This solicitation seeks a firm-fixed-price construction contract for a medium temperature hot water line replacement project at the Federal Correctional Institution in Minersville, Pennsylvania. The contractor shall provide all labor, materials and equipment to replace the existing medium temperature hot water system that serves heating and domestic hot water needs at the facility. The scope of work includes selective demolition, earthwork, installation of pipes and appurtenances, selective interior pipe replacement, restoration, erosion control and associated work. The solicitation is set aside exclusively for small businesses with a size standard of $45 million. The estimated value of the contract is between $5,000,000 to $10,000,000. Interested parties must be registered in the System for Award Management to receive solicitation documents distributed solely through that website. The deadline for bids is July 25, 2023. The contracting agency is the Department of Justice Bureau of Prisons Field Acquisition Office.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TAB 1 - Abstract of Offers - Schuylkill - completed box 6.pdf | ||
| TAB 1 - Abstract of Offers - Schuylkill.pdf | ||
| 2 - Amend 0001 - SF30.pdf | ||
| 2 - Amend 0001 - Att - Questions and Answers.pdf | ||
| 1 - Solicitation - Instruction to Bidders.pdf | ||
| 1 - Solicitation - FINAL.pdf | ||
| 1 - Attachment 5 - Criminal History Check Form.pdf | ||
| 1 - Attachment 6 - Bid Bond.pdf | ||
| 1 - Attachment 4 - WD - PA20230063 - 04.07.2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID CONFERENCE MEETING MINUTES
15BFA023B00000021 – Medium Temperature Hot Water Line
Replacement FCI Schuylkill - PROJECT 23Z2AP6
1 | P a g e
DATE: Wednesday, June 28, at 9:00 A.M.
Place: Computer Lab
CONTRACTING OFFICER (JOSHUA GARDNER, SCS):
I. INTRODUCTIONS:
Round table introduction of all attendees.
II. PURPOSE OF MEETING:
The purpose of this meeting is to familiarize the contractor with the unique circumstances and requirements surrounding a correctional setting. This meeting is also to explain the solicitation, as issued, and not to furnish additional information.
Nothing said here shall be interpreted as a change to the solicitation without the issuance of a formal amendment through the FAO Contracting Officer, Trisha Holm.
III. MINUTES:
Meeting minutes will be recorded and distributed via https://sam.gov.
IV. SITE VISIT INFORMATION:
Walk to selected site(s) for Hot Water Loop Install immediately following the meeting.
V. FRONT COVER PAGE FORMS AND INSTRUCTIONS:
Note the instructions on the cover letter in the Solicitation and all bids sent by mail shall be addressed to:
FEDERAL BUREAU OF PRISONS
Field Acquisition Office (FAO) U.S. Armed Forces Reserve Complex ATTN: Trisha Holm 346 Marine Forces Drive Grand Prairie, TX 75051
Replacement FCI Schuylkill - PROJECT 23Z2AP6
2 | P a g e
VI. TIME FRAMES AND LOCATION FOR SUBMISSION OF BIDS:
The deadline for submission of bids for this project is Tuesday, July 25, 2023, by 1:15 p.m. CST to the above-mentioned address.
VII. GENERAL TOPICS:
The following submission/completion items will be addressed:
1. From the solicitation, each bidder SHALL complete and submit the following.
forms, clauses, and statements with his/her bid. Failure to do so may cause your bid to be considered as non-responsive:
STANDARD FORM 1442 Pages 1 & 2: Please include Unique Entity Identifier, Tax ID# and e-mail address where indicated in block 10 and complete blocks 14- 20c. If your company has a “doing business as” name reflected in you SAM registration, include this name as well in Block 14. Ensure the address typed in block 14 matches the address in your SAM registration.
COMMODITY OR SERVICES SCHEDULE (PAGE 4): Complete the Unit Price (JB = job) and Amount blocks (these amounts will be the same). Note: The amounts listed in this section should be the same as the amount listed in block 17 of the SF-1442.
BID GUARANTEE: See Page 5 of the solicitation. A bid bond must be submitted in original (ink signatures) with your solicitation. The penal sum of the bond must be at least 20% of the bid price, not to exceed $3 million, whichever is less. A blank bid bond was included in the solicitation. The bid bond must be from a government approved surety. A list of approved sureties can be located on the Department of Treasury, Bureau of the Fiscal Service website.
REPRESENTATIONS AND CERTIFICATIONS: All contractors submitting a bid must be registered in the System for Award Management (SAM) at https://sam.gov with the North American Industry Classification Standard code (NAICS) 237110 which is applicable to this acquisition.
FAR PROVISION 52.204-8: Pursuant to the section (b) (1) of this provision, consider provision 52.204-7 is included in this solicitation. Therefore, bidders should NOT mark either of the two options under section (b)(2).
FAR PROVISION 52.204-24: Pursuant to the section of this provision, (d). Bidder shall complete item (d)(1)&(2) as applicable.
3 | P a g e
FAR PROVISION 52.209-7: Bidder shall complete item (b) as applicable.
FAR PROVISION 52.209-12: Bidder shall complete item (b) as applicable.
FAR PROVISION 52.209-13: Pursuant to section (b) of this provision, Certification. Bidder shall check either (1) or (2).
FAR PROVISION 52.229-11: Pursuant to section (d) of this provision, Certification. Bidder shall Complete item (d)(1)&(2) as applicable.
PAST PERFORMANCE SUBMISSION: Please ensure the Cover letter is reviewed and complied with its entirety. References and banking submissions must be submitted in advance to the bid opening directly to tmanderson@bop.gov via email.
AMENDMENTS: Amendments (if any) must be acknowledged and submitted with the bid by one of the methods as described in item eleven of the Standard Form 30.
2. Other general items to be addressed:
Wage Rate Requirements (Construction): This contract is subject to the Construction Wage Rate Requirements. Wage Decision PA20230063 is applicable for this area. All applicable workers must be paid according to the terms of the wage decision.
HIRING GOALS: Hiring goals for this project are 14.5% for minorities and 6.9% for females – A “Good Faith” effort should be put forth by the contractor to achieve these goals.
LICENSING AND PERMITS: All required licensing and permits are required to be obtained by the contractor who receives contract award.
MAGNITUDE: The magnitude of the project is between $5,000,000 and $10,000,000.
WORK HOURS: Work hours within the secure perimeter shall be between 6:00 am and 4:30 pm Monday through Friday excluding weekends and federal holidays.
COR: The Contracting Officer’s Representative (COR) is Corey Zanolini, 4 | P a g e
Facility Manager.
PERIOD OF PERFORMANCE: The completion period is 308 calendar days after issuance of notice to proceed.
TIME EXTENSIONS: Time extensions for inclement weather will not be granted unless the weather is unusually severe and abnormal in comparison to prior years.
LIQUIDATED DAMAGES: Liquidated damages for this project are in the amount of $1,099.30 per calendar day of delay after scheduled completion.
PRE-CONSTRUCTION CONFERENCE: A Pre-Construction conference is required after the contract is awarded and will be scheduled accordingly.
PROGRESS SCHEDULE: A copy of the progress schedule is to be provided to the Contracting Officer and COR as soon as possible. Each time the progress schedule is changed, it must be provided to both the Contracting Officer and COR. It is suggested an updated document be provided by the Prime Contractor at the mandatory monthly progress meeting.
PROGRESS MEETINGS: Progress meetings are mandatory and will be scheduled monthly.
PAYMENT REQUESTS: Application for payments are to be submitted on AIA G702(Continuation) or the contractors own form as long as the information is similar to the G702. Contactors can get these forms from the following website www.aiabookstore.com
QUESTIONS: Oral questions asked at Site Visit of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. All questions shall be sent in WORD FORMAT to Trisha Holm, FAO Contracting Officer, via email at tmanderson@bop.gov. In order to provide sufficient response time prior to the bid due date, the Government has establishing that questions be submitted no later than Friday, June 30, 2023 at 11:00 am, CST.
ACCESS TO SITE/PARKING OF VEHICLES: Parking will be provided for employee vehicles and contractor work vehicles.
STORAGE OF MATERIALS: Storage of materials will be coordinated with the
COR.
5 | P a g e
CONTRACTOR TEMPORARY OFFICE: No temporary office space will be provided.
INSPECTIONS: "Punch List" items generated by inspections will be corrected and discrepancy items re-inspected and approved before contract closure takes place. Should any work be covered without proper notification, the contractor shall uncover that work for inspection at his own expense.
SAFETY MANAGER (JOSHUA GARDNER, SCS):
3. SAFETY POINTS:
The contractor is responsible for providing required protective gear to all contractor workers, should it be required. Contractor will ensure that all workers always have proper safety gear.
Contractor is responsible for the prevention of accidents on the project site and has spill kit onsite and containment procedures. OSHA requirements will be adhered to.
The Contractor will always have a Safety Representative on site during the completion of this project.
Proper storage of any chemicals in lay down yard with SDS present.
CAPTAIN (JOSHUA GARDNER, SCS):
4. SECURITY
ADVERSE WEATHER: Whenever adverse weather conditions or other institution emergency contingencies are in effect; contract workers will not be permitted passage into the secure institution. Should emergency conditions be implemented while contract workers are inside the secure perimeter, they will be required to secure their tools, remove vehicles and equipment, and leave the institution grounds until the emergency has been resolved.
Depending upon the nature of the emergency, this normally will not affect any construction outside of the secure perimeter. Contractor is reminded that fog days will be treated like rain days. The performance period of 308 days will allow adequate time
6 | P a g e to complete the job, and no consideration will be allowed for normal rain days and normal fog days. The normal rain, snow or fog days will be based on the average over the last ten (10) years for the local community.
SECURITY CLEARANCES: Contract workers are subject to security investigative procedures. Please refer to the contract for details. Please refer to Page 8 of the solicitation.
EMPLOYEE IDENTIFICATION: Contractor personnel working on project site must bring valid photo identification to the institution each day. The identification will be surrendered upon entry to and returned upon exit from institution property.
TOOL ACCOUNTABILITY: Strict accountability and control of all contractor tools and hazardous materials must be always maintained. All contractor tools to be used inside the secure perimeter must be inventoried and accounted for at the conclusion of the workday Contractor tools may not be stored on-site overnight.
The contractor should provide for enough time at the conclusion of the workday for the return and accounting of all tools issued during the work day. Lost or missing tools must be reported to the COR the Captain immediately.
ILLEGAL ITEMS ON FEDERAL PROPERTY: Firearms, ammunition, knives, other weapons, drugs, narcotics, and alcoholic beverages are not permitted inside/outside the secure perimeter or anywhere else on Federal property at any time. This includes the private vehicles of contract workers. Violators will be subject to criminal prosecution. All persons, vehicles, and equipment are subject to search by institution authorities at any time.
NO CONTACT WITH INMATES: Contract workers are not to have any contact with inmates at any time. No photographs may be taken of inmates.
CONTRACTOR EMPLOYEE WORK DRESS: Green or khaki-colored clothing is not allowed, as inmates wear these colors.
PHOTOGRAPHS: The institution’s Facilities Department maintains a digital camera that will be utilized by FBOP staff to document the project work. The Contractor may request copies of these photos and may request that photos be taken for specific conditions. Cellular telephones equipped with photographic capabilities are prohibited on the project construction site.
7 | P a g e
VIII. ADDITIONAL DISCUSSION:
After the brief Mr. Aceto & Mr. Vashon discussed the Blueprints & Layout. Areas Discussed.
The work to be performed consists of 75% Outside work and 25% Inside Work.
Explained specifics of how the current system functions.
Existing pipes will be used for temporary heat.
Discussed how inside excavation can be problematic.
New system distributes from outside.
Replacing all below grade piping.
New inground pipe is Polypropylene and not Steel.
Max operating temperature of the system is 190 degrees.
Meeting minutes recorded by:
Joshua Gardner, Supervisory Contract Specialist FCI Schuylkill
NOTICE:
MEETING MINUTES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY.
THEY ARE NOT INTENDED TO CHANGE ANY SPECIFICATIONS, TERMS OR
CONDITIONS OF THE SOLICITATION. ANY AND ALL CHANGES TO THE
SOLICITATION SHALL BE ISSUED IN SUBSEQUENT AMENDMENTS ISSUED BY
THE CONTRACTING OFFICER ON A STANDARD FORM 30 (SF-30).
JOSHUA GARDNER
Digitally signed by JOSHUA
GARDNER
Date: 2023.06.28 12:16:10 -04'00'