LA-UR-11-12007

Approved for public release; distribution is unlimited.

Title: Request for Expression of Interest

166175 – RFP

CP – 08 – Firewater Tank Fabrication and Installation For The Chemistry & Metallurgy Research Replacement (CMRR) Project

Author(s): Bowers, Brian J.

Intended for: Electronic/World Wide Web

Disclaimer:

Los Alamos National Laboratory, an affirmative action/equal opportunity employer,is operated by the Los Alamos National Security, LLC for the National NuclearSecurity Administration of the U.S. Department of Energy under contract DE-AC52-06NA25396.

By acceptance of this article, the publisher recognizes that the U.S. Government retains nonexclusive, royalty-free license to publish or reproduce the published form of this contribution, or to allow others to do so, for U.S. Government purposes.

Los Alamos National Laboratory requests that the publisher identify this article as work performed under the auspices of the U.S. Departmentof Energy. Los Alamos National Laboratory strongly supports academic freedom and a researcher's right to publish;

as an institution, however, the Laboratory does not endorse the viewpoint of a publication or guarantee its technical correctness.

UNCLASSIFIED

Notice For Federal Business Opportunities - Subcontracts Page 1 of 1 Rev. 03, Dated November 09, 2011 166175-RFP, CP -08 – Firewater Tank Fabrication and Installation

Notice for Federal Business Opportunities General Information:

Document Type: Sources Sought

Solicitation Number: 166175

Title: CP-08 Firewater Tank Fabrication and Installation

Response Date: 30-November-2011

Classification Code: 43

NAICS: 332420

Small Business Set Aside: No

Recovery Act Project: No

Contracting Office Address:

Acquisition Services Management - CMRR Project Los Alamos National Laboratory (DOE Contractor) PO Box 1663 MS D442 Los Alamos, NM 87545.

Point(s) of Contact:

Primary: Name: Andrew Saunders

E-Mail: ajsaund@lanl.gov

Secondary: Name: Robert Ping E-Mail: rwping@lanl.gov

Description:

BACKGROUND:

The Chemistry and Metallurgy Research Replacement (CMRR) Project is issuing Requests for Expressions of Interest and Prequalification Data (REO) for potential construction/service subcontracts for the planned CMRR Nuclear Facility at the Los Alamos National Laboratory. A bidders list will be developed for each type of construction/service subcontract to be procured.

This request does not represent any confirmation by LANS of inclusion on the final bidders list, notification of subcontract award or authorization to commence any work related to this request.

INSTRUCTIONS:

All interested, capable, and responsible sources that wish to respond to this sources sought are required to download the supplementary document(s) included on the posting website.

The supplements include a summary scope of work and several questionnaire(s) that must be completed in their entirety and returned electronically to the identified Point(s) of Contact by the Requested Response Date. The questionnaires are designed to evaluate general subcontractor capabilities (technical and financial), safety experience, and quality experience.

Once the sources sought requirement has closed, the CMRR Project will Pre-Qualify offerors based on accurate and complete submission of the questionnaire(s).

mailto:ajsaund@lanl.gov�

Request for Expression of Interest, Subcontract Page 1 of 3 Rev. 02, Dated November 09, 2011 166175-RFP, CP-08 – Firewater Tank Fabrication and Installation moo+

Request for Expression of Interest

166175 – RFP

CP – 08 – Firewater Tank Fabrication and Installation

For The Chemistry & Metallurgy Research Replacement (CMRR) Project

Los Alamos National Laboratory (LANL) is seeking Expressions of Interest and Prequalification Data from qualified firms for the services described below.

GENERAL NOTES:

The Chemistry and Metallurgy Research Replacement (CMRR) Project is issuing Requests for Expressions of Interest and Prequalification Data (REO) for potential construction/service subcontracts for the planned CMRR Nuclear Facility at the Los Alamos National Laboratory. A bidders list will be developed for each type of construction/service subcontract to be procured.

This request does not represent any confirmation by LANS of inclusion on the final bidders list, notification of subcontract award or authorization to commence any work related to this request.

SCOPE OF WORK:

The SUBCONTRACTOR shall furnish qualified personnel, equipment, tools, supplies, transportation, rigging, hoisting, temporary offices, technical supervision, professional expertise, labor and materials to safely perform all Work necessary for provision of two firewater storage tanks (FWST) for the CMRR Nuclear Facility (NF).

The Work includes, but is not limited to engineering, design, procurement of materials, shop fabrication, packaging, delivery, receipt, field assembly, anchorage, valves, connections, appurtenances, manways, internals, name-plates, lifting lugs, support for adjacent piping and conduit as identified on the construction drawings, field test closures and closure water level sightglass, internal baffles, internal and external coatings, grounding, alarms, overflow, nameplates, anchor-bolt templates (if required) spare parts, anchorage, tools for maintenance, lifting and assemblage subsequent to installation, maintenance instructions for maintenance required during storage (if FWST components are required to be stored at Contractor’s facility prior to installation), inspection, testing and any other work required to provide a code compliant, fully operational, fully commissioned fire water storage tank system within the NF building. The Work will require:

• Fabrication of FWST sections that can be transported to the site for final assembly.

• Assemblage on site of the two firewater tanks.

• Application of required coatings to interior and exterior surfaces as specified;

• Performance of pressure integrity testing per specifications following site assembly of the tanks.

• Coordination of with concrete subcontractors for installation of any anchorages, embeds, or bolts required for completion of the FWST systems.

• Coordination of the timing and installation of the tanks with other subcontractors as the building shell work progresses; and

• Rough set and final set (minus grout) the firewater tanks.

Request for Expression of Interest, Subcontract Page 2 of 3

The tanks shall be provided in accordance with all required Nuclear Safety Functions and Non-Safety Functions as defined in the design documents.

Manufacture Tanks according to NFPA – 22 and augmented quality requirements from ASME Section III, Subsection ND.

Tanks shall be Horizontal with Elliptical Heads, 159,000 gal capacity, vented to allow a flow of 1,287 gallons per minute for 120 minutes.

The tanks shall be coated internal and externally prevent corrosion of the internal and external metal surfaces of the FWST to help maintain the safety class pressure boundary function of the tank.

LEED requirements will apply.

FWST Minimum Design Life 50 Years.

All equipment, which needs periodic monitoring and/or maintenance (e.g. instruments, valves, and vents), shall be made accessible during operation when deemed necessary by means of appropriate stairs, ladders, or platforms.

The Work includes, but is not limited to, all required submittals, an installation logistics plan (to be approved by the Contractor, design, shop drawings, lay out, cleanup and coordination as necessary to provide a complete installation and fully operational FWST system in accordance with the design documents and LANL standards.

Subcontractor will be required to comply with all applicable NQA-1 and DOE policies, procedures and orders.

Subcontractor will be required to comply with all LANL and Contactor QA and QC policies and procedures.

Subcontractor will be required to comply with all LANL and Contractor Safety policies and procedures.

Subcontractor shall be required to comply with Suspect/Counterfeit Item processes and procedures and programs.

Phasing of the work will be required. Subcontractor shall provide sufficient resources to complete the work in accordance with the Schedule. Coordination with other Construction Packages, other subcontractors, and Contractor forces will be required.

Subcontractor will be required to accommodate testing and inspections by Contractor at any and all Subcontractor (and Subcontractor’s tiered subcontractors) facilities, offices, fabrication shops, storage facilities.

Subcontractor shall include provision for its personnel (time) to be trained in LANL and Contractor policies and procedures.

Subcontractor personnel will be required to obtain LANL badges.

EXCLUSIONS TO SCOPE OF WORK:

• Curriculum and trainer for LANL and Contractor training.

Request for Expression of Interest, Subcontract Page 3 of 3

SAFETY PREREQUISITES:

Subcontractor must demonstrate safety performance equal to or lower than the following standards:

Statistical Standards

Experience Modification Rate

The “EMR” is a number that is assigned to your company based on the insurance premium you pay and your loss statistics. Contact your insurance company for these numbers.

Maximum Allowable Average:

1.00

Total Recordable Injury/Illness Case Rate

(from Company OSHA 300 log)

Rate =

Total Recordable Injuries/Illnesses x 200,000 Total Employee Hours Worked

Maximum

3.2

DART Case Rate (Days Away From Work, Restriction, or Job Transfer) (from Company

OSHA 300 log)

Rate =

Total Days Away/Restricted/Transferred Work Day Cases x 200,000

Total Employee Hours Worked

Maximum

1.4

Subcontractor Questionnaire Page 1 of 10 Rev. 02, Dated September 16, 2011 166175-RFP, CP-08 –Firewater Tank Fabrication and Installation

SUBCONTRACTOR QUESTIONNAIRE

Enter Dun and Bradstreet (DUNS) Number:

1. GENERAL INFORMATION

NAME OF COMPANY (Full Legal Name)

STREET ADDRESS CITY - STATE - ZIP CODE

MAILING ADDRESS CITY - STATE - ZIP CODE

TELEPHONE FACSIMILE E-MAIL

WEBSITE TELEX/TWX/CABLE OTHER

A. Type of Business (check box or boxes) CORPORATION OR

COMPANY SUBSIDIARY DIVISION PARTNERSHIP

Name and location of Parent Company DUNS No.

If a Division, enter name and location of Corporate Headquarters

DUNS No.

If more than one DUNS number applies to your operation, attach additional explanatory page(s).

B. Type of Subcontractor (check box or boxes)

MANUFACTURER/

FABRICATOR* DISTRIBUTOR/

SUPPLY HOUSE* MANUFACTURERS

REPRESENTATIVE* GENERAL

CONTRACTOR

CONSTRUCTION* ARCHITECTURAL/

ENGINEERING* TECHNICAL

SERVICE* OTHER*

* Specialization/Description As Follows:

C. Enter Applicable SIC Codes:

D. Enter Applicable NAICS Codes (North America):

E. Date Business Founded: Under Present Ownership Since:

F. Number of Permanent Employees: Manual: Non-Manual:

G. Small, Disadvantaged, Women-Owned or Veteran Status (Reference Questionnaire - Appendix “A” For Definitions)

Check Applicable Boxes SMALL WOMEN-OWNED DISADVANTAGED: HUB ZONE

VETERAN OWNED SERVICE DISABLED VETERAN OWNED

2. FINANCIAL INFORMATION (This section MUST BE COMPLETED for consideration. Information is kept CONFIDENTIAL.)

A. Bank Name: Agent: Phone No.:

B. Annual Sales Volume (Last 3 Years):

Year:

20___ $ Year:

20___ $ Year:

20___ $

C. Present Net Worth

D. Can you furnish a Payment and Performance Bond? Yes No

If “Yes”, indicate Max Dollar Limit: $250,000 $500,000 $1,000,000 $5,000,000 $10,000,000 >$25,000,000

Surety Name: Agent: Phone No.:

E. If required, can you furnish a Bank Guarantee or Letter of Credit? Yes No

If “Yes”, indicate Max Dollar Limit: $250,000 $500,000 $1,000,000 $5,000,000 $10,000,000 >$25,000,000

Surety Name: Agent: Phone No.:

Subcontractor Questionnaire Page 2 of 10

F. Current Financial Ratios (Public companies only) Not Applicable Working Capital / Total Assets Retained Earnings / Total Assets

Earnings Before Interest and Taxes / Total Assets Market Value of Equity / Total Liabilities

Sales / Total Assets

G. Current Financial Ratios (Private companies only) Not Applicable (Current Assets-Current Liabilities) / Total Assets Retained Earnings / Total Assets

Earnings Before Interest and Taxes / Total Assets Book Value of Equity / Total Liabilities

Sales / Total Assets

3. PERSONNEL (State “Not Applicable” if the position does not exist )

A. President: D. QA/QC Manager:

B. Sales Manager: E. Field Support Manager:

C. Engineering Manager : F. Safety Manager:

4. LABOR RELATIONS

(List all crafts with which you have contracts and/or working agreements. Not Applicable

CRAFT EXPIRATION DATE CRAFT EXPIRATION DATE

1. 3.

2. 4.

5. QUALITY

A. Do you have a Quality Assurance/ program written to comply with the following:

Nuclear related activities – 10CFR 830, Subpart A and DOE Order O 414.1C, Contractor requirements document (Attachments 2, 3 and 4) as implemented through a quality assurance program compliant with ASME NQA-1-2008, with 2009 addenda.

Other: Specify_______________________________________________________________________________________________________ Non Nuclear related activities – 10 CFR 830, Subpart A and DOE Order O 414.1.C, Contractor requirements document (Attachments 2, 3 and 4) as implemented through a quality assurance program compliant with ISO 9001-2000 Other: Specify_______________________________________________________________________________________________________

Nuclear Yes No Other Program (Please Specify)

ISO 9001 Yes No Other Program (Please Specify)

For your Quality Assurance/Quality Control program(s), attach the Table of Contents from relevant manual(s) or, on additional pages, describe the method and level of compliance standard(s).

6. BIDDING INTEREST AND QUALIFICATIONS

A. Indicate your relevant experience and qualifications as described in the attached “Scope of Work”.

(Attach additional pages if necessary)

B. Indicate appropriate Contract/Purchase Order dollar range within which you prefer, and are currently able, to bid (i.e., $250,000 to $1,500,000)

$ to $

C. Indicate Industry or Code Certifications (ASME, API, TEMA, Class of Code-Stamp, etc.)

CERTIFICATION EXPIRATION DATE CERTIFICATION EXPIRATION DATE

1. 4.

2. 5.

3. 6.

Subcontractor Questionnaire Page 3 of 10

D. Subcontract Services (List type of work normally subcontracted to others)

7. PROFESSIONAL LICENSES

Indicate the work category you are licensed for and the area(s) (Country/State/Province) in which you hold each. Attach additional pages, if necessary.

TYPE OF LICENSE LOCATION TYPE OF LICENSE LOCATION

1. 4.

2. 5.

3. 6.

8. CONTRACTORS’ SPECIFIC NON-MANUAL, ENGINEERING, ARCHITECTURAL AND CONSTRUCTION TYPE LISTINGS:

A. List Personnel by Discipline (Number on Staff) – (State “Not Applicable” if the position does not exist )

Project Managers Structural Engineers Construction Inspectors

Administrators Sanitary Engineers Laborers

Estimators Transportation Engineers Carpenters

Architects Technical Writers Operators

Chemical Engineers Surveyors Painters

Electrical Engineers Superintendants Electricians

Mechanical Engineers Foremen Iron Workers

9. WORK HISTORY (Complete the attached Work History form per Appendix “B” and attach to this Questionnaire) Also attach a list of permanent offices and any brochures that further describe your company's activities and capabilities. Please do not include product catalogs, inventory or price lists.

10. SAFETY & HEALTH EXPERIENCE (Complete the attached S&H form per Appendix “C” and attach to this Questionnaire)

11. SOCIAL AND ENVIRONMENT SUSTAINABILITY INITIATIVES (Check all that are employed or achieved through company initiatives)

Written environmental policy Leadership in Energy and Environmental Design (LEED) Certification

Environmental performance integrated into corporate mission Policies and practices to minimize fuel usage or use of alternative energy

Social performance integrated into corporate mission Initiatives to mitigate environmental impacts of on-site services

Annual report detailing its mission-related performance (e.g. corporate social and environmental targets)

Code of conduct holding sub suppliers accountable for social and environmental performance

12. COMPLETED BY:

SIGNATURE TITLE

NAME DATE

APPENDICES:

APPENDIX “A” – GLOSSARY FOR SMALL, DISADVANTAGED, WOMEN-OWNED AND VETERAN ENTERPRISES

APPENDIX “B” – CONTRACTOR/SUPPLIER WORK HISTORY

APPENDIX “C” – CONTRACTOR SAFETY & HEALTH QUALIFICATION DATA

Subcontractor Questionnaire Page 4 of 10

APPENDIX A

GLOSSARY FOR SMALL, DISADVANTAGED, WOMEN-OWNED, AND VETERAN ENTERPRISES

Following are definitions of small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUB Zone small business concerns, minority business enterprises, small disadvantaged business concerns, women-owned small business concerns and labor surplus area business concerns (all called “Enterprises”) as defined by the U.S. Federal Acquisition Regulations:

Small-Business Concern Firms, including affiliates, that are independently owned and operated, not dominant in the field of operation in which they are bidding on Government contracts, and that qualify under the criteria and size standards for small businesses in 13 CFR Part 121 as determined by the SBA.

HUB Zone A historically underutilized business zone which is located within one or more qualified census tracts, qualified metropolitan counties, or lands within the external boundaries of an Indian reservation. HUBZone’s appear on the List of Qualified HUBZone Small Business Concerns maintained by the SBA.

Veteran-owned Small Business Concern

A small business concern – (1) not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and (2) the management and daily business operations of which are controlled by one or more veterans.

Service-disabled Veteran-owned small Business Concern

(1) A small business concern – (i) not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and (ii) The management and daily business operations of which are controlled by one or more service-disabled or, in the case of a veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran. (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

Small Disadvantaged Business Concern (Minority)

An offeror that represents, as part of its offer, that it is a small business under the size standard applicable to the acquisition; and either – It self certifies as a small disadvantaged business concern consistent with 13 CFR part 124, subpart B; and (i) No material change in disadvantaged ownership and control has occurred since its certification; (ii) Where the concern is owned by one or more disadvantaged individuals upon whom the certification is based does not exceed $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and (iii) It is identified, on the date of its representation, as a self certified small disadvantaged business concern in the database maintained by the SBA (Central Contractor Registration (CCR)).

Women-Owned Small Business Concern

A small business concern – 1) which is at least 51 percent owned by one or more women: or in the case of any publicly owned business, at least 51 percent of the stock which is owned by one or more women; and 2) whose management and daily operations are controlled by one or more women.

Subcontractor Questionnaire Page 5 of 10

APPENDIX B

SUBCONTRACTOR WORK HISTORY

The Contractor submits the following statement as to its experience qualifications:

1. If stated in the cover letter, provide only experience in work similar in type and magnitude to the identified Work Scope.

2. All awarded contracts have been satisfactorily completed, except as follows (Name any and all exceptions and reasons therefore, attaching additional pages if necessary):

3. The following contracts are currently in progress or have been satisfactorily completed within the last three years or the period specified in the cover letter.

4. If you have not worked in the country specified in the cover letter within the period outlined in 3 above, add a separate page listing any work ever performed in that country. [Item

4 does not apply to U.S. work.]

5. Column Completion Notes:

a. Name and Address. For past work, include an asterisk (*) to identify any work that required nuclear quality assurance.

b. Work Description. Describe work scope and then indicate if prime or subcontract.

c. Start/Stop. Provide starting date and actual/forecast completion by mo/yr, e.g., Jan 93/Sep94.

d. Schedule and Budget. State either "over", "on", or "under" the contract schedule and budget.

Contractor/SUPPLIER WORK HISTORY

Customer Name, address, representative and phone no.

Work Description Location Value Start/Stop Schedule Budget

Subcontractor Questionnaire Page 6 of 10

List any awarded Contracts/Purchase Orders that were not satisfactorily completed: (List any and all exceptions and reasons therefore, attaching additional pages if necessary):

Subcontractor Questionnaire Page 7 of 10

APPENDIX C

SUBCONTRACTOR SAFETY AND HEALTH QUALIFICATION DATA

NAME OF COMPANY:

The above named Company submits the following Safety & Health qualification data:

1. SAFETY PERFORMANCE

1.1.a Provide a brief description of each fatality your firm has incurred in the three most recent years (add pages if required):

Year 20[ ] Year 20[ ] Year 20[ ]

1.1.b Provide a brief description of each fatality by any sub-tier subcontractor working under your direction has incurred in the three most recent years (add pages if required):

Year 20[ ] Year 20[ ] Year 20[ ]

1.2.a Provide the following information on your firm for the three most recent years:

20[ ] 20[ ] 20[ ]

a. Number of lost workday cases.

b. Number of restricted workday cases.

c. Number of cases with medical attention only.

d. Number of fatalities.

e. Number of hours worked.

1.2.b Provide the following information on any sub-tier subcontractor working under your direction for the three most recent years:

20[ ] 20[ ] 20[ ]

a. Number of lost workday cases.

b. Number of restricted workday cases.

c. Number of cases with medical attention only.

d. Number of fatalities.

e. Number of hours worked.

Subcontractor Questionnaire Page 8 of 10

2. Are accident reports and report summaries sent to the following and how often?

No Yes Monthly Quarterly Annually

a. Project Superintendent/Site Manager.

b. Vice President/Manager of Construction

c. Safety Director

d. President of Firm

3. Do you hold site safety meetings for field employees both Manual and Non-Manual?

Yes No

How Often?

Weekly Bi-Weekly Monthly Less Often, As needed

4. Do you conduct project safety inspections?

If yes, who conducts this inspection?

TITLE HOW OFTEN?

5. How are accident records and accident summaries kept? How often are they reported?

No Yes Monthly Annually

a. Accidents totaled for the entire company

b. Accidents totaled by project

(1) Subtotaled by superintendent

(2) Subtotaled by foreman

6. How are costs of individual accidents kept? How often are they reported?

No Yes Monthly Annually

a. Costs totaled for the entire company

b. Costs totaled by project

(1) Subtotaled by superintendent

(2) Subtotaled by foreman

7. List key Safety and Health personnel planned for this project. Please list name and expected position. When a project has not been specified, list key company personnel.

NAME POSITION PROPOSED / CURRENT PROJECT

Subcontractor Questionnaire Page 9 of 10

8. Do you have a written safety & health program?

9. Do you have an orientation program for new hires?

If yes, submit a copy for evaluation. Does it include instruction on the following?

Yes No Yes No

a. Head protection i. Fire protection

b. Eye protection j. First aid facilities

c. Hearing protection k. Emergency procedures

d. Respiratory protection l. Toxic substances

e. Safety belts and lifeline m. Trenching and excavation

f. Scaffolding n. Signs, barricades, flagging

g. Perimeter guarding o. Electrical safety

h. Housekeeping p. Rigging and crane safety

q. Road Safety (Driving)

10. Do you have a program for newly hired or promoted foremen?

If yes, submit a copy for evaluation. Does it include the following?

Yes No Yes No

a. Safe work practices e. First aid procedures

b. Safety supervision f. Accident investigation

c. Toolbox meetings g. Fire protection and prevention

d. Emergency procedures h. New worker orientation

11. Do you hold craft “toolbox” safety meetings?

How Often?

Weekly Bi-Weekly Monthly Less Often, As needed

12. Do you have a written Hazard Communication program?

If yes, how is it implemented on each project?

Subcontractor Questionnaire Page 10 of 10

13. Do you have/require Material Safety Data Sheets (M.S.D.S.) for material/chemicals/equipment?

If yes, explain field procedure for informing craft workers about potential hazards:

14. List three (3) client references that could verify the quality and management commitment of your safety program.

Name Address Phone No.

a.

b.

c.

Subcontractor Quality Questionnaire Page 1 of 4 Rev. 00 Dated November 09, 2011 166175-RFP, CP-08 –Firewater Tank Fabrication and Installation

SUPPLIER QUALITY ASSURANCE QUESTIONNAIRE

Supplier or Sub-Tier Name:

Location/Address of Supplier facility (ies):

Product Description:

Does the manufacturer (distributors should obtain the assistance of the manufacturer to complete this) or contractor have a written Quality Assurance Program (QAP) Management System that is developed, implemented and maintained?

Yes No [Hint: Double-click on a box to default to checked, then cut and paste box for the rest of the answers.]

QA/QC MANUAL TITLE ________________________________

REVISION AND ISSUE DATE _________________

ATTACH A TABLE OF CONTENTS OR LISTING AND OTHER SUPPORTING INFORMATION TO THE QUESTIONNAIRE

QA/QC program table of contents and other supporting information attached? Yes No

IDENTIFY CODES AND/OR STANDARDS WITH WHICH YOUR QA/QC PROGRAM COMPLIES

Codes/Standards/Supplements Yes No Comments/Equivalent

1. DOE Order 414.1__ (identify version), Attachment 2

2. ASME NQA-1 ________ (identify year)

3. ASME Section _____ (Certificate No.___________)

4. ISO _______ (Certificate No. _____________)

5. What industry standards do you currently use to develop software/firmware? _______________________________

6. Other Codes and Standards:__________________________________________________________________

ASME NQA-1-2008/ASME NQA-1a-2009

Indicate whether your QA/QC Manual and/or implementing procedures address the following:

ASME NQA-1 Program Elements Yes No Procedure/Manual

ASME NQA-1, Requirement 1, Organization ASME NQA-1, Requirement 2, Quality Assurance Program ASME NQA-1, Requirement 2, Auditor/Lead Auditor Qualifications ASME NQA-1, Requirement 2, Qualification of Inspection and Test Personnel ASME NQA-1, Requirement 2, Qualification of Nondestructive Testing Personnel ASME NQA-1, Requirement 3, Design Control Do you develop software in accordance with NQA-1 software engineering requirements?

ASME NQA-1, Requirement 4, Procurement Document Control ASME NQA-1, Requirement 5, Instructions, Procedures, and Drawings ASME NQA-1, Requirement 6, Document Control ASME NQA-1, Requirement 7, Control of Purchased Items and Services

Subcontractor Quality Questionnaire Page 2 of 4

Indicate whether your QA/QC Manual and/or implementing procedures address the following:

ASME NQA-1 Program Elements Yes No Procedure/Manual

Do you dedicate commercial off-the-shelf software for use as a Commercial Grade Item in accordance with NQA-1 requirements?

ASME NQA-1, Requirement 8, Identification and Control of Items ASME NQA-1, Requirement 9, Control of Special Processes Identify the welding codes_______________

ASME NQA-1, Requirement 10, Inspection ASME NQA-1, Requirement 11, Test Control ASME NQA-1, Requirement 12, Control of Measuring and Test Equipment Do your reference standards have a minimum accuracy four times greater than that of the measuring and test equipment being calibrated?

ASME NQA-1, Requirement 13, Handling, Storage, and Shipping ASME NQA-1, Requirement 14, Inspection, Test, and Operating Status ASME NQA-1, Requirement 15, Control of Nonconforming Items ASME NQA-1, Requirement 16, Corrective Action ASME NQA-1, Requirement 17, Quality Assurance Records ASME NQA-1, Requirement 18, Audits ASME NQA-1, Subpart 2.2, Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Nuclear Power Plants ASME NQA-1, Subpart 2.7, Quality Assurance Requirements for Computer Software for Nuclear Facility Applications ASME NQA-1, Subpart 2.14, Quality Assurance Requirements for Commercial Grade Items and Services Identify other ASME NQA-1 Part II, Subparts applicable to the quality assurance/quality control program___________

DOE ORDER 414.1

Indicate whether your QA/QC Manual and/or implementing procedures address the following:

DOE ORDER 414.1 Requirement Yes No Procedure/Manual DOE Order 414.1, Attachment 2, Quality Assurance Criterion (1) - Program Establish an organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing work. Establish management processes, including planning, scheduling, and providing resources for work.

(An NQA-QA program will need to describe the management process for providing resources.)

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (2) - Personnel Training and Qualification Establish an organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing work. Establish management processes, including planning, scheduling, and providing resources for work.

Subcontractor Quality Questionnaire Page 3 of 4

Indicate whether your QA/QC Manual and/or implementing procedures address the following:

DOE ORDER 414.1 Requirement Yes No Procedure/Manual

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (3) - Quality Improvement Establish and implement processes to detect and prevent quality problems. Identify, control, and correct items, services, and processes that do not meet established requirements.

Identify the causes of problems and work to prevent them. Review item characteristics, process implementation, and other quality-related information to identify items, services, and processes needing improvement.

(The DOE Order extends the requirements of NQA-1 to all problems including all conditions [not limited to significant] adverse to quality and to all nonconforming items [not limited to generic]).

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (4) - Documents and Records Prepare, review, approve, issue, use, and revise documents to prescribe processes, specify requirements, or establish design. Specify, prepare, review, approve, and maintain records.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (5) - Work Processes Perform work consistent with technical standards, administrative controls, and hazard controls adopted to meet regulatory or contract requirements using approved instructions, procedures, etc. Identify and control items to ensure their proper use. Maintain items to prevent their damage, loss, or deterioration. Calibrate and maintain equipment used for process monitoring or data collection.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (6) - Design Design items and processes using sound engineering/scientific principles and appropriate standards. Incorporate applicable requirements and design bases in design work and design changes. Identify and control design interfaces. Verify/validate the adequacy of design products using individuals or groups other than those who performed the work.

Verify/validate work before approval and implementation of the design.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (7) - Procurement Procure items and services that meet established requirements and perform as specified.

Evaluate and select prospective suppliers on the basis of specified criteria. Establish and implement processes to ensure that approved suppliers continue to provide acceptable items and services.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (8) - Inspection and Acceptance Testing Inspect and test specified items, services, and processes using established acceptance and performance criteria. Calibrate and maintain equipment used for inspections and tests.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (9) - Management Assessment Ensure that managers assess their management processes and identify and correct problems that hinder the organization from achieving its objectives.

DOE Order 414.1, Attachment 2, Quality Assurance Criterion (10) - Independent Assessment Plan and conduct independent assessments to measure item and service quality and the adequacy of work performance and to promote improvement. Establish sufficient authority and freedom from line management for independent assessment teams. Ensure that persons conducting independent assessments are technically qualified and knowledgeable in the areas to be assessed.

Subcontractor Quality Questionnaire Page 4 of 4

Indicate whether your QA/QC Manual and/or implementing procedures address the following:

DOE ORDER 414.1 Requirement Yes No Procedure/Manual

DOE Order 414.1, Attachment 2, Suspect/Counterfeit Items Preventing the introduction and use of S/CIs through engineering involvement, design, procurement, testing, inspection, maintenance, evaluation, disposition, reporting, trend analysis, and lessons learned work process controls. Training and informing managers, supervisors, and workers on S/CI processes and controls (including prevention, detection, and disposition of S/CIs). Identifying and disposing of S/CIs on site. Restricting S/CI use to only those items that have been found acceptable through engineering analysis and formal disposition process. Collecting, maintaining, disseminating, and using the most accurate, up-to-date information on S/CIs and associated suppliers using all available sources.

(An NQA-1 QA program will need to be expanded to address Suspect/Counterfeit items.)

DOE Order 414.1, Attachment 2, Safety Software Quality Requirements Is your software quality assurance program based on national or international standards?

If yes, identify which ones apply below:

___ASME NQA-1, Part I, Requirement 3 ___ASME NQA-1, Part I, Requirement 11 ___ASME NQA-1, Part II, Subpart 2.7 Other______________________

Does your software quality assurance program define a method for grading safety software and establishing controls based on the level of importance?

Does your software quality assurance program include controls for software configuration management and quality planning, software risk management, software procurement and supplier management, software requirements identification and management, software design and implementation, software verification and validation, and problem reporting and corrective action?

General

Preparer_____________________ Signature_______________ Title________________________ Date_________

Do you understand the questions above? Yes No

If no, please provide your comments or suggestions. Also, provide any additional information relevant to your quality assurance program.

Other files

File Type Posted
Amendment003_ FireWater_Tanks.pdf PDF
Amendment002_ FireWater_Tanks.pdf PDF
Amendment001_ FireWater_Tanks.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .