A02 Flight Simulator SOO 11 05 2026.pdf
PDF 145 KB Posted
- Attached to
- FLIGHT TRAINING DEVICES
- Solicitation number
- 15DDHQ27Q00000019
About this file
This is a Statement of Objectives (SOO) for the Drug Enforcement Administration (DEA) Aviation Division's Flight Training Devices procurement.
The DEA requires two modern, non-motion, FAA-approved Flight Training Devices (FTDs) to be delivered and installed at the DEA Aviation Operations Center in Fort Worth, Texas. The first FTD shall simulate a Cessna T206H aircraft with Garmin G1000 avionics, and the second shall simulate a Beechcraft King Air B300 with Garmin G1000 avionics. Both devices must be Advanced Aviation Training Devices (AATDs) meeting FAA Advisory Circular 61-136B and 14 CFR 61.4(c), certified under FAA sections 61 and 141, and capable of providing flight training credit to student pilots. Each FTD must include an enclosed flight deck replica with realistic cockpit instrumentation, controls, displays, and systems; FAA-certified or equivalent Garmin displays; instructor-controlled weather and environmental simulation; and a minimum 180-degree high-definition visual display system. The contractor must provide user manuals, system diagrams, FAA certification documentation, training for operations and technical support personnel, and travel/personnel support for installation and training at the Fort Worth facility. The devices must be endorsed by the aircraft manufacturers or supported by documentation confirming conformance to aircraft specifications. Delivery and full operational capability must occur within eight months of contract award. The facility offers a 46-foot by 26-foot by 9-foot climate-controlled room with loading dock access, 15K forklift availability, dedicated electrical power (six 120V 30-amp circuits), and high-speed internet connectivity. The contractor bears total program responsibility, must designate a single point of contact for the Contracting Officer and Representative, and shall warrant all work for a minimum of one year post-acceptance, transferable to the Government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A28 RFQ 15DDHQ27Q00000019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
DRUG ENFORCEMENT ADMINISTRATION
AVIATION DIVISION
FLIGHT TRAINING DEVICES
1.0 OVERVIEW
The U.S. Department of Justice, Drug Enforcement Administration (DEA) Aviation Division (SG) has a requirement for two (2) modern, non-motion Federal Aviation Administration (FAA) approved Flight
Training Devices (FTD). One FTD shall be representative of a Cessna T206H with a Garmin G1000
Avionics System and the second FTD shall be representative of a Beechcraft King Air B300 with a Garmin
G1000 Avionics System.
2.0 SCOPE
This Statement of Objectives (SOO) establishes the requirements for the FTDs. The FTDs shall include a quality visual graphic system for both visual and instrument flight simulation training. The FTDs shall be
FAA certified under Federal Aviation Regulations Section 61 and 141, that meet the requirements for a student pilot to receive “Flight Training Credit” as related under FAA 141.41 to meet the guidelines FAA
61.65(h)(2). The FTDs shall be able to replicate all phases of flight for both visual and instrument conditions and function in all areas required for instrument training. The FTDs shall not be a simple desk-top computer stand-alone design. The FTDs shall be constructed to represent a realistic cockpit to include, but not limited to, instruments, displays, switches, flight controls and any other items to replicate the flight deck of the aircraft referenced in this requirement.
The FTDs shall be endorsed by the aircraft manufacturers Cessna Aircraft Company and Beechcraft
Corporation or have supporting documentation affirming that the FTD conforms to each aircraft’s specifications, limitations, performance and handling.
3.0 PERFORMANCE REQUIREMENTS
3.1 BEECHCRAFT KING AIR B300, GARMIN G1000 AVIONICS SYSTEM
A. The Contractor shall provide a non-motion FTD that simulates the operation of a Beechcraft
B300 aircraft with a Garmin G1000 avionics system as approved under STC number
SA01535WI-D.
B. The FTD shall have an enclosed flight deck that is a replica of a Beechcraft B300 aircraft to include, but not limited to: flight controls, engine controls, aircraft systems controls, flight and engine instruments and displays, autopilot, navigation and communication displays, switches, electrical panels and any other items to replicate the aircraft’s cockpit.
C. The FTD shall utilize FAA certified Garmin G1000 displays or displays that emulate the features and functions of certified Garmin components.
D. The FTD shall include simulation of weather, environment and aircraft systems at the control of the pilot instructor.
E. The FTD shall provide a visual graphic system that replicates views outside the aircraft in all phases of flight for ground, visual and instrument flight simulation training with a minimum 180 degrees High-Definition visual flight display.
F. The FTD shall be an AATD that meets AC 61-136B and 14 CFR 61.4(c).
G. The FTD shall be FAA approved under sections 61 and 141.
H. The Contractor shall provide all applicable user manuals and system diagrams to support utilization, maintenance, repair and system updates.
I. The Contractor shall provide FTD system training for both operations and technical support personnel.
J. The Contractor shall provide all certification documents as required by applicable FAA regulations for the appropriate level of certification.
K. The Contractor shall provide travel and personnel support for system installation, instructor operation, and support technician training at 2300 Horizon Drive, Fort
Worth, TX 76177.
3.2 CESSNA T206H, GARMIN G1000 AVIONICS SYSTEM
A. The manufacturer shall provide a non-motion FTD that simulates the operation of a Cessna
T206H with a Garmin G1000 avionics system as manufactured by Cessna Aircraft Corp.
B. The FTD shall have an enclosed flight deck that is a replica of a Cessna T206H aircraft with a
Garmin G1000 avionics system to include but not limited to flight controls, engine controls, aircraft systems controls, flight and engine instruments and displays, autopilot, navigation and communication displays, switches, electrical panels and any other items to replicate the aircraft’s cockpit.
C. The FTD shall utilize FAA certified Garmin G1000 displays, or displays that emulate the features and functions of certified Garmin components
D. The FTD shall include simulation of weather, environment and aircraft systems at the control of the pilot instructor.
E. The FTD shall provide a visual graphic system that replicates views outside the aircraft in all phases of flight for ground, visual and instrument flight simulation training with a minimum 180 degrees High-Definition visual flight display.
F. The FTD shall be an AATD that meets AC 61-136B and 14 CFR 61.4(c).
G. The FTD shall be FAA approved under sections 61 and 141.
H. The Contractor shall provide all applicable user manuals and system diagrams to support utilization, maintenance, repair and system updates.
I. The Contractor shall provide FTD system training for both operations and technical support personnel.
J. The Contractor shall provide all certification documents as required by applicable FAA regulations for the appropriate level of certification.
K. The Contractor shall provide travel and personnel support for system installation, instructor operation, and support technician training at 2300 Horizon Drive, Fort
Worth, TX 76177.
4.0 PERIOD OF PERFORMANCE AND PLACE OF PERFORMANCE
Offerors shall outline their expected delivery date as part of their technical proposal, which shall be evaluated by the Government. The delivery date proposed must be within eight (8) months of the expected award date, which will be provided in the solicitation. Upon acceptance and contract award, the
Contractor’s proposed schedule shall be incorporated into the contract.
5.0 APPLICABLE STANDARDS AND REGULATIONS
Any applicable U. S. Federal Aviation Administration Federal Aviation Regulations.
6.0 REQUIREMENTS AND DELIVERABLES
The delivery and installation of the fully functional FTDs as described in section 3.0 Performance
Requirements shall occur at the DEA’s Aviation Division facility at the Fort Worth Alliance Airport in Fort
Worth, TX.
The Contractor shall provide any technical specifications data, engineering and design documentation in both electronic and paper format. Once delivered under this contract, all data, engineering design drawings, FAA approvals and any associated documentation shall be the property of the U.S. Government.
7.0 DELIVERY AND FACILITY INFORMATION
A. Delivery:
The Contractor shall deliver and install fully functional FTDs to the DEA Aviation
Operations Center (AOC) at the following address:
DEA Aviation Operations Center
2300 Horizon Drive
Fort Worth, Texas 76177-5300
B. Facility Information:
The AOC facilities and structural information are as follows:
Loading/Unloading dock available
Forklift (up to 15K) available
No stairs between loading dock and installation location.
Room Size:
Length: 46 feet
Width: 26 feet
Height: 9 feet
Climate controlled
Door Sizes:
Loading dock to Simulator Room doors:
Width: 9 feet
Height: 10 feet
Simulator Room Door:
Width: 66 inches
Height: 84 inches
Electrical Power:
Dedicated Simulator120V 30 amp X 6
Available 120V 20 amp X 8
High Speed Internet:
LAN connection points X 4
Wi-Fi available
8.0 INSPECTION AND ACCEPTANCE
a. Fully configured Flight Training Devices as described in this SOO shall be 100% operational prior to the Government’s acceptance. No partial deliveries will be accepted. The Government will indicate acceptance in writing. The contractor may not invoice for the FTD until such written acceptance by the Government is received by the contractor.
b. The Contractor shall be responsible for certification of the Flight Training Devices in accordance with any applicable FAA regulations and as described in this SOO.
9.0 PROGRAM RESPONSIBILITY
The Contractor shall have total program responsibility for ensuring that the requirements defined in this
SOO are accomplished. The Contractor shall provide program, technical, manufacturing, engineering and liaison management. The Contractor shall identify a single focal point of contact to interface with the
Contracting Officer and Contracting Officer’s Representative (COR). The contractor management shall track program cost, schedule and overall performance to bring this requirement to a successful completion.
The Contractor shall immediately notify the COR of any program schedule delays.
10.0 TECHNICAL SUPPORT AND DESIGN COORDINATION
The Contractor shall serve as the overall technical lead for this requirement and shall provide technical oversight of any subcontractors to ensure compliance with this SOO. The Contractor shall coordinate the engineering design of all systems, installations, test plans and FAA approvals and certifications for the government based upon this SOO.
The Contractor shall ensure that the government has the opportunity to participate in and approve design and procurement decisions as required by this SOO.
11.0 WARRANTY
In addition to any standard Original Equipment Manufacturers warranty, the Contractor shall warrant that all work furnished pursuant to this SOO strictly conforms to applicable specifications, drawings, descriptions, and other requirements of this SOO and is free from defects in design, material, and workmanship. All warrantees shall be transferable to the Government and shall extend for a minimum period of one (1) year after final acceptance of the Flight Training Devices by the Government unless a different period is agreed to in writing by both the Government and the Contractor.
File details come from the government source that posted it. Updated .