100320-SPEC-ENG-073, Non-Safety Fuel Oil Storage Tanks and Transfer Pumps
Supplier Quality Assurance Questionnaire
SUPPLIER QUALITY ASSURANCE QUESTIONNAIRE
Supplier or Sub-Tier Name:
Location/Address of Supplier facility (ies):
Product Description:
Does the manufacturer (distributors should obtain the assistance of the manufacturer to complete this) or contractor have a written Quality Assurance Program (QAP) Management System that is developed, implemented and maintained?
Yes FORMCHECKBOX No FORMCHECKBOX [Hint: Double-click on a box to default to checked, then cut and paste box for the rest of the answers.]
QA/QC MANUAL TITLE ________________________________
REVISION AND ISSUE DATE _________________
ATTACH A TABLE OF CONTENTS OR LISTING AND OTHER SUPPORTING INFORMATION TO THE QUESTIONNAIRE
QA/QC program table of contents and other supporting information attached? Yes FORMCHECKBOX No FORMCHECKBOX
IDENTIFY CODES AND/OR STANDARDS WITH WHICH YOUR QA/QC PROGRAM COMPLIES
| Codes/Standards/Supplements |
| Yes |
| No |
| Comments/Equivalent |
| 1. DOE Order 414.1__ (identify version), Attachment 2 |
| FORMCHECKBOX |
FORMCHECKBOX
| 2. ASME NQA-1 ________ (identify year) |
| FORMCHECKBOX |
FORMCHECKBOX
| 3. ASME Section _____ (Certificate No.___________) |
| FORMCHECKBOX |
FORMCHECKBOX
| 4. ISO _______ (Certificate No. _____________) |
| FORMCHECKBOX |
FORMCHECKBOX
5. What industry standards do you currently use to develop software/firmware? _______________________________
6. Other Codes and Standards:__________________________________________________________________
ASME NQA-1-2008/ASME NQA-1a-2009
Indicate whether your QA/QC Manual and/or implementing procedures address the following:
| ASME NQA-1 Program Elements |
| Yes |
| No |
| Procedure/Manual |
| ASME NQA-1, Requirement 2, Quality Assurance Program Paragraph 100 (except paragraph (c)) |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 3, Design Control - Paragraphs 100 and 501.3 |
| FORMCHECKBOX |
FORMCHECKBOX
| Do you control and verify (test) software used for conducting design analysis? |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 4, Procurement Document Control – Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 5, Instructions, Procedures, and Drawings |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 6, Document Control, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 7, Control of Purchased Items and Services, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 8, Identification and Control of Items, paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
ASME NQA-1, Requirement 9, Control of Special Processes, Paragraphs 100 and 201 Identify the welding codes_______________
FORMCHECKBOX
FORMCHECKBOX
| ASME NQA-1, Requirement 10, Inspection, Paragraphs 100, 401, and 800 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 11, Test Control, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 12, Control of Measuring and Test Equipment, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 13, Handling, Storage, and Shipping, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 15, Control of Nonconforming Items, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
| ASME NQA-1, Requirement 17, Quality Assurance Records, Paragraph 100 |
| FORMCHECKBOX |
FORMCHECKBOX
DOE ORDER 414.1
Indicate whether your QA/QC Manual and/or implementing procedures address the following:
| DOE ORDER 414.1 Requirement |
| Yes |
| No |
| Procedure/Manual |
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (1) - Program
Establish an organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing work. Establish management processes, including planning, scheduling, and providing resources for work.
(An NQA-QA program will need to describe the management process for providing resources.)
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (2) - Personnel Training and Qualification
Establish an organizational structure, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing work. Establish management processes, including planning, scheduling, and providing resources for work.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (3) - Quality Improvement
Establish and implement processes to detect and prevent quality problems. Identify, control, and correct items, services, and processes that do not meet established requirements. Identify the causes of problems and work to prevent them. Review item characteristics, process implementation, and other quality-related information to identify items, services, and processes needing improvement.
(The DOE Order extends the requirements of NQA-1 to all problems including all conditions [not limited to significant] adverse to quality and to all nonconforming items [not limited to generic]).
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (4) - Documents and Records
Prepare, review, approve, issue, use, and revise documents to prescribe processes, specify requirements, or establish design. Specify, prepare, review, approve, and maintain records.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (5) - Work Processes
Perform work consistent with technical standards, administrative controls, and hazard controls adopted to meet regulatory or contract requirements using approved instructions, procedures, etc. Identify and control items to ensure their proper use. Maintain items to prevent their damage, loss, or deterioration. Calibrate and maintain equipment used for process monitoring or data collection.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (6) - Design
Design items and processes using sound engineering/scientific principles and appropriate standards. Incorporate applicable requirements and design bases in design work and design changes. Identify and control design interfaces. Verify/validate the adequacy of design products using individuals or groups other than those who performed the work. Verify/validate work before approval and implementation of the design.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (7) - Procurement Procure items and services that meet established requirements and perform as specified. Evaluate and select prospective suppliers on the basis of specified criteria. Establish and implement processes to ensure that approved suppliers continue to provide acceptable items and services.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (8) - Inspection and Acceptance Testing Inspect and test specified items, services, and processes using established acceptance and performance criteria. Calibrate and maintain equipment used for inspections and tests.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (9) - Management Assessment Ensure that managers assess their management processes and identify and correct problems that hinder the organization from achieving its objectives.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Quality Assurance Criterion (10) - Independent Assessment
Plan and conduct independent assessments to measure item and service quality and the adequacy of work performance and to promote improvement. Establish sufficient authority and freedom from line management for independent assessment teams. Ensure that persons conducting independent assessments are technically qualified and knowledgeable in the areas to be assessed.
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Suspect/Counterfeit Items
Preventing the introduction and use of S/CIs through engineering involvement, design, procurement, testing, inspection, maintenance, evaluation, disposition, reporting, trend analysis, and lessons learned work process controls. Training and informing managers, supervisors, and workers on S/CI processes and controls (including prevention, detection, and disposition of S/CIs). Identifying and disposing of S/CIs on site. Restricting S/CI use to only those items that have been found acceptable through engineering analysis and formal disposition process. Collecting, maintaining, disseminating, and using the most accurate, up-to-date information on S/CIs and associated suppliers using all available sources.
(An NQA-1 QA program will need to be expanded to address Suspect/Counterfeit items.)
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Safety Software Quality Requirements
Is your software quality assurance program based on national or international standards?
If yes, identify which ones apply below:
___ASME NQA-1, Part I, Requirement 3
___ASME NQA-1, Part I, Requirement 11
Other______________________
FORMCHECKBOX
FORMCHECKBOX
DOE Order 414.1, Attachment 2, Safety Software Quality Requirements
Does your software quality assurance program include controls for software configuration management and quality planning, software risk management, software procurement and supplier management, software requirements identification and management, software design and implementation, software verification and validation, and problem reporting and corrective action?
FORMCHECKBOX
FORMCHECKBOX
Do you understand the questions above? Yes FORMCHECKBOX No FORMCHECKBOX
If no, please provide your comments or suggestions. Also, provide any additional information relevant to your quality assurance program.
General
Preparer_____________________ Signature_______________ Title________________________
Date_________
CMRR-AP-0710-TM01, R0
Other files
| File | Type | Posted |
|---|---|---|
| ENG073_NS_FuelOilPumpsTanks.pdf | ||
| Supplier Contractor Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .