Industry Day - December 2023.pdf
PDF 2 MB Posted
- Solicitation number
- 15F06724R0000013
About this file
This document outlines the Federal Bureau of Investigation's (FBI) plans to utilize Job Order Contracting (JOC) solutions for facility construction and maintenance projects. The FBI will establish two JOCs, one for the National Capital Region limited to businesses within 40 miles of Washington D.C., and one for the Criminal Justice Information Services Division in Clarksburg, West Virginia limited to businesses within 60 miles. Gordian will provide the customized Construction Task Catalogs containing over 275,000 construction tasks with preset prices. Contractors will bid Adjustment Factors applied to the Catalog pricing. The one year base JOCs may have a total value of $24.5 million over five years. Gordian will offer implementation support, training, price proposal review, reporting, and ongoing program management to maximize the JOCs and ensure transparency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Attendance Roster.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FBI INDUSTRY DAY
JOB ORDER CONTRACTING
(JOC) SOLUTIONS
December 13, 2023
• Introductions
• Construction Procurement Challenges
• The Role of Job Order Contracting
• Why Gordian JOC
• JOC Program Implementation
• Ongoing Program Support
• Questions & Next Steps
AGENDA
• National Capital Region JOC
• Competitive local small business set-aside limited to businesses within a
40-mile radius of the J. Edgar Hoover Building
• Top Secret Facilities Clearance Required
• One year base with four option years
• Maximum total contract value of $24,500,000.00
• Task orders range from $10,000 - $350,000
• Criminal Justice Information Services JOC
• Competitive local small business set-aside limited to businesses within a
60-mile radius of the CJIS Division (Clarksburg, WV)
FBI
Introductions and Key Points
CONSTRUCTION
PROCUREMENT
CHALLENGES
COMMON CHALLENGES FOR FACILITIES AND PROCUREMENT
Process delays and difficulty getting “quality” contractors to respond or engage
Addressing critical backlog in a timely manner amidst cost controls and change orders
Rising costs have potentially reduced spending power
Creating accurate construction and maintenance cost estimates
Meeting project timelines and budgets
Staff issues due to peak volume, too many projects or retirements
Lack of transparency or auditability of inclusion programs
THE ROLE OF
JOB ORDER CONTRACTING
DIFFERENT DELIVERY METHODS FOR DIFFERENT PROJECTS
In-House Staff Unit Price/IDIQ
Contracts Design-Bid-
Build
Time and Materials
Construction Management (CM) at Risk
Design-Build Job Order
Contracting
MOST SUCCESSFUL JOB PROJECT TYPES
Straightforward new construction
Repairs Renovations Replacement in-kind
Maintenance AlterationsEmergency work
Time sensitive projects
JOB ORDER CONTRACTING (JOC)
• Indefinite delivery/indefinite quantity (IDIQ) process
• Enables contractors to complete a substantial number of individual projects with a single bid
• Tasks based on competitively-bid, preset prices in a Unit Price Book (UPB)
• Contractors bid an Adjustment Factor(s) to be applied to UPB, resulting in awarded contractor readily available to perform work at agreed upon prices
• Saves time and money
• Provides transparency and auditability
Definition
Value
Job Order Contracting Solicitation Process
Typical Project Solicitation Process
Project A
Extensive
Solicitation Process
Contract A
Project B
Contract B
Project C
Contract C
More Contracts & Steps = More Time & Money
Extensive
Solicitation Process
Extensive
Solicitation Process
Solicitation Process
Project A Project B Project C
Single Job Order Contract for Multiple Projects
JOC Value: Time and Resource Savings
In 2021, Gordian and NIGP: The Institute for Public Procurement partnered to close the industry’s JOC knowledge gap.
JOC
Benefits
Simplifies the procurement process
Faster response time
Improves the quality of work
Preset pricing eliminates negotiations
Increases local subcontractor participation
Fully transparent process
Saves time and money Reduces change orders
Why Gordian JOC
BUILT WITH INSIGHTS, TECHNOLOGY & EXPERTISE
Data & Insights
Gordian cost data experts develop a custom, local UPB for each JOC contract
Construction Task Catalog® (CTC) has over 275,000 accurate construction tasks with preset prices.
Ongoing project and program insights
Technology
Software built from decades of industry experience
Transparent and auditable
Easily manage the functions of the construction procurement process
Allows collaboration between owner and contractor
Expertise
Gordian’s founder created the original Job Order Contracting process in 1982
Implemented and administered hundreds of successful programs
Dedicated onsite field personnel review proposals to ensure project success.
More than $3.2B in construction value is completed through Gordian’s Job Order Contracting solution annually.
JOC Program Implementation Support
Job Order Initiation
Owner and Contractor
Training
Bid Process
Outreach Program Design
JOC Program Implementation Ongoing Support
JOC
PROGRAM
IMPLEMENTATION
CONSTRUCTION TASK CATALOG (CTC)®
• Catalog of Pre-Priced Construction Tasks
•Organized by Construction Specifications Institute (CSI)
• Based on Local Labor, Material & Equipment Costs
• The tasks represent the “Scope of Work” for the contract
CONSTRUCTION TASK
The Construction Task Catalog®
•Contractor must review and understand “Using the Construction Task Catalog®”
•Rules of the game
•Make sure you get paid for all appropriate tasks
•Pages 00 – 1 to 00-6 of the CTC
CONTRACTOR’S ADJUSTMENT FACTOR TO CTC
Importance of Adjustment Factors:What is an Adjustment Factor?
• Determines winning bidder
• Used to price individual job orders
• Includes all Contractor’s Business and Project Related Costs, inclusive of Bonding and Insurance, Secured
Areas consideration, and
Subcontractor’s Overhead and Profit
• Price proposal total becomes the lump sum job order amount
• An Adjustment Factor is a multiplier applied to the construction tasks that may increase or decrease the prices listed in the CTC.
• Contractors may bid multiple Adjustment Factors (normal working hours, other than normal working hours, etc.) that are applied to all Tasks in the CTC.
• Adjustment Factors should include all direct and indirect costs not included in the preset prices, and the contractor’s overhead and profit.
ADJUSTMENT FACTOR | TOTAL JOB ORDER PRICE
BID TAB (SAMPLE) | ADJUSTMENT FACTORS
Rank Bidder Normal Hours
Adjustment Factor (Non- Acute)
Normal Hours Adjustment
Factor (Acute)
Non Pre- Priced
Adjustment Factor
Calculated Combined
Adjustment Factor
Contractor A 1.2500 1.2800 1.2000 1.2435
Contractor B 1.2800 1.3300 1.2500 1.2867
Contractor C 1.3100 1.3900 1.2500 1.3167
Contractor D 1.4125 1.4725 1.2825 1.3892
Contractor E 1.5000 2.2500 1.1500 1.6150
ONGOING PROGRAM SUPPORT:
OWNER AND CONTRACTOR
TRAINING
JOC ON
eGordian
• Instant access to your customized CTC
• Quality Control measures to ensure contract compliance
• Task and prices input directly
• Version histories of every Price
Proposal
• Reports generated to communicate with contractors around line-item revisions
• Milestone tracking
Gordian JOC solutions include access to our secure, web-based software, eGordian.
1 2 53 4
5 STEP JOB ORDER PROCESS
JOB ORDER INITIATION
PRICE PROPOSAL – TYPICAL PROJECT
• Approved Price Proposal
• Project schedule
• Subcontractors list
• Any additional required doc’s
TRACKING JOC PROGRAM SUCCESS
• JOC on eGordian provides visibility into program progress and goal tracking.
• KPIs can be established to measure the success of the program and provide tools for continuous improvement.
EXPERIENCED JOC EXPERTS TO
SUPPORT OWNER AND
CONTRACTOR
Gordian can help you maximize your Job Order Contracting program with:
• Ongoing training
• Program management
• Price proposal reviews
• Customizing Construction Task Catalog
• Contractor procurement support
• Reporting and tracking
REVIEW OF KEY POINTS
• Gordian is the creator of Job Order Contracting
• No upfront cost, minimum purchase or usage requirements
• Convenient “Umbrella” contract
• Proprietary software enables transparency and auditability
• Construction Task Catalog® ensures prices certainty
• Measurable performance standards
• Fully integrated delivery solution with JOC-specific cost data, software and expertise
• Ongoing Program Support
Questions & Next Steps
For more information, contact
Kelli Vetter Account Manager Federal Solutions K.Vetter@Gordian.com
| Slide 1: FBI INDUSTRY DAY JOB ORDER CONTRACTING (JOC) SOLUTIONS |
| Slide 2: AGENDA |
| Slide 3: FBI Introductions and Key Points |
| Slide 4: CONSTRUCTION PROCUREMENT CHALLENGES |
| Slide 5: COMMON CHALLENGES FOR FACILITIES AND PROCUREMENT |
| Slide 6: THE ROLE OF JOB ORDER CONTRACTING |
| Slide 7: DIFFERENT DELIVERY METHODS FOR DIFFERENT PROJECTS |
| Slide 8: MOST SUCCESSFUL JOB PROJECT TYPES |
| Slide 9: JOB ORDER CONTRACTING (JOC) |
| Slide 10: Job Order Contracting Solicitation Process |
| Slide 11: JOC Value: Time and Resource Savings |
| Slide 12: JOC Benefits |
| Slide 13: Why Gordian JOC |
| Slide 14: BUILT WITH INSIGHTS, TECHNOLOGY & EXPERTISE |
| Slide 15: JOC Program Implementation Support |
| Slide 16: JOC PROGRAM IMPLEMENTATION |
| Slide 17: CONSTRUCTION TASK CATALOG (CTC)® |
| Slide 18: CONSTRUCTION TASK |
| Slide 19: The Construction Task Catalog® |
| Slide 20: CONTRACTOR’S ADJUSTMENT FACTOR TO CTC |
| Slide 21: ADJUSTMENT FACTOR | TOTAL JOB ORDER PRICE |
| Slide 22: BID TAB (SAMPLE) | ADJUSTMENT FACTORS |
| Slide 23: ONGOING PROGRAM SUPPORT: OWNER AND CONTRACTOR TRAINING |
| Slide 24: JOC ON eGordian |
| Slide 25: 5 STEP JOB ORDER PROCESS |
| Slide 26: PRICE PROPOSAL – TYPICAL PROJECT |
| Slide 27: TRACKING JOC PROGRAM SUCCESS |
| Slide 28: EXPERIENCED JOC EXPERTS TO SUPPORT OWNER AND CONTRACTOR |
| Slide 29: REVIEW OF KEY POINTS |
| Slide 30: Questions & Next Steps For more information, contact Kelli Vetter Account Manager Federal Solutions K.Vetter@Gordian.com |