About this file

This document summarizes questions received and responses provided relating to a solicitation for operation of the Quentin Burdick Job Corps Center. The solicitation requires the contractor to operate the Job Corps Center located in Minot, North Dakota, providing academic, career technical, career success skills, and career development training for a planned onboard strength of 197 students. The contractor must also provide outreach and admissions to ensure arrival of a minimum of 625 students annually and maintain an average monthly onboard strength of 100% of the planned strength. In addition, the contractor is responsible for providing career transition services for all graduates and former enrollees from the center. The responses clarify requirements regarding child care programs, facility and equipment details, and operational responsibilities.

View the file

Other files

File Type Posted
Burdick Amendment 3 - Photos 1.zip ZIP file
Burdick Amendment 3 - Photos 2.zip ZIP file
Burdick Amendment 3.pdf PDF
Burdick Amendment 3 - Photos 3.zip ZIP file
Burdick A2.pdf PDF
Burdick A1.pdf PDF
Burdick RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OJC

BURDICK RFP QUESTIONS
#RFP SectionResponding OfficeQuestionResponse
1C.2OJCPlease confirm NEAP recruitment zone(s) for this procurement. The RFP lists the WDA areas of North and South Dakota. Does this mean the operator is free to recruit from these entire states, corresponding to zones NDRZ00 and SDRZ00?The operator is free to recruit from these entire states, corresponding to zones NDRZ00 and SDRZ00.
2C.2OJCPlease confirm that there is no requirement to operate an on center child care program or residential parent/child program. Section C.2 indicates no, but the J-9 Facility Survey makes references to these areas.As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
3C.2OJCAre there any CTT change requests currently in process or planned that would affect the CTT offerings under the new contract? If so, will these changes be completed prior to the new contract period?There are no CTT changes in progress.
4F.5OJCPlease verify the annual arrival goals for Burdick. The listed goal of 430 seems to exceed the needs for a 197 OBS center and does not seem to correspond to the formula listed in the NEAP plan.Per the NEAP Arrival Goals website, 430 arrivals for the Burdick Center is correct. https://neapmap.com/wp-content/uploads/2020/04/20.03.20-NEAP-Arrival-Goals-Spreadsheet-External.pdf
5J.9OJCSection 2.2 indicates that the lease of the property owned by the Dept. of Veterans Affairs ends June 29, 2021. Will the lease be renewed? For how long?As requested the permit will be renewed for another 10 years – June 29, 2031. The draft is currently under review right now, but is expected to be executed prior to the current expiration date.
6J.9OJCGeneral Building Conditions Facility Survey Vol.1 Section 2.4 indicates that Building 19 is leased to Minot Public Schools. Are center staff responsible for the facility maintenance, custodial services, and security of the building?Yes. Center staff is responsible for the facility maintenance, custodial services and security of the building.
7J.9OJCStudent Housing, Facility Survey Vol. 1 The 2018 Facility Survey indicates that the windows on dormitory buildings 23, 26, and 27 are damaged and allowing cold air to enter, have these windows been repaired?No. However, the issue of cold air entering via windows has been temporarily resolved. The window project is pending revision of the SOW by the ESC and funding.
8J.10/J.26OJCPlease confirm the total number of washers owned vs. leased and the total number of dryers owned vs. leased. The J-10 lists some as owned and some as leased, whereas the J-26 says all are owned. Of those owned, are they all operable?The center has 25 washers and dryers and they are fully functioning. All are owned by the center
9J.12/J.23OJCPlease clarify which utilities are included in the utility trends and totals. (e.g, water, electricity, natural gas, propane, sewage).

Electric, Water, and Natural Gas : See attached utility usage report

10n/aOJCPlease clarify if the Center is on a bus line or has any nearby public transportation. If so, what is the approximate distance to the nearest stop?Minot City Public Transit is the public transportation for the area. The nearest bus stop is two blocks from the center. Bus transportation is available from 7:00am to 7:00pm.
11C.2hOJC1. Staffing Levels: The RFP requires the listed positions in this section to be filled within 30 days of becoming vacant. Will the DOL reconsider the 30 day requirement? Some of these positions will require longer to be filled for reasons to include the need to recruit Job Corps-experienced applicants which will take longer to accomplish, especially for the Center Director; which most likely will involve relocation time.No. The 30-day period remains a requirement.
12J-11OJC1. Attachment J-11 lists inventories of expendable items such as food, clothing, and medical supplies as of the end of November 2019. Since this contract transitions during the month of November 2021, and the contract is Firm Price, does the government anticipate requiring the next contractor to purchase this inventory? Will the new contractor be required to make available the same level of inventory at the end of the contract that results from this RFP?The expendable inventory listed in attachment J-11 is an estimate. Since the incumbent contract is a cost type contract, the expendable inventory that is on hand is the property of DOL and as such will remain at the center for use of the next contractor. At the end of the fixed price contract, expendabl inventory will be the property of the incumbent contractor and it is up to the contractor to determine how the property is handled.
13n/aOJC1. Can the DOL provide a list of the remaining Operations and Maintenance (O&M) projects that will NOT be completed by the start of the new contract on 12/1/2021? If not, will the new contractor be relieved of the requirement to complete these O&M projects?78 remaining O and M projects. Please see attachment.
14J-9OJCPage 62, J-9, The Facility Survey is two years old (April 2019). Will the Government provide more information regarding the facility and whether there are any areas of large concern?A new site survey is not currently scheduled. The answer to question 13 above provides the latest information on completed and ongoing projects since the last site survey.
15J-12OJC1. Page 62, J-12, Would the Government please provide more utility information relating to the Burdick Job Corps Center? The J-12 & J-23 are significantly different. Could the total costs be broken down by utilities? (i.e. - Electricity, Water, Natural Gas, & Propane)See Utility usage attachment in Question 9.
16J-24OJCPage 63, J-24, Is the CTS Workload for PY19 and PY20 available? If so, please provide.See Attachments CTS Workload PY 19 and PY 20
17L.6.DOJC1. Page 72, L.6.D, Due to no site visit, will the Government please provide more information regarding the facility? (More than just the facility survey – i.e. videos, more photos, any areas of large concern, etc.)Yes. There were 17 photos included in the RFP, in addition to the link to the virtual tour. But we have since learned that zip files in a pdf don't work, so we will upload the photos again with this mod.
18C.2OJCPage 12 Career Technical Training Offerings: The RFP indicates that Welding (E-TAR Code WELDG-100-OJC-14) is offered by a National Training Contractor. Please confirm that Welding is offered by an NTC. Please provide the name of the National Training Contractor.Welding is a center operated trade.
19J.9OJCPage 13 The Facility Survey indicates that there is a Single Parent Dorm and Child Development Center on campus; however, the RFP indicates that On-Center Child Care and Residential Parent/Child Programs are not required as part of the contract. Please confirm that there is no requirement to administer a Residential Parent/Child Program (single parent dorm) and an On-Center Child Care Program.As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
20OJCPage 13 Child Care and Parent/Child Programs: If offerors are required to provide Child Care and Parent/Child programs, please provide any site-specific requirements and license agreements necessary to operate the programs.As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
21OJC1. Please confirm the trades noted on page 12 of the RFP. The table indicates Welding is an NTC, however a review of the CTT10 indicates it is a center trade.Welding is a center operated trade.
22C.2OJC2. Please provide information on the Souris River Campus (Alternative High School under Minot Public Schools) located on the Quentin Burdick JCC campus.

a. What age range does the Alternative High School serve?

b. Approximately how many JC students attend the Alternative High School on an annual basis?

c. Is there an MOU in place between Quentin Burdick JCC and Minot Public Schools? If so, please provide.

d. Does Quentin Burdick JCC provide any funding to Minot Public Schools for JC student attendance at the Souris River Campus?

e. Since this is a public alternative high school located on the JC campus, do students other than those attending Quentin Burdick attend the high school?

The information requested is not available. The MOU that defines the relationship between the current operator and the MPS is proprietary. Future MOUs would need to be negotiated between new interested parties as applicable.
23OJCDoes the center have any CRA or CTST projects “in progress” and will they be completed prior to the transition period? Or what is the projected completion date?CTST Projects: Bleachers, Trailer (Small House), and Small House to be completed by September 2021. CRA Projects: CRA 128612 Repair Cafeteria Generator, to be completed by 4/30/21.
24OJCWhat are the current national projects of the center? Will these be completed prior to transition, or do you have an estimated completion date?National projects include: Fire damage resolution for Building 3 and Window replacement for dormitories. Estimated completion dates are not available at this time.
25J-10OJCThe EPMS listing indicates the center has $349,607 worth of “loaned” equipment, to include computers, printers, televisions, recreation equipment etc. It appears that all of this equipment is needed to effectively run the center. Can you clarify that this in fact is “loaned” equipment and not government property?Per previous DOL instructions, 'loaned' terminology was used to differentiate between equipment purchased by Burdick ('owned') and property purchased for Burdick by the Minot Public Schools ('loaned') via MOU. All equipment identified on the “Master List” was purchased by MPS and the current operator is not required to return any of the equipment.
26J-10OJCThe EPMS listing indicates several hundred thousand dollars worth of excess, scrap, missing and “boneyard” property, will this be removed prior to transition?Yes. Items have been properly removed.
27J.9OJCThe facility survey indicates there was an issue with not having a central control panel for all HVAC, has this been completed?Yes. This was completed in 2020
28J.9OJCThe facility survey indicates there was a pending center wide security camera system project, has this been completed?Yes, the cameras are in place.
29J-12OJCAttachment J12 Utilities Usage last year and J23 Utilities Cost Trend are significantly different, can the government confirm that J12 in fact includes all utilities expense for last year?Yes. See the attachment in Question 9 above.
30C.2OJCHow many students are enrolled at Souris River Campus? Does the Center pay a fee for the students to be enrolled?The information requested is not available. The MOU that defines the relationship between the current operator and the MPS is proprietary. Future MOUs would need to be negotiated between new interested parties as applicable.
31C.2OJCIs the Welding program taught by the Center or an NTC?Welding is a center operated trade.
32C.2OJCIf the CDC is closed, are the children sent to an off campus provider?The center does not have a single parent program.
33C.2OJCWho operates the CDC daycare program?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
34C.2OJCWhat are the list of responsibilities for the contract in the management of the child development center?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
35C.2OJCIs the contractor responsible for feeding the children during the day?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
36C.2OJCIs the contractor responsible for maintaining the childcare facility licenses?Yes., this is a contractor responsibility.
37C.2OJCIs the contractor responsible for the maintenance of the child development center?Yes, this is a contractor responsibility.
38C.2OJCWhat is the maximum age for the children participating in the child development program?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
39C.2OJCWhat is the age range for children participating in the child development program?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
40C.2OJCIs the child development program open to the public, or only for those enrolled in Job Corps?As indicated in section C.2 section F, there is no requirement to oeprate a child development program.
41C.2OJCAre the single parents required to apply for state aid? And if so, is that a pre-requisite for single parent applicants before enrollment?The center does not have a single parent program.

JCAS

BURDICK RFP QUESTIONS
#RFP SectionResponding OfficeQuestionResponse
1L.6hJCASPlease confirm the delivery email for the proposal is correct as listed in the RFP: Job-Corps-Center-Operations-Proposal-Submission@dol.govThis is correct. The email address is Job-Corps-Center-Operations-Proposal-Submission@dol.gov
2J.8JCASPlease confirm the J-8 Standard Form 1413 Statement and Acknowledgement is not required to be submitted with the proposal.The SF1413 is not required to be submitted with the proposal.
3BJCAS1. The RFP describes the Contract Type for Center Operations as a FP and Price Adjustment contract. What examples/instances does the government anticipate that may cause adjustments to price, especially downward (or less than contracted)?The price adjustments for less than 100% OBS is described in Provision G.9 of the RFP.
4L.7JCASPage 77, Section L.7 directs offerors not to propose costs for Travel; and that it will be included in the “Not to Exceed” line items. Please confirm.The travel costs shall be included in the FFP for the Center Operations as described in Provision H.5 of the RFP. The conflicting provision in L.7 has been edited in this amendment.

Microsoft_Excel_97-2003_Worksheet1.xls Contract

North and South Dakota CTS DATA DECEMBER 1, 2019 TO NOVEMBER 30, 2020

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 311 155

Actual ( November) 7 0

YTD Actual 129 15

As % of planned contract year New Assignments 41.48% 9.68%

Month Grad FE Totals

December 14 2 16

January 14 2 16

February 23 1 24

March 13 4 17

April 5 1 6

May 10 3 13

June 10 1 11

July 7 0 7

August 8 1 9

September 10 0 10

October 8 0 8

November 7 0 7

Total 129 15 144

OA DATA ARRIVALS FROM DECEMBER 1, 2019 TO NOVEMBER 30, 2020

OA Goals and Performance

Contract Year Arrival Goals 517

Actual Arrivals 146

As % of Annual Goals 28.24%

Percentage of year Completed 100.00%

Month Female Arrivals Total Arrivals Female Arrival Goal Total Arrival Goal

December 3 13 11 30

January 21 59 15 42

February 18 43 17 45

March 13 31 18 47

April 0 0 18 47

May 0 0 18 47

June 0 0 15 39

July 0 0 17 45

August 0 0 17 45

September 0 0 16 44

October 0 0 16 44

November 0 0 15 42

Total 55 146 193 517

Location OA CTS

North

North Dakota CTS DATA DECEMBER 1, 2019 TO NOVEMBER 30, 2020

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 203 101

Actual ( November) 4 0

YTD Actual 84 14

As % of planned contract year New Assignments 41.38% 13.86%

Month Grad FE Totals

December 10 2 12

January 12 1 13

February 14 1 15

March 12 4 16

April 1 1 2

May 9 3 12

June 5 1 6

July 3 0 3

August 4 1 5

September 4 0 4

October 6 0 6

November 4 0 4

Total 84 14 98

OA DATA ARRIVALS FROM DECEMBER 1, 2019 TO NOVEMBER 30, 2020

OA Goals and Performance

Contract Year Arrival Goals 337

Actual Arrivals 80

As % of Annual Goals 23.74%

Percentage of year Completed 100.00%

Month Female Arrivals Total Arrivals Female Arrival Goal Total Arrivals Goal

December 2 7 8 22

January 13 34 10 27

February 13 24 11 29

March 7 15 12 31

April 0 0 12 31

May 0 0 12 31

June 0 0 9 23

July 0 0 11 29

August 0 0 11 29

September 0 0 11 29

October 0 0 11 29

November 0 0 10 27

Total 35 80 128 337

Location OA CTS

South

South Dakota CTS DATA DECEMBER 1, 2019 TO NOVEMBER 30, 2020

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 108 54

Actual ( November) 3 0

YTD Actual 45 1

As % of planned contract year New Assignments 41.67% 1.85%

Month Grad FE Totals

December 4 0 4

January 2 1 3

February 9 0 9

March 1 0 1

April 4 0 4

May 1 0 1

June 5 0 5

July 4 0 4

August 4 0 4

September 6 0 6

October 2 0 2

November 3 0 3

Total 45 1 46

MS OA DATA ARRIVALS FROM DECEMBER 1, 2019 TO NOVEMBER 30, 2020

OA Goals and Performance

Contract Year Arrival Goals 180

Actual Arrivals 66

As % of Annual Goals 36.67%

Percentage of year Completed 100.00%

Month Female Arrivals Total arrivals Female Arrival Goal Total Arrivals Goal

December 1 6 3 8

January 8 25 5 15

February 5 19 6 16

March 6 16 6 16

April 0 0 6 16

May 0 0 6 16

June 0 0 6 16

July 0 0 6 16

August 0 0 6 16

September 0 0 5 15

October 0 0 5 15

November 0 0 5 15

Total 20 66 65 180

Location OA CTS image4.emf

Microsoft_Word_Document.docx O & M ITEMS Not completed

127791

Water heater safety relief valve discharges to floor

Out Reach Admissions

111160

Downspouts are missing

Wellness

127796

Water heater safety relief valve discharges to floor

Wellness

127797

Domestic hot water pipe joints are corroded

Wellness

90775

Exterior concrete walkway/dock spalling

Carpentry Building

127799

Emergency eyewash station lacks inspection documentation

Carpentry Building

108490

Water heater safety relief valve discharges to floor

Automotive Building

127802

Emergency eyewash station lacks inspection documentation

Automotive Building

109202

Mechanical room ceiling in the central basement has gaps around penetrations or in ceiling

Souris River

126448

The central basement mechanical room ceiling has holes and gaps around pipe penetrations

Souris River

108503

Water heater safety relief valve discharges to floor

Male Dorm

127814

Exhaust ventilation system not operational

Male Dorm

108506

Water heater safety relief valve discharges to floor

Rec Center

127819

Culinary Arts Kitchen grease interceptor repair

Cafeteria/Culinary image5.emf

Usage Cost 2020.msg Usage & Cost 2020

From

Williams, Fred - ETA JC

To

Porter, Barbara - ETA

Cc

Edna Jackson

Recipients

Porter.Barbara@dol.gov; ejackson@jacksonpierce.com

Hello Barbara, Here is the break down by usage and cost per quarter for the entire year of 2020 for Electric, Natural Gas, and Water.

1st Quarter usage

1st Quarter Cost

2nd Quarter usage

2nd Quarter cost

3rd Quarter usage

3rd Quarter cost

4th Quarter usage

4th Quarter cost

Electricity

KWH

KWH

355550

$29,682.00

255976

$27,366.00

259005

$33,989.00

300041

$28,470.00

Natural Gas

CCF

56954

$27,800.00

15328

$8,307.00

$4,311.00

40763

$19,940.34

Water

Gal

Gal

1349305

$9,239.00

72560

$929.00

85575

$1,618.00

438357

$3,001.00

$66,721.00

$36,602.00

$39,918.00

$51,411.34

Fred Williams

Center Director

QUENTIN N. BURDICK JOB CORPS CENTER

1500 University Avenue West

Minot, North Dakota 58703

Office 701-857-9604

Fax 701-838-9979 image1.emf image2.emf

Microsoft_Excel_97-2003_Worksheet.xls Contract

North and South Dakota CTS DATA DECEMBER 1, 2018 TO NOVEMBER 20, 2019

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 311 155

Actual (November ) 16 0

YTD Actual 224 22

As % of planned contract year New Assignments 72.03% 14.19%

Month Grad FE Totals

December 9 1 10

January 24 0 24

February 21 2 23

March 20 2 22

April 17 3 20

May 20 2 22

June 26 2 28

July 18 0 18

August 11 2 13

September 19 3 22

October 23 5 28

November 16 0 16

Total 224 22 246

OA DATA ARRIVALS FROM DECEMBER 1, 2018 TO NOVEMBER 20, 2019

OA Goals and Performance

Contract Year Arrival Goals 517

Actual Arrivals 502

As % of Annual Goals 97.10%

Percentage of year Completed 100.00%

Month Female Arrivals Total Arrivals Female Arrival Goal Total Arrival Goal

December 9 17 8 22

January 18 49 15 42

February 20 52 17 45

March 15 31 18 47

April 12 46 18 47

May 11 43 18 47

June 21 51 15 39

July 12 39 17 45

August 10 40 17 45

September 24 50 16 44

October 18 52 16 44

November 8 32 15 42

Total 178 502 190 509

Location OA CTS

North

North Dakota CTS DATA DECEMBER 1, 2018 TO NOVEMBER 20, 2019

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 203 101

Actual (November ) 12 0

YTD Actual 138 16

As % of planned contract year New Assignments 67.98% 15.84%

Month Grad FE Totals

December 9 1 10

January 12 0 12

February 9 2 11

March 12 2 14

April 13 1 14

May 13 1 14

June 19 2 21

July 6 0 6

August 7 0 7

September 12 3 15

October 14 4 18

November 12 0 12

Total 138 16 154

OA DATA ARRIVALS FROM DECEMBER 1, 2018 TO NOVEMBER 20, 2019

OA Goals and Performance

Contract Year Arrival Goals 337

Actual Arrivals 314

As % of Annual Goals 93.18%

Percentage of year Completed 100.00%

Month Female Arrivals Total Arrivals Female Arrival Goal Total Arrivals Goal

December 9 17 8 22

January 13 33 10 27

February 9 29 11 29

March 10 20 12 31

April 6 22 12 31

May 5 25 12 31

June 16 36 9 23

July 10 27 11 29

August 8 29 11 29

September 17 36 11 29

October 10 27 11 29

November 2 13 10 27

Total 115 314 128 337

Location OA CTS

South

South Dakota CTS DATA DECEMBER 1, 2018 TO NOVEMBER 30, 2019

CTS WORKLOAD Planned / Actual

Graduates Former Enrolls

Contract TR-Planed - New Assignees 108 54

Actual (November) 4 0

YTD Actual 86 6

As % of planned contract year New Assignments 79.63% 11.11%

Month Grad FE Totals

December 0 0 0

January 12 0 12

February 12 0 12

March 8 0 8

April 4 2 6

May 7 1 8

June 7 0 7

July 12 0 12

August 4 2 6

September 7 0 7

October 9 1 10

November 4 0 4

Total 86 6 92

OA DATA ARRIVALS FROM DECEMBER 1, 2018 TO NOVEMBER 20, 2019

OA Goals and Performance

Contract Year Arrival Goals 180

Actual Arrivals 188

As % of Annual Goals 104.44%

Percentage of year Completed 100.00%

Month Female Arrivals Total arrivals Female Arrival Goal Total Arrivals Goal

December 0 0

January 5 16 5 15

February 11 23 6 16

March 5 11 6 16

April 6 24 6 16

May 6 18 6 16

June 5 15 6 16

July 2 12 6 16

August 2 11 6 16

September 7 14 5 15

October 8 25 5 15

November 6 19 5 15

Total 63 188 62 172

Location OA CTS image3.emf