEPTHS MAY NOT BE KNOWN. THE CONTRACTOR MAY
BE REQUIRED TO HAND DIG IN AREAS WHERE EXACT UTILITY LOCATIONS ARE NOT
KNOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING AND/OR
REPAIRING DAMAGE TO ALL UTILITIES AND AIRPORT PROPERTY CAUSED BY ITS
OPERATIONS AND/OR THE SUBCONTRACTOR'S OPERATIONS. STAGING AREAS MAY
OR MAY NOT HAVE UTILITIES. ANY UTILITIES REQUIRED BY THE CONTRACTOR
SHALL BE COORDINATED WITH THE UTILITY COMPANIES AND SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
28. STAGING AREAS, STOCKPILES, AND HAUL ROADS: LOCATIONS OF STAGING AREAS,
STOCKPILES, AND HAUL ROADS SHALL BE AS SHOWN ON THE PLANS, UNLESS
OTHERWISE APPROVED BY THE OWNER/AIRPORT. ALL STAGING AREA
PREPARATION AND RESTORATION WORK FOR THE STAGING AND STOCKPILE AREAS
SHALL BE IN THE OVERALL PROJECT COST. CONTRACTOR CONSTRUCTION
EQUIPMENT SHALL BE STORED IN THE DESIGNATED CONTRACTOR'S OPERATIONS
AND STORAGE AREA. ALL EQUIPMENT SHALL BE RETURNED TO THE CONTRACTORS
STAGING AREA AT THE END OF EACH WORK DAY AND LOWERED TO ITS LOWEST
POSITION POSSIBLE.
29. SPECIFICATIONS: ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS OR, IF NOT ADDRESSED IN THE PROJECT SPECIFICATIONS,
THE LATEST EDITION OF STANDARD SPECIFICATIONS FOR THE GDOT AND/OR FAA
30. SANITARY PROVISIONS: CONTRACTOR SHALL PROVIDE TEMPORARY ON-SITE
TOILET FACILITIES AT ALL TIMES, AS REQUIRED FOR CONSTRUCTION PERSONNEL.
31. PAY ITEMS: THE PROJECT PAY ITEMS PROVIDED ARE TO BE INCLUSIVE OF ALL
WORK TO BE PERFORMED AS SHOWN IN THESE PLANS. ALL WORK NOT IDENTIFIED
WITH A SPECIFIC PAY ITEM IS TO BE CONSIDERED REQUIRED/INCIDENTAL WORK TO
COMPLETE THE PROJECT AND IS TO BE INCLUDED IN THE COST OF PROJECT PAY
ITEMS PROVIDED.
32. SHOP DRAWINGS: COMPLETE SHOP DRAWINGS ARE REQUIRED FOR ALL
MATERIALS PROPOSED TO BE INCORPORATED IN THE WORK. DRAWINGS AND
LISTING SHALL BE SUBMITTED IMMEDIATELY AFTER THE CONTRACT IN EXECUTED.
NO EQUIPMENT OR MATERIALS SHALL BE INCORPORATED INTO THE WORK UNTIL
REVIEWED BY THE ENGINEER. PER GENERAL PROVISIONS SECTION 60-01, ALONG
WITH ALL SHOP DRAWING SUBMITTALS THE CONTRACTOR SHALL SUBMIT A
"CONTRACTOR SHOP DRAWING COVER PAGE". THE CONTRACTOR MAY
'HAND-WRITE' IN THE REQUIRED INFORMATION. THE ENGINEER WILL NOT REVIEW
SHOP DRAWING SUBMITTALS THAT ARE NOT ACCOMPANIED WITH THE SHOP
DRAWING COVER PAGE
33. AVAILABILITY OF MATERIALS: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
MAKE ALL ARRANGEMENTS PERTINENT TO THE ACQUISITION, PURCHASE, AND
DELIVERY OF ALL MATERIALS TO BE USED IN THE CONSTRUCTION.
34. MATERIAL REFERENCES: REFERENCES IN THESE PLANS AND SPECIFICATIONS TO
ANY MATERIAL OR METHOD OF CONSTRUCTION BY PROPRIETARY NAME, MAKE,
OR CATALOG NUMBER IS DONE TO ESTABLISH A STANDARD OF QUALITY AND NOT
TO LIMIT COMPETITION. THE CONTRACTOR MAY, AT HIS/HER OPTION, USE ANY
OTHER MATERIAL, SYSTEM, OR METHOD OF CONSTRUCTION, WHICH IN THE
JUDGEMENT OF THE ENGINEER, EXPRESSED IN WRITING, IS EQUAL TO THAT
NAMED. TO RECEIVE CONSIDERATION OF SUBSTITUTION, FULL INFORMATION
MUST BE FURNISHED TO ENSURE THAT NO REDESIGN OF THE PROJECT WILL BE
NECESSARY.
35. CONSTRUCTION VEHICLES ON PAVEMENT TO REMAIN: ONLY APPROVED
RUBBER-TIRED CONSTRUCTION EQUIPMENT WILL BE PERMITTED ON AIRFIELD
PAVEMENTS THAT ARE TO REMAIN. SHOULD THE CONTRACTOR DAMAGE ANY
EXISTING PAVEMENT THAT IS TO REMAIN, THE CONTRACTOR SHALL REPLACE THE
PAVEMENT AT NO EXPENSE TO THE OWNER. CONTRACTOR INSURANCE POLICY
SHALL COVER $5,000,000 IN VEHICLE COVERAGE.
36. REMOVAL ITEMS: ALL ITEMS DESIGNATED FOR REMOVAL SHALL BECOME THE
PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE NOTED. CONTRACTOR SHALL
BE RESPONSIBLE FOR COMPLYING WITH STATE AND FEDERAL DISPOSAL
REQUIREMENTS. IF APPLICABLE, THE CONTRACTOR SHALL REFLECT SALVAGE
VALUES IN THEIR BID.
37. AIRPORT PAVEMENTS: ANY PAVEMENT UTILIZED BY THE CONTRACTOR FOR HAUL
ROUTES SHALL BE RESTORED (I.E. REPAIR DAMAGE, ADD ROCK SURFACING,
TOUCH-UP MARKINGS, ETC.) TO THEIR ORIGINAL CONDITION AT THE COMPLETION
OF THE PROJECT. THE CONTRACTOR SHALL CLEAN ALL AIRPORT PAVEMENT(S)
AFFECTED BY CONSTRUCTION OPERATIONS.
38. SITE RESTORATION: ALL TEMPORARY FACILITIES, INCLUDING BUT NOT LIMITED TO,
STAGING AREAS, STOCKPILES, HAUL ROADS, AND PARKING SHALL BE COMPLETELY
REMOVED FROM THE SITE AT THE COMPLETION OF THE PROJECT AND DISTURBED
AREAS OF THE SITE SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR
BETTER. IF AREAS ARE LOCATED ON EXISTING TURF, AND AGGREGATE IS USED TO
PROVIDE ALL WEATHER CONDITIONS, THE AGGREGATE SHALL BE REMOVED AND
TOPSOIL PLACED. ADDITIONAL TOPSOIL SHALL BE IMPORTED AS NEEDED TO
PROVIDE AN ADEQUATE SEED BED. TURF DAMAGE SHALL BE FINE GRADED (TO
PROVIDE POSITIVE DRAINAGE), SEEDED, MULCHED, AND FERTILIZED IN
ACCORDANCE WITH CONSTRUCTION SPECIFICATIONS. SEEDING AND MULCHING
SHALL BE PAID FOR AS A PORTION OF THE TOTAL PROJECT COST.
39. CSPP VIOLATIONS: THE CONTRACTOR AND SUBCONTRACTOR(S) PERSONNEL SHALL
REMAIN IN WORK AREA LIMITS. THE PENALTY FOR NON-COMPLIANCE WITH
SAFETY PLAN PROVISIONS WILL RESULT IN THE FOLLOWING FOR EACH PERSONNEL:
A. 1ST OFFENSE: WARNING
B. 2ND OFFENSE: $500 FINE
C. 3RD OFFENSE: $1,000 FINE
D. 4TH OFFENSE: REMOVAL FROM PROJECT
TERRELL COUNTY AIRPORT AUTHORITY GENERAL NOTES:
1. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE
GENERAL NATURE OF ORIGINAL CONDITIONS IN THE VICINITY OF THE PROPOSED
CONSTRUCTION AREA PRIOR TO BIDDING.
2. THE CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, AND
TRANSPORTATION NECESSARY TO CONSTRUCT ALL ELEMENTS OF THIS PROJECT AS
DESCRIBED IN THE CONSTRUCTION PLANS AND SPECIFICATIONS. THE PROJECT PAY
ITEMS ARE INTENDED TO BE INCLUSIVE OF ALL WORK TO BE PERFORMED AS SHOWN
IN THESE PLANS. ALL INCIDENTAL WORK TO COMPLETE THE PROJECT SHALL BE
INCLUDED IN THE COST OF PERFORMING THE VARIOUS ITEMS OF WORK.
3. THE CONTRACTOR SHALL PROTECT-IN-PLACE ALL FEATURES LOCATED WITHIN THE
CONSTRUCTION AREAS, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL DIMENSIONS IN THE FIELD
AND, IN THE EVENT OF DISCREPANCY, REPORT SUCH DISCREPANCY TO THE
ENGINEER.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH NATIONAL
POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PREVENTION PLAN
(SWPPP) FOR CONSTRUCTION ACTIVITIES, IF APPLICABLE.
6. ANY WORK PERFORMED WITHOUT WRITTEN APPROVAL OF THE ENGINEER AND/OR
ALL WORK AND MATERIAL NOT IN CONFORMANCE WITH THE PLANS AND
SPECIFICATIONS IS SUBJECT TO REMOVAL AND REPLACEMENT AT CONTRACTOR'S
EXPENSE.
PROJECT SCOPE:
1. THE INTENT OF THIS PROJECT IS TO
PERFORM JOINT AND CRACK REPAIR,
FOLLOWED BY PAVING OF A CRACK RELIEF
INTERLAYER (1 INCH) AND ASPHALT
PAVEMENT OVERLAY (2 INCHES).
2. PLAN AND PROFILE SHOWN ON PLANS
ARE FOR REFERENCE ONLY. CONTRACTOR
TO SURVEY EXISTING RUNWAY AND
TAXIWAYS AND SUBMIT TO ENGINEER
FOR VERIFICATION PRIOR TO BEGINNING
WORK.
3. FINAL RUNWAY AND TAXIWAY
ELEVATIONS SHALL BE APPROXIMATELY
3" HIGHER THAN EXISTING CENTERLINE
ELEVATIONS, EXCEPT WHERE TYING INTO
EXISTING APRON. CONTRACTOR TO
SURVEY EXISTING ELEVATIONS AT TIE IN
AND PROVIDE TO ENGINEER PRIOR TO
BEGINNING WORK. CONTRACTOR TO
SURVEY FINAL ELEVATIONS AND PROVIDE
TO ENGINEER. COST TO BE INCLUDED
UNDER "SITE PREPARATION AND
MOBILIZATION".
SHEET LIST TABLE
SHEET NO. DRAWING NO. SHEET TITLE
GENERAL (G)
1 G-1 COVER SHEET
2 G-2 GENERAL NOTES & INDEX
3 G-3 GENERAL LEGEND & SUMMARY OF QUANTITIES
4 G-4 PROJECT CONTROL PLAN
5 G-5 BORE LOGS - SHEET 1
6 G-6 BORE LOGS - SHEET 2
CONST. SAFETY & PHASING PLANS (CSPP)
7 CSPP-1 CONSTRUCTION SAFETY PHASING PLAN - PHASE I & II
8 CSPP-2 CONSTRUCTION SAFETY PHASING PLAN - PHASE III
9 CSPP-3 CONSTRUCTION SAFETY & PHASING PLAN - DETAILS
10 CSPP-4 CONSTRUCTION SAFETY & PHASING PLAN - NOTES SHEET 1
11 CSPP-5 CONSTRUCTION SAFETY & PHASING PLAN - NOTES SHEET 2
EXISTING CONDITIONS & REMOVALS (XR)
12 XR-1 EXISTING CONDITIONS & REMOVALS - SHEET 1
13 XR-2 EXISTING CONDITIONS & REMOVALS - SHEET 2
14 XR-3 EXISTING CONDITIONS & REMOVALS- SHEET 3
15 XR-4 EXISTING CONDITIONS PHOTOS
PAVING (P)
16 P-1 PAVING PLAN - SHEET 1
17 P-2 PAVING PLAN - SHEET 2
18 P-3 PAVING PLAN - SHEET 3
19 P-4 TYPICAL SECTIONS
MARKING (M)
20 M-1 MARKING PLAN - SHEET 1
21 M-2 MARKING PLAN - SHEET 2
22 M-3 MARKING DETAILS
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
GENERAL LEGEND
Construction Note
Existing Aircraft Tiedown
Existing Guardpost/Bollard
Existing Road Sign
Existing Storm Sewer Inlet
Existing Storm Sewer Manhole
Existing Monitoring Well
Existing Electrical Handhole
Existing Electrical Pullbox
Existing Electrical Pedestal
Existing Light Pole
Existing Duct Marker
NOTE: Sheets With Legends Supplement The General Legend
C-1
X X
SD
TEL
PL
ST
UGE
W
SAN
GAS
Existing Water Manhole
Existing Water Hydrant
Existing Water Valve
Existing Sanitary Sewer Cleanout
Existing Sanitary Sewer Manhole
Existing Gas Meter
Existing Gas Valve
Existing Telephone Manhole
Existing Telephone Pedestal
Control Point
Pavement Bore Locations
Existing Lease Line
Existing Fence Line
Existing Storm Sewer
Existing Sub-Drain
Existing Underground Electrical Line
Existing Water Line
Existing Sanitary Line
Existing Gas Line
Existing Telephone Line
Existing Contours
Photo Location Callout
320.0
G E
N E
R A
L
L
E G
E N
D
S U
M M
A R
Y
O
F
Q U
A N
T I T
I E
S
G-3
N O
R
E V
I S
I O
N S
D A
T E
A l f r e d
B e n e s c h o m p a n y
P e a c h t r e e
S t r e e t
N
E
S u i t e
A t l a n t a
G e o r g i a
D A
W S
M
U N
I C
I P
A L
A I R
P O
R T
J
D A
W S
O N
G
E O
R G
I A
J o b
N o
ABBREVIATIONS
AOA
AC
APPROX
ARFF
ASTM
AWOS
AWWA
BOC
BLDG
BM
C&G
CB
CF
CFS
CI
CL
CMP
CO
CONC
CY
16J
DDI
DI
DIA
DIP
DOT
DWCB
DWG
E
EOP
ELEV
EQUIP
ESMT
EX/EXIST
FAA
FES
FF OR FFE
FH
FM
FOD
FT
G
GAL
GI
HDPE
HH
HORZ
HP
HW
HYD
ID
IE
IN
INV
IPF
IPS
JB
L
LF
LP
M
MAX
MECH
MES
MH
MIN
MM
MON
MUTCD
N
N/A
NTS
OC
OD
PC
PCC
POB
PSI
PT
PVC
PVMT
R
R/W
RCP
RD
REINF
ROFA
ROFZ
RSA
S
ST
SF
SS
SSMH
STA
STD
STRUC
SWPPP
TBM
TEMP
TOFA
TOS
TSA
TWY
TYP
VERT
W/
WM
WV
WWF
AND
AT
AIRPORT OPERATIONS AREA
ACRES
APPROXIMATE
AIRCRAFT RESCUE AND FIREFIGHTING
AMERICAN SOCIETY FOR TESTING OF MATERIALS
AUTOMATED WEATHER OBSERVING SYSTEM
AMERICAN WATER WORKS ASSOCIATION
BACK OF CURB
BUILDING
BENCHMARK
CURB AND GUTTER
CATCH BASIN
CUBIC FEET
CUBIC FEET PER SECOND
CAST IRON
CENTERLINE
CORRUGATED METAL PIPE
CLEAN OUT
CONCRETE
CUBIC YARDS
DAWSON MUNICIPAL AIRPORT
DRAINAGE DROP INLET
DROP INLET
DIAMETER
DUCTILE IRON PIPE
DEPARTMENT OF TRANSPORTATION
DOUBLE WING CATCH BASIN
DRAWING
EASTING
EDGE OF PAVEMENT
ELEVATION
EQUIPMENT
EASEMENT
EXISTING
FEDERAL AVIATION ADMINISTRATION
FLARED END SECTION
FINISHED FLOOR ELEVATION
FIRE HYDRANT
FORCE MAIN
FOREIGN OBJECT DEBRIS
FEET
GAS
GALLON
GRATE INLET
HIGH-DENSITY POLYETHYLENE
HAND HOLE
HORIZONTAL
HIGH POINT / DRAINAGE DIVIDE
HEADWALL
HYDRANT
INSIDE DIAMETER
INVERT ELEVATION
INCH
INVERT
IRON PIN FOUND
IRON PIN SET
JUNCTION BOX
LENGTH
LINEAR FEET
LIGHT POLE
METER
MAXIMUM
MECHANICAL
MITERED END SECTION
MANHOLE
MINIMUM
MILLIMETER
MONUMENT
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
NORTHING
NOT APPLICABLE
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
POINT OF CURVATURE
PORTLAND CEMENT CONCRETE
POINT OF BEGINNING
POUND PER SQUARE INCH
POINT OF TANGENCY
POLYVINYL CHLORIDE
PAVEMENT
RADIUS
RIGHT-OF-WAY
REINFORCED CONCRETE PIPE
ROOF DRAIN
REINFORCED
RUNWAY OBJECT FREE AREA
RUNWAY OBJECT FREE ZONE
RUNWAY SAFETY AREA
SOUTH
STORM SEWER
SQUARE FEET
SANITARY SEWER
SANITARY MANHOLE
STATION
STANDARD
STRUCTURE
STORM WATER POLLUTION PREVENTION PLAN
TEMPORARY BENCHMARK
TEMPORARY
TAXIWAY OBJECT FREE AREA
TOP OF SLAB
TAXIWAY SAFETY AREA
TAXIWAY
TYPICAL
VERTICAL
WITH
WATER METER
WATER VALVE
WELDED WIRE FABRIC
2/23/24
GDOT 400
3/
/2
G
D O
T A
S P
H A
LT
2" THICK 12.5MM SUPERPAVE ASPHALT SURFACE COURSE
N O
T F
O R
C O
N S
T R
U C
T
C-1 C-2 C-3 C-4
C-5 C-6
C-7 C-8
C-9 C-10
9+
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
L1
ALIGNMENT CONTROL
NUMBER
L1
ALIGNMENT
RW 14-32 CL Alignment
BEGIN STATION
9+50.19
END STATION
57+00.00
BEGIN
COORDINATES
N: 635733.70 E: 2216269.71
END
COORDINATES
N: 632556.49 E: 2219800.43
P R
O
JE
C T
C O
N T
R O
L P
LA
N
4 G-4
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
BORING LOG SECTIONS*
BORING
NO.
ACC THICK.
(IN.)
PCC THICK.
(IN.)
BASE THICK.
(IN)
C-1 2.5" - 6.0"
C-2 2.5" - 6.0"
C-3 4.5" - 6.0"
C-4 2.75" - 6.0"
C-5 4.5" - -
C-6 4.0" - -
C-7 4.0" - -
C-8 4.5" - -
C-9 4.0" - -
C-10 6.0" - -
*REFER TO APPENDICES IN SPECIFICATIONS, AND SHEET
5 (G-5) TO SHEET 6 (G-6) FOR FULL BORE LOGS.
*NOTES:
1. CONTRACTOR TO PROVIDE NEW CONTROL POINTS FOR
THOSE REMOVED DURING CONSTRUCTION. COST TO BE
INCLUDED UNDER ITEM "SITE PREPARATION AND
MOBILIZATION".
2. NO SURVEY HAS BEEN CONDUCTED. CONTROL POINT
DATA TAKEN FROM AIRPORT LAYOUT PLAN DATED
JANUARY 11, 2007. CONTRACTOR TO VERIFY ALL
CONTROL POINTS PRIOR TO CONSTRUCTION AND
SUBMIT IN WRITING TO THE ENGINEER ANY
DISCREPANCIES FROM FAA PUBLISHED END POINTS.
COORDINATE SYSTEM: US STATE PLANE, GEORGIA - WEST ZONE
HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983
VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)
UNITS: UNITED STATES SURVEY FOOT
CONTROL POINT TABLE*
POINT # ELEVATION NORTHING EASTING DESCRIPTION
RUNWAY
14 END 333.2 635636.06 2216377.34 FAA PUBLISHED END OF RUNWAY 14
ARP - 634123.33 2218059.86 AIRPORT REFERENCE POINT
RUNWAY
32 END 288.8 632823.33 2219731.42 FAA PUBLISHED END OF RUNWAY 32
RUNWAY 14/32
NOTES:
1. BORE HOLE LOCATIONS ARE APPROXIMATE. REFER TO
GEOTECHNICAL REPORT.
TERMINAL BUILDING
APRON
T W
'A
T W
'B
TYPICAL T-HANGAR
ALBANY HWY
RUNWAY 14 END
RUNWAY 42 END
ARP
FUEL FACILITY
C-#
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
B
R E
L O
G S
S
H E
E T
5 G-5
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
NOTES
1. SEE SHEET 4 (G-4) FOR OVERALL SITE
PLAN AND BORE LOCATIONS.
2. BORE LOG SHEETS WERE TAKEN
FROM THE STAMPED GEOTECHNICAL
ENGINEERING REPORT BY CONTOUR
ENGINEERING DATED JUNE 15, 2023.
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
R E
L O
G S
S
H E
E T
6 G-6
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
NOTES
1. SEE SHEET 4 (G-4) FOR OVERALL SITE
PLAN AND BORE LOCATIONS.
2. BORE LOG SHEETS WERE TAKEN
FROM THE STAMPED GEOTECHNICAL
ENGINEERING REPORT BY CONTOUR
ENGINEERING DATED JUNE 15, 2023.
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
BC BC
BC BC BC BC BC B
C
B
C BC BC
BC
BC
BC
BC
T-HANGAR
HANGAR
HANGAR
T -H
A N
G A
R
TERMINAL
BLDG.
T -H
A N
G A
R
T -H
A N
G A
R
HANGAR
PHASE 1 WORK AREA
PHASE 2 WORK AREA
AOA CLOSURE
STAGING AREA
COVER TAXIWAY
EDGE LIGHTS
TYPE II BARRICADE
LOCATION
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
RUNWAY OBSTACLE
FREE ZONE
CONTRACTOR HAUL ROUTE
EXISTING PROPERTY LINE
LEGEND
BCBC
PL
RSA
ROFA
ROFZ
HANGAR
T -H
A N
G A
R
C O
N S
T R
U C
T
IO
N S
A
FE
T Y
P H
A S
IN
G
P
LA
N
P H
A S
E I
I
I
7 CSPP-1
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
SAFETY AREA & OBJECT FREE
AREA WIDTH TABLE
EXISTING
PAVEMENT
WIDTH
SAFETY
AREA
WIDTH
OBJECT
FREE AREA
WIDTH
AAC/ADG RUNWAYS
RUNWAY 14/32 A / I 75' 120' 400'
ADG/TDG TAXIWAYS
TAXIWAY A I / 2A 40' 49' 89'
TAXIWAY B I / 2A 35' 49' 89'
PHASE 1 & 2 SAFETY PLAN NOTES
· WORK TO BE COMPLETED:
O SITE PREPARATION AND MOBILIZATION
O INSTALL SAFETY MEASURES
O INSTALL SILT FENCE
O CRACK SEAL/JOINT REPAIRS
O CLEAN EXISTING PAVEMENT
O INSTALL NEW CRACK RELIEF INTERLAYER
O INSTALL NEW ASPHALT PAVEMENT OVERLAY
O PAVEMENT MARKINGS
O CLEAN WORK AREA PAVEMENTS, SITE RESTORATION, REMOVE
FOD AND REMOVE SAFETY MEASURES
· WORK AREA PAVEMENT CLOSURES: REFER TO PLAN VIEW
· AVAILABLE RUNWAY LENGTH(S): FULL LENGTH AVAILABLE
· NAVAIDS: NO NAVAIDS TO BE DEACTIVATED
· LIGHTING, SIGNS AND MARKING: TAXIWAY EDGE LIGHTS AND
SIGNS TO BE PROTECTED AT ALL TIMES. CONTRACTOR TO TAKE
CAUTION WHEN OPERATING NEAR EXISTING TAXIWAY EDGE
LIGHTS. CONTRACTOR TO COVER LIGHTS AND SIGNS.
· NOTAMS: OWNER TO ISSUE PROPER NOTAMS PRIOR TO ANY
WORK BEING INITIATED. REFER TO SECTION 9B OF APPENDIX 2 IN
SPECIFICATIONS FOR NOTAM PROCEDURES. NOTAMS SHALL BE
ISSUED FOR THE FOLLOWING PAVEMENT CLOSURES:
O TAXIWAY 'A'
O TAXIWAY 'B'
· BARRICADE LOCATIONS: REFER TO PLAN VIEW (ESTIMATED 114
TYPE II REQUIRED). BARRICADE DETAILED ON SHEET 9 (CSPP-3).
· ACCESS LOCATION: REFER TO PLAN VIEW AND ACCESS GATE DETAIL
ON THIS SHEET.
· STAGING AREA: REFER TO PLAN VIEW
· HAUL ROUTE: REFER TO PLAN VIEW
· ALLOWED WORK HOURS: MON. - FRI., 7:00 AM - 7:00 PM, UNLESS
OTHERWISE APPROVED BY THE OWNER.
· DURATION OF CLOSURES:
O PHASE 1: 13 CALENDAR DAYS
O PHASE 2:
· LIQUIDATED DAMAGES: $500 PER CALENDAR DAY
· AIRCRAFT TAXI:
O AIRCRAFT TAXI ROUTES DEFINED BY OPEN PAVEMENTS (REFER
TO PLAN VIEW)
· MISCELLANEOUS PHASE NOTES:
1. NO EQUIPMENT SHALL BE ALLOWED BEYOND CONTRACTOR WORK
AREA DEPICTED ON THIS SHEET UNLESS OTHERWISE APPROVED BY
OWNER'S REPRESENTATIVE.
2. ALL SAFETY MEASURES FOR CURRENT PHASE SHALL REMAIN AND
BE MAINTAINED IN PLACE, UNLESS OTHERWISE APPROVED BY
OWNER/OWNER'S REPRESENTATIVE, UNTIL ALL WORK IS
COMPLETE AND NEW FACILITIES ARE TURNED OVER TO OWNER.
3. SILT FENCE SHALL BE INSTALLED PRIOR TO COMMENCING WORK
ASSOCIATED WITH THIS PHASE. SILT FENCE SHALL REMAIN IN PLACE
UNTIL THE PROJECT IS FINISHED AND ALL CLEANUP IS COMPLETE.
4. CONTRACTOR EMPLOYEES SHALL PARK ALL POV'S (PERSONAL
OCCUPANCY VEHICLES) IN STAGING AREAS, TERMINAL PARKING
LOT, OR AREA APPROVED BY OWNER. CONTRACTOR VEHICLES
SHALL BE MARKED WITH LOGOS AND INCLUDE A FLASHING
BEACON WHEN OPERATING INSIDE OF THE AIRFIELD.
5. SOLID CONNECTED BARRICADES SHALL BE PLACED AROUND THE
WORK AREA UNDER CONSTRUCTION AS SHOWN AND MUST
REMAIN UNTIL ALL WORK IS COMPLETE AND THE NEWLY
CONSTRUCTED AREAS ARE FREE FROM FOD.
6. CONTRACTOR TO KEEP ALL PAVEMENT AREAS CLEAN AT ALL TIMES
DURING CONSTRUCTION. PAVEMENT SHALL BE SWEPT TO PREVENT
FOREIGN OBJECT DEBRIS (FOD).
7. NO EQUIPMENT SHALL BE LEFT ON ANY OF THE ACCESS ROAD,
APRON, TAXIWAY OR RUNWAY AREAS AT ANYTIME DURING
CONSTRUCTION UNLESS EQUIPMENT IS CURRENTLY IN USE WITHIN
THE PROJECT CONSTRUCTION LIMITS.
8. AIRCRAFT SHALL EXIT RUNWAY 14/32 ALONG TAXIWAY 'A' DURING
PHASE 1 AND TAXIWAY 'B' DURING PHASE 2.
9. CONTRACTOR TO COVER TAXIWAY LIGHTING AND SIGNAGE
DURING EACH PHASE OF CONSTRUCTION.
10. SILT FENCE SHALL BE UTILIZED AROUND STAGING AREAS. INCLUDED
IN THE COST FOR "SITE PREPARATION AND MOBILIZATION.
11. CONTRACTOR MUST COMPLETE PHASE 1 IN ITS ENTIRETY AND
REOPEN TAXIWAY 'B' PAVEMENT FOR USE PRIOR TO STARTING
PHASE 2.
12. ALL MARKING OBLITERATION AND NEW PAVEMENT MARKING
THAT OCCURS OUTSIDE OF THE DESIGNATED WORK AREAS SHALL
BE COMPLETED BY CONTRACTOR UNDER ESCORT.
60'
125'
TA
XI
W
AY
B
TA
XI
W
AY
A
RUNWAY 14/32
PHASE 1 WORK AREA PHASE 2 WORK AREA
PHASE 1 & 2 SAFETY MEASURES TABLE
LOCATION
TYPE II AIRPORT
BARRICADES (L.F.)
TYPE II AIRPORT
BARRICADES (EA.)
TAXIWAY 'A' NORTH CLOSURE 471 59
TAXIWAY 'A' SOUTH CLOSURE 58 8
TAXIWAY 'B' NORTH CLOSURE 309 39
TAXIWAY 'B' SOUTH CLOSURE 58 8
TOTAL 114
58' 58'
40'
229'
233'
60'
60'
200'
STAGING AREA
(PHASE 1)
60'
STAGING AREA
(PHASE 2)
40'
111'
1'
ACCESS GATE DETAIL
MANUAL SWING GATE
(PHASES 1 AND 3)
MANUAL SWING GATE
(PHASE 2)
SCALE: 1" = 60'
SILT FENCE
(280 L.F.)
SILT FENCE
(80 L.F.)
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
IO
10 CALENDAR DAYS
0'
0'
PHASE 3 WORK AREA
AOA CLOSURE
STAGING AREA
TYPE II BARRICADE
LOCATION
TEMPORARY RUNWAY
CLOSURE X
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
RUNWAY OBSTACLE
FREE ZONE
CONTRACTOR HAUL ROUTE
EXISTING PROPERTY LINE
LEGEND
BCBC
PL
RSA
ROFA
ROFZ
C O
N S
T R
U C
T
IO
N S
A
FE
T Y
P H
A S
IN
G
P
LA
N
P H
A S
E I
II
8 CSPP-2
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
PHASE 3 SAFETY MEASURES TABLE
LOCATION
TYPE II AIRPORT
BARRICADES (L.F.)
TYPE II AIRPORT
BARRICADES (EA.)
TAXIWAY 'A' CLOSURE 65 9
TAXIWAY 'B' CLOSURE 37 5
TOTAL 14
SAFETY AREA & OBJECT FREE
AREA WIDTH TABLE
EXISTING
PAVEMENT
WIDTH
SAFETY
AREA
WIDTH
OBJECT
FREE AREA
WIDTH
AAC/ADG RUNWAYS
RUNWAY 14/32 A / I 75' 120' 400'
ADG/TDG TAXIWAYS
TAXIWAY A I / 2A 40' 49' 89'
TAXIWAY B I / 2A 35' 49' 89'
STAGING AREA
(PHASE 3)
PHASE 3 SAFETY PLAN NOTES
· WORK TO BE COMPLETED:
O SITE PREPARATION AND MOBILIZATION
O INSTALL SAFETY MEASURES
O INSTALL SILT FENCE
O CRACK SEAL/JOINT REPAIRS
O CLEAN EXISTING PAVEMENT
O INSTALL NEW CRACK RELIEF INTERLAYER
O INSTALL NEW ASPHALT PAVEMENT OVERLAY
O PAVEMENT MARKINGS
O CLEAN WORK AREA PAVEMENTS, SITE RESTORATION, REMOVE
FOD AND REMOVE SAFETY MEASURES
· WORK AREA PAVEMENT CLOSURES: REFER TO PLAN VIEW
· AVAILABLE RUNWAY LENGTH(S): RUNWAY CLOSED THIS PHASE.
· NAVAIDS: PAPIS TO BE DEACTIVATED
· LIGHTING, SIGNS AND MARKING: RUNWAY EDGE LIGHTS TO BE
PROTECTED AT ALL TIMES. CONTRACTOR TO TAKE CAUTION WHEN
OPERATING NEAR EXISTING RUNWAY EDGE LIGHTS. CONTRACTOR
TO DEACTIVATE ALL RUNWAY AND TAXIWAY EDGE LIGHTS.
· NOTAMS: OWNER TO ISSUE PROPER NOTAMS PRIOR TO ANY WORK
BEING INITIATED. REFER TO SECTION 9B OF APPENDIX 2 IN
SPECIFICATIONS FOR NOTAM PROCEDURES. NOTAMS SHALL BE
ISSUED FOR THE FOLLOWING PAVEMENT CLOSURES DURING THIS
PHASE:
O RUNWAY 14/32 - FULL AIRFIELD CLOSURE
· BARRICADE LOCATIONS: REFER TO PLAN VIEW (ESTIMATED 14 TYPE
II REQUIRED). BARRICADE DETAILED ON SHEET 9 (CSPP-3).
· ACCESS LOCATION: REFER TO PLAN VIEW.
· STAGING AREA: REFER TO PLAN VIEW
· HAUL ROUTE: REFER TO PLAN VIEW
· ALLOWED WORK HOURS: MON. - FRI., 7:00 AM - 7:00 PM, UNLESS
OTHERWISE APPROVED BY THE OWNER.
· DURATION OF PHASE 3 CLOSURE: 46 CALENDAR DAYS
· LIQUIDATED DAMAGES: $1000 PER CALENDAR DAY
· AIRCRAFT TAXI:
O NONE - AIRFIELD CLOSED
· MISCELLANEOUS PHASE NOTES:
1. NO EQUIPMENT SHALL BE ALLOWED BEYOND CONTRACTOR WORK
AREA DEPICTED ON THIS SHEET UNLESS OTHERWISE APPROVED BY
OWNER'S REPRESENTATIVE.
2. ALL SAFETY MEASURES FOR CURRENT PHASE SHALL REMAIN AND BE
MAINTAINED IN PLACE, UNLESS OTHERWISE APPROVED BY
OWNER/OWNER'S REPRESENTATIVE, UNTIL ALL WORK IS COMPLETE
AND NEW FACILITIES ARE TURNED OVER TO OWNER.
3. SILT FENCE SHALL BE INSTALLED PRIOR TO COMMENCING WORK
ASSOCIATED WITH THIS PHASE. SILT FENCE SHALL REMAIN IN PLACE
UNTIL THE PROJECT IS FINISHED AND ALL CLEANUP IS COMPLETE.
4. CONTRACTOR EMPLOYEES SHALL PARK ALL POV'S (PERSONAL
OCCUPANCY VEHICLES) IN STAGING AREAS, TERMINAL PARKING LOT,
OR AREA APPROVED BY OWNER. CONTRACTOR VEHICLES SHALL BE
MARKED WITH LOGOS AND INCLUDE A FLASHING BEACON WHEN
OPERATING INSIDE OF THE AIRFIELD.
5. SOLID CONNECTED BARRICADES SHALL BE PLACED AROUND THE
WORK AREA UNDER CONSTRUCTION AS SHOWN AND MUST REMAIN
UNTIL ALL WORK IS COMPLETE AND THE NEWLY CONSTRUCTED
AREAS ARE FREE FROM FOD.
6. CONTRACTOR TO KEEP ALL PAVEMENT AREAS CLEAN AT ALL TIMES
DURING CONSTRUCTION. PAVEMENT SHALL BE SWEPT TO PREVENT
FOREIGN OBJECT DEBRIS (FOD).
7. NO EQUIPMENT SHALL BE LEFT ON ANY OF THE ACCESS ROAD,
APRON, TAXIWAY OR RUNWAY AREAS AT ANYTIME DURING
CONSTRUCTION UNLESS EQUIPMENT IS CURRENTLY IN USE WITHIN
THE PROJECT CONSTRUCTION LIMITS.
8. AIRFIELD SHALL BE CLOSED DURING PHASE 3.
9. CONTRACTOR TO INSTALL TWO (2) RUNWAY TEMPORARY FABRIC 'X'
AS SHOWN ON PLANS FOR PHASE 3. REFER TO DETAIL ON SHEET 9
(CSPP-3).
10. ALL AIRFIELD LIGHTING AND SIGNAGE TO BE TURNED OFF DURING
PHASE 3 CONSTRUCTION.
11. ALL MARKING OBLITERATION AND NEW PAVEMENT MARKING THAT
OCCURS OUTSIDE OF THE DESIGNATED WORK AREAS SHALL BE
COMPLETED BY CONTRACTOR UNDER ESCORT.
RUNWAY 14/32
TEMPORARY RUNWAY CLOSURE X
TEMPORARY RUNWAY CLOSURE X
T W
'A
T W
'B
TERMINAL BUILDING
HANGARS
ENLARGEMENT 'A'
ALBANY HWY
MANUAL SWING GATE
(PHASES 1 & 3)
SILT FENCE (280 L.F.)
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
N S
T R
U C
T I O
N
S A
F E
Y
P
H A
S I N
G
P L
A
D
E T
A I L
S
CSPP-3
N O
R
E V
I S
I O
N S
D A
T E
A l f r e d
B e n e s m p a n y
P e a c h t r e e
S t r e e t
N
E
S u i
A t l a n t a
G e o r g
D A
W S
N
I C
I P
A L
A I R
P O
J
D A
W S
O N
G
E O
R G
I A
J o b
N o
TYPE II AIRPORT
BARRICADE DETAIL
No Scale
TYPE II AIRPORT BARRICADE NOTES:
1. CONTRACTOR SHALL FURNISH (128 ESTIMATED) TYPE II
LOW PROFILE PLASTIC WATER FILLED BARRICADES.
BARRICADES SHALL BE RRM SAFETY ORANGE MODEL
4202S0-25 10"X96" UV-RESISTANT POLYETHYLENE LOW
PROFILE PLASTIC AIRPORT BARRICADES MEETING THE
REQUIREMENTS OF AC 150/5370-2 (CURRENT EDITION)
WITH ONE (1) SCREW-IN 601 (360 DEGREE OR 180 DEGREE
BOTH SIDES - ROTATE EVERY OTHER LIGHT 90 DEGREES)
RED FLASHING SOLAR LIGHT AND HIGH INTENSITY
SHEETING ON BOTH SIDES (ORANGE AND WHITE STRIPES)
AS MANUFACTURED BY ROADTECH MANUFACTURING, OAK
PARK, IL (800-880-3073) OR APPROVED EQUAL.
2. CONTRACTOR SHALL FURNISH/PLACE/MAINTAIN/REMOVE
TYPE II BARRICADES AS REQUIRED BY INDIVIDUAL 'PHASES'.
PAID FOR AS "SITE PREPARATION AND MOBILIZATION".
3. ALL BARRICADES SHALL BE CONTINUOUSLY LINKED
TOGETHER AT EACH LOCATION AND FILLED WITH ENOUGH
WATER TO PREVENT THE STRING OF BARRICADES FROM
MOVING FROM WIND OR JET BLAST.
4. CONTRACTOR FURNISHED BARRICADES SHALL REMAIN THE
PROPERTY OF CONTRACTOR UPON COMPLETION OF
PROJECT.
5. ALL BARRICADE LOCATIONS SHALL BE PLACED OUTSIDE OF
ACTIVE RUNWAY RSAS (OR BEHIND HOLDLINES AS
DIRECTED BY THE ENGINEER). OWNER WILL RESOLVE ANY
QUESTIONS REGARDING EXACT PLACEMENT LOCATIONS.
DRILL 2 EACH 12" HOLES
IN BOTTOM FOR AIR
CIRCULATION/DRAINAGE
TYPICAL LIGHT COVER NOTES:
1. CONTRACTOR TO FURNISH, PLACE, AND
REMOVE LIGHT AND SIGN COVERS AS
REQUIRED.
2. CONTRACTOR TO USE PVC COVERS OR
ALUMINUM FOIL.
COVER LIGHTS WITH APPROXIMATELY
6" DIA. PVC PIPE. CONTRACTOR SHALL
VERIFY THE DIA. OF THE PVC TO ALLOW
THE LIGHT TO BE FULLY COVERED.
2" (T
YP
AS REQUIRED TO PROPERLY
COVER, NOT TO EXCEED 30"
TYPICAL LIGHT COVER
No Scale
TEMPORARY 'X' DETAIL
No Scale
RUNWAY AND TAXIWAY TEMPORARY FABRIC "X" NOTES:
1. CONTRACTOR FURNISHED RUNWAY X'S (2 EACH). EACH X SHALL CONSIST
OF TWO (2) PIECES OF FABRIC AS SHOWN IN TEMPORARY X DETAIL. FABRIC
SHALL BE MADE OF YELLOW VINYL COATED MESH. FABRIC SHALL BE
SCREEN GUARD AS MANUFACTURED BY M. PUTTERMAN & CO. INC., 4834
SOUTH OAKLEY, CHICAGO, IL 60609 (1-800-621-0146), OR APPROVED
EQUAL.
2. ALL TEMPORARY X'S SHALL BE FURNISHED BY THE CONTRACTOR AND
SHALL REMAIN THE CONTRACTOR'S PROPERTY UPON COMPLETION OF THE
PROJECT.
3. X'S SHALL BE PLACED AT LOCATIONS DESIGNATED BY THE FIELD
ENGINEER/OWNER AS REQUIRED AND SECURED DOWN WITH WEIGHTED
RUBBER BASE PLATES FROM TYPE I BARRICADES PAINTED AVIATION
YELLOW CONTINUOUS AROUND THE ENTIRE PERIMETER, OR OTHER
OWNER APPROVED MATERIAL (FURNISHED BY CONTRACTOR).
FURNISHING, PLACING, MAINTAINING AND REMOVAL OF TEMPORARY
FABRIC X'S SHALL BE INCLUDED IN "SITE PREPARATION AND
MOBILIZATION".
YELLOW
25' RW
60' RW
RUNWAY CL
10' RW
25' R
W
10' R W
60' R W
2/23/24
3/
/2
G
D O
T A
S P
H A
LT
N O
T F
O R
C O
N S
T R
U C
T
N S
T R
U C
T
IO
N S
A
FE
T Y
P
H A
S
IN
G P
LA
N
N
O T
E S
S H
E E
T
10 CSPP-4
NO
RE
VI
SI
ON
S
DA
TE
Al fre d Be ne sc h
C om pa ny
Pe ac ht re e St re et
N E, S ui te
At la nt a, G eo rg ia
6-
2-
DA
W
SO
N
M
UN
IC
IP
AL
AI
RP
OR
T (1
6J
DA
W
SO
N, G
EO
RG
IA
Jo b
N o.
5.
CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)
THIS CSPP WAS PREPARED IN ACCORDANCE WITH FAA ADVISORY CIRCULAR (AC)
150/5370-2G "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION" (DATED
12/13/2017). THE NUMBERED ITEMS BELOW FOLLOW THE LIST CONTAINED IN AC
150/5370-2G SECTION 2.4. THE CONTRACTOR SHALL COMPLY WITH ALL CONTRACT
SAFETY REQUIREMENTS, OWNER'S SECURITY PROGRAM REQUIREMENTS, OSHA SAFETY
REQUIREMENTS, AND OTHER LOCAL/STATE/FEDERAL LAWS GOVERNING THE SAFETY OF
WORK AND THE GENERAL PUBLIC.
ANY CONTRACTOR CHANGES TO THE BELOW CSPP DOCUMENT (INCLUDING DRAWINGS)
MUST BE COORDINATED WITH THE OWNER PRIOR TO IMPLEMENTATION.
SAFETY PLAN COMPLIANCE DOCUMENT (BY CONTRACTOR)
IN ACCORDANCE WITH AC 150/5370-2G, SECTION 1.4.3, THE CONTRACTOR SHALL
PREPARE AND SUBMIT TO THE OWNER A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD)
FOR REVIEW BY THE OWNER. A SAMPLE SPCD IS INCLUDED IN APPENDIX 3 OF THE
SPECIFICATION BOOKLET. THE SAMPLE SPCD IS INCLUDED SOLELY TO AID IN THE
CONTRACTOR'S PREPARATION OF THE DOCUMENT. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR THE PREPARATION OF THEIR DOCUMENT AND INFORMATION
CONTAINED IN THEIR SPCD. UTILIZATION OF THE SAMPLE SPCD DOES NOT RELIEVE THE
CONTRACTOR OF THIS OBLIGATION.
THE CONTRACTOR SHALL PROVIDE THE SPCD A MINIMUM OF TEN (10) WORKING DAYS
PRIOR TO THE PRE-CONSTRUCTION CONFERENCE. THE SPCD SHOULD INCLUDE A GENERAL
STATEMENT, BY THE CONTRACTOR, THAT HE/SHE HAS READ AND WILL ABIDE BY THE
CSPP. THE SPCD SHOULD NOT DUPLICATE INFORMATION IN THIS CSPP. IF NO
SUPPLEMENTAL INFORMATION IS NECESSARY FOR A SECTION BELOW, THE STATEMENT
"NO SUPPLEMENTAL INFORMATION" SHOULD BE WRITTEN.
1. COORDINATION (AC 150/5370-2G, SECTION 2.5)
A. CONTRACTOR PROGRESS MEETINGS
1A. PRE-CONSTRUCTION CONFERENCE: A PRE-CONSTRUCTION CONFERENCE WILL BE
HELD TO INTRODUCE AND DISCUSS AIRPORT OPERATIONAL SAFETY DURING
CONSTRUCTION AS IT RELATES TO THIS PROJECT. THE PRE-CONSTRUCTION
CONFERENCE WILL BE SCHEDULED AFTER THE CONTRACT IS AWARDED. THE
PRE-CONSTRUCTION CONFERENCE WILL INCLUDE THE OWNER, CONTRACTORS,
SUB-CONTRACTORS, UTILITY COMPANIES, SUPPLIERS, FBO'S, AIRPORT TENANTS,
FAA, GDOT AND OTHER INTERESTED/AFFECTED PARTIES. THE ENGINEER WILL
COORDINATE THE MEETING DATE AND TIME AND WILL NOTIFY INTERESTED
PARTIES. THE OWNER'S REPRESENTATIVE WILL CONDUCT THE MEETING.
2A. PROGRESS & SAFETY MEETINGS: PROGRESS MEETINGS/SAFETY MEETINGS WILL BE
HELD BY THE OWNER'S REPRESENTATIVE DURING THE CONSTRUCTION PROJECT.
UNLESS OTHERWISE DIRECTED BY THE OWNER, PROGRESS MEETINGS/SAFETY
MEETINGS WILL BE HELD ON A BI-WEEKLY BASIS AND PRIOR TO A NEW MAJOR
CONSTRUCTION OPERATION CHANGE. THE PRIME CONTRACTOR IS REQUIRED TO
HAVE AN APPROPRIATE REPRESENTATIVE IN ATTENDANCE AT ALL MEETINGS. THE
CONTRACTOR'S EMPLOYEES, SUBCONTRACTOR'S EMPLOYEES, AND SUPPLIER'S
EMPLOYEES ARE ALL ENCOURAGED TO ATTEND.
AT EACH PROGRESS MEETING/SAFETY MEETING, PROJECT SAFETY AND
OPERATIONAL SAFETY WILL BE DISCUSSED. A SAFETY ORIENTATION MEETING IS
ALSO REQUIRED PRIOR TO EACH PHASE CHANGE FOR ALL PROJECT SITE
PERSONNEL.
B. SCOPE OR SCHEDULE CHANGES
THE CONTRACTOR SHALL PREPARE AND PRESENT AN UPDATED SCHEDULE AT
EVERY PROGRESS MEETING/SAFETY MEETING. THE OWNER'S REPRESENTATIVE
WILL REVIEW THE SCHEDULE, AND AS REQUIRED, WILL COORDINATE ANY
NECESSARY REVISIONS TO THE CSPP, BASED ON CONTRACTOR SCHEDULE, WITH
THE FAA.
C. FAA AIR TRAFFIC ORGANIZATION (ATO) COORDINATION
COORDINATION WITH FAA ATO IS THE RESPONSIBILITY OF THE OWNER THROUGH
THE ISSUANCE OF NOTAMS. THE CONTRACTOR IS REQUIRED TO PROVIDE THE
OWNER'S REPRESENTATIVE A MINIMUM OF 72 HOURS NOTICE PRIOR TO
BEGINNING CONSTRUCTION, PHASE CHANGES OR AN ACTIVITY THAT CAUSES A
CHANGE TO AIRPORT OPERATIONS.
2. PHASING (AC 150/5370-2G, SECTION 2.6)
A. PHASE ELEMENTS
REFER TO CSPP DRAWINGS FOR WORK TO BE COMPLETED PER INDIVIDUAL PHASE. THE
GENERAL WORK ITEMS TO BE COMPLETED ON THE PROJECT INCLUDES:
· SITE PREPARATION AND MOBILIZATION
· INSTALLATION OF AIRPORT SAFETY MEASURES
· CRACK SEAL/JOINT REPAIRS
· INSTALL NEW CRACK RELIEF INTERLAYER AND ASPHALT OVERLAY
· PAVEMENT MARKING
· EROSION CONTROL MEASURES (INCLUDING TEMPORARY/PERMANENT SEEDING,
FERTILIZING, MULCHING, AND SILT FENCE)
· CLEAN WORK AREA PAVEMENTS AND REMOVE SAFETY MEASURES
B. CONSTRUCTION SAFETY DRAWINGS
ALL CONSTRUCTION SAFETY DRAWINGS WILL BE INCLUDED AS PART OF THE FINAL
ISSUED CONSTRUCTION PLAN SET. THE CSPP DRAWINGS SHALL BE CONSIDERED
PART OF THIS "CONSTRUCTION SAFETY & PHASING PLAN".
3. AREAS & OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY
(AC 150/5370-2G, 2.7)
A. IDENTIFICATION OF AFFECTED AREAS
1. CLOSING, OR PARTIAL CLOSING, OF APRON, TAXIWAYS, AND RUNWAY:
· REFER TO CSPP DRAWINGS FOR CLOSURES DURING CONSTRUCTION.
· OWNER TO ISSUE NOTAMS PRIOR TO EACH CONSTRUCTION PHASE THAT
INCLUDES A PARTIAL APRON, TAXIWAY, OR RUNWAY CLOSURE.
2. CLOSING OF AIRCRAFT RESCUE AND FIRE FIGHTING (ARFF)/EMERGENCY VEHICLE
ROUTES.
· THE ARFF/EMERGENCY VEHICLE ROUTE SHALL NOT BE OBSTRUCTED BY ANY
CONTRACTOR EQUIPMENT, OPEN HOLES, ETC. WHICH WOULD HINDER THE
ARFF/EMERGENCY VEHICLES FROM UTILIZING THE DESIGNATED ACCESS ROUTE.
THE ACCESS ROUTE, THROUGH ANY CONTRACTOR WORK AREAS, SHALL BE
SWEPT AND KEPT CLEAN BY THE CONTRACTOR AT ALL TIMES TO PREVENT FOD
FROM BEING TRACKED ONTO ACTIVE AIRFIELD PAVEMENTS BY
ARFF/EMERGENCY VEHICLES.
· CONTRACTORS SHALL ALWAYS YIELD TO ANY ARFF/EMERGENCY VEHICLES
UTILIZING THE ACCESS ROUTE.
3. CLOSING OF ACCESS ROUTES USED BY AIRPORT SUPPORT VEHICLES.
· AS DIRECTED BY THE OWNER, THE CONTRACTOR SHALL MAINTAIN ADEQUATE
ACCESS ROUTES FOR AIRPORT FUEL TRUCK DELIVERIES AND GSE (GENERAL
SERVICE EQUIPMENT) AS REQUIRED.
· CONTRACTOR SHALL ALWAYS YIELD TO ANY FUEL TRUCKS AND GSE UTILIZING
THE ACCESS ROUTE.
4. INTERRUPTION OF UTILITIES, INCLUDING WATER SUPPLIES FOR FIRE FIGHTING.
· THE CONTRACTOR IS REQUIRED TO PROVIDE THE OWNER'S REPRESENTATIVE A
MINIMUM OF 72 HOURS NOTICE PRIOR TO ANY UTILITY INTERRUPTIONS.
SHOULD THERE BE AN ACCIDENTAL INTERRUPTION, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE AND TAKE EFFORTS TO
IMMEDIATELY RESTORE THE UTILITY SERVICE.
· NO INTERRUPTION IS ANTICIPATED AS A PORTION OF THE PROJECT.
5. APPROACH/DEPARTURE SURFACES AFFECTED BY HEIGHTS OF OBJECTS.
· THE CONTRACTOR SHALL LIMIT THEIR ACTIVITIES TO CLOSED PAVEMENTS FOR
CONSTRUCTION, AND SHALL ONLY PARK EQUIPMENT AND STOCKPILE SUPPLIES
IN THE STAGING AREA LOCATIONS DESIGNATED ON THE PLANS.
· APPROACH/DEPARTURE SURFACES WILL NOT BE AFFECTED DURING THE
CONSTRUCTION OF THIS PROJECT.
6. CONSTRUCTION AREAS.
· REFER TO CSPP DRAWINGS FOR ALLOWED CONSTRUCTION AREAS.
7. PROHIBITED CONSTRUCTION ACTIVITY
· NO CONSTRUCTION ACTIVITY IS ALLOWED WITHIN ANY ACTIVE AIRPORT
OPERATION AREA (AOA), WHETHER THAT BE WITHIN ANY APRON MOVEMENT
AREA, A RUNWAY SAFETY AREA (RSA) OR A TAXIWAY SAFETY AREA (TSA).
B. MITIGATION OF EFFECTS
1. TEMPORARY CHANGES TO RUNWAY, TAXIWAY AND APRON OPERATIONS:
· CEASE RUNWAY OPERATIONS DURING PHASE 3 OF THIS PROJECT.
· CEASE TAXIWAY 'B' OPERATIONS DURING PHASE 1 OF THIS PROJECT.
· CEASE TAXIWAY 'A' OPERATIONS DURING PHASE 2 OF THIS PROJECT.
2. DETOURS FOR ARFF/EMERGENCY VEHICLES AND OTHER AIRPORT VEHICLES
· REFER TO CSPP DRAWINGS FOR ARFF/EMERGENCY VEHICLE DETOUR ROUTES (IF
ANY) DURING CONSTRUCTION.
3. MAINTENANCE OF ESSENTIAL UTILITIES
· NO IMPACT TO ANY ESSENTIAL UTILITIES IS ANTICIPATED.
4. TEMPORARY CHANGES TO AIR TRAFFIC CONTROL PROCEDURES
· N/A
4. PROTECTION OF NAVIGATION AIDS (NAVAIDS)
(AC 150/5370-2G, SECTION 2.8)
NO NAVAIDS ARE AFFECTED BY THIS PROJECT. CONTRACTOR SHALL PROVIDE, IN THE
SPCD, THEIR PROCEDURE FOR PROTECTION OF EXISTING NAVAIDS ADJACENT TO PROJECT
WORK AREAS. THE CONTRACTOR SHALL PROVIDE TEMPORARY WIRING FOR ALL NAVAIDS
(NAVIGATIONAL AIDS) THAT MAY BE AFFECTED BY THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR IS REQUIRED TO PROVIDE THE OWNER'S REPRESENTATIVE A MINIMUM
OF 72 HOURS NOTICE PRIOR TO ANY NAVAID SHUTDOWN.
ALL AIRPORT-MAINTAINED NAVAIDS, IF ANY, AFFECTED BY THE CONSTRUCTION
IMPROVEMENTS ARE LISTED BELOW AND IDENTIFIED ON THE CSPP DRAWINGS. EXISTING
AIRPORT-MAINTAINED NAVAIDS AFFECTED BY CONSTRUCTION IMPROVEMENTS SHALL BE
ACTIVATED AND DEACTIVATED BY THE OWNER, UNLESS OTHERWISE STATED ON CSPP
DRAWINGS. CONTRACTOR SHALL TAKE ALL MEANS NECESSARY TO COORDINATE AND
PROTECT NAVAIDS AND ASSOCIATED UNDERGROUND UTILITIES FOR THE DURATION OF
THE PROJECT. THE FOLLOWING ARE A LIST OF AIRPORT MAINTAINED NAVAIDS:
· PAPIS WILL BE DEACTIVATED DURING PHASE 3 OF THIS PROJECT.
ALL FAA-MAINTAINED NAVAIDS, IF ANY, AFFECTED BY THE CONSTRUCTION
IMPROVEMENTS ARE LISTED BELOW AND IDENTIFIED ON THE CSPP DRAWINGS. EXISTING
FAA-MAINTAINED NAVAIDS AFFECTED BY CONSTRUCTION IMPROVEMENTS SHALL BE
ACTIVATED AND DEACTIVATED BY THE OWNER, UNLESS OTHERWISE STATED ON CSPP
DRAWINGS. CONTRACTOR SHALL TAKE ALL MEANS NECESSARY TO COORDINATE AND
PROTECT NAVAIDS AND ASSOCIATED UNDERGROUND UTILIITES FOR THE DURATION OF
THE PROJECT.
5. CONTRACTOR ACCESS (AC 150/5370-2G, SECTION 2.9)
A. LOCATION OF STOCKPILED CONSTRUCTION MATERIALS
· REFER TO CSPP DRAWINGS FOR STOCKPILE LOCATIONS. NO OTHER STOCKPILE
LOCATIONS ARE ALLOWED UNLESS OTHERWISE APPROVED BY THE OWNER. NO
STOCKPILES SHALL BE PLACED INSIDE RSAS, OFAS, OR OFZS UNLESS OTHERWISE
APPROVED BY THE OWNER AND FAA. STOCKPILES LOCATED IN AN ACTIVE ROFA
MUST BE APPROVED BY THE FAA.
· THE CONTRACTOR SHALL LIMIT THEIR STOCKPILE HEIGHTS TO 25 FEET.
· REFER TO SECTION 16 OF THIS CSPP FOR STOCKPILE LIGHTING REQUIREMENTS.
B. VEHICLE AND PEDESTRIAN OPERATIONS
1. CONSTRUCTION SITE PARKING
· REFER TO CSPP DRAWINGS FOR CONSTRUCTION SITE PARKING (STAGING AREA).
PERSONAL OCCUPANCY VEHICLES (POV) SHALL BE ALLOWED IN STAGING AREAS,
AIRPORT PARKING LOT, OR PARKING SPACES AT THE END OF T-HANGAR.
· IF PARKING CAPACITY BECOMES AN ISSUE, CONTRACTOR SHALL COORDINATE
WITH OWNER FOR ALTERNATIVE PARKING LOCATIONS.
2. CONSTRUCTION EQUIPMENT PARKING
· CONTRACTORS MUST PARK AND SERVICE ALL CONSTRUCTION VEHICLES IN THE
DESIGNATED STAGING AREA. INACTIVE EQUIPMENT MUST NOT BE PARKED IN
AIRPORT PARKING LOTS. ALL EQUIPMENT SHALL BE RETURNED TO STAGING
AREAS WHEN NOT BEING USED (ESPECIALLY AT NIGHT), UNLESS OTHERWISE
APPROVED BY THE OWNER.
· ALL EQUIPMENT PARKED IN STAGING AREA SHALL BE LOWERED TO LOWEST
POINT WHEN NOT IN USE.
· ANY CONTRACTOR EQUIPMENT ALLOWED BY THE OWNER TO BE PARKED IN THE
CURRENT CONTRACTOR WORK AREA SHALL BE PARKED AS FAR AWAY AS
POSSIBLE FROM ANY ACTIVE AOA PAVEMENTS.
· ALL VEHICLES/EQUIPMENT PARKING ADJACENT TO AIRFIELD PERIMETER
FENCING SHALL BE PARKED A MINIMUM OF 10 FEET AWAY FROM THE FENCE.
3. ACCESS AND HAUL ROUTES
· ACCESS POINTS
·· GATE(S): THE CONTRACTOR TO USE EXISTING SWING GATES FOR ACCESS.
GATES SHALL BE LOCKED WHEN NOT IN USE. OWNER TO PROVIDE
CONTRACTOR WITH KEYS FOR ACCESS.
·· ACCESS TO THE STAGING AND WORK AREAS BY THE CONTRACTOR SHALL BE
AS SHOWN ON THE PLANS UNLESS OTHERWISE AUTHORIZED BY THE
OWNER IN WRITING.
· HAUL ROUTES
·· REFER TO CSPP DRAWINGS FOR HAUL ROUTE LOCATIONS. THE
CONTRACTORS/SUBCONTRACTORS/DELIVERY VEHICLES SHALL USE ONLY
THE HAUL ROUTES SHOWN ON THE PLANS, UNLESS THE OWNER HAS
GRANTED PRIOR APPROVAL FOR AN ALTERNATE ROUTE IN WRITING.
·· THE CONTRACTOR SHALL MARK HAUL ROUTES TO BE USED WITH SIGNS OR
CONES AS REQUIRED BY THE OWNER. THE MARKING IS SUBJECT TO
OWNER/ENGINEER'S REVIEW AND THE OWNER'S APPROVAL.
·· THE CONTRACTOR SHALL WET (OR CLEAN) HAUL ROUTES AND
CONSTRUCTION TRAFFIC AREAS AS REQUIRED TO PREVENT EXCESSIVE DUST.
·· IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE
HAUL ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH
THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED
ROUTE.
4. MARKING AND LIGHTING OF VEHICLES
· ALL VEHICLES OR EQUIPMENT BELONGING TO THE CONTRACTOR,
SUBCONTRACTORS, AND SUPPLIERS, WHICH GO WITHIN AIRSIDE OPERATIONS
AREA (AOA) FOR ANY REASON SHALL DISPLAY AN APPROVED AMBER FLASHING
BEACON OR STROBE UNLESS SPECIFICALLY EXEMPTED FROM THIS REQUIREMENT
BY THE OWNER. ALL BEACONS AND STROBES SHALL BE VISIBLE FROM 360
DEGREES AND OF SUCH BRILLIANCE THAT THEY ARE READILY VISIBLE UNDER
NORMAL DAYLIGHT CONDITIONS. IN LIEU OF AN OPERABLE BEACON OR STROBE,
AN ORANGE AND WHITE-CHECKERED FLAG, AT LEAST THREE (3) FEET BY THREE
(3) FEET IN SIZE, MAY BE DISPLAYED ON AN APPROPRIATE STAFF ATTACHED TO
THE VEHICLE AND EQUIPMENT AS TO BE READILY VISIBLE. THIS OPTION IS
APPROVED FOR DAYLIGHT/VFR OPERATIONS ONLY AND SUBJECT TO THE
DISCRETION OF THE OWNER. VEHICLES AND EQUIPMENT NOT IN COMPLIANCE
WITH THE LIGHTING OR FLAGGING REQUIREMENTS OF THIS PARAGRAPH SHALL
NOT ACCESS PROPERTY WITHIN THE AOA UNLESS ESCORTED BY AN OWNER
APPROVED ESCORT VEHICLE. ALL VEHICLES AND EQUIPMENT SHALL
PROMINENTLY DISPLAY THE APPROPRIATE COMPANY/ORGANIZATIONAL
NAME/LOGO IN A MANNER APPROVED BY THE OWNER.
· MARKING AND LIGHTING OF VEHICLES SHALL COMPLY WITH AC 150/5210-5,
PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AN AIRPORT.
5. DESCRIPTION OF PROPER VEHICLE OPERATIONS
· ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL YIELD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .