A19-1605C4-26-R-00033 PWS Attachment w Dimensions.pdf

PDF 176 KB Posted

Attached to
Triadelphia - B9 Piping Project
Solicitation number
1605C4-26-R-00033
Issued by

About this file

This file contains three technical diagrams documenting ducting systems across two floors of a facility. Figure 1 illustrates Floor 1 ducting with a vertical duct assembly measuring 36 inches in total height, featuring 12-inch and 13-inch diameter sections, 24-inch spacing measurements, and a 3-inch clearance at the base. The diagram shows ducting connections to wire shelving and indicates specific dimensional points for installation or assessment purposes.

Figure 2 provides a detailed side-view of Floor 1 ducting, showing a horizontal duct measuring 24 inches in length with 12-inch diameter connections, a 2-inch offset, 5-inch height measurement, and a 20-inch depth specification. Figure 3 depicts Floor 2 ducting in a larger industrial space with an estimated 60-inch floor-to-ceiling height, featuring multiple duct sections with diameters ranging from 12 to 24 inches and vertical spacing measurements of 8, 12, 14, and 24 inches. All diagrams include orange measurement indicators and appear designed to document existing duct configurations, dimensions, and spatial relationships for maintenance, repair, or replacement purposes.

View the file

Other files

File Type Posted
A19-1605C4-26-R-00033 0001 Sol.pdf PDF
A19-1605C4-26-R-00033 Sol.pdf PDF
A19-1605C4-26-R-00033 PWS Attachment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .