Amendment 00001- Questions and Responses.pdf

PDF 247 KB Posted

Attached to
FCI La Tuna- Repair SPC Roofs Federal contract opportunity
Solicitation number
15BFA023B00000019
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

This document provides responses to questions received regarding solicitation number 15BFA023B00000019 from the Department of Justice Bureau of Prisons Field Acquisition Office to repair specialty polyurethane coat roofs at Federal Correctional Institution La Tuna. The solicitation requires offerors to remove and replace all insulation on three buildings and apply a three-ply roofing system. The questions and answers clarify that the substrate is the metal deck, not the insulation, and reiterate the requirement for a three-ply system with no consideration given to alternative warranties or volatile organic compound-free two-ply systems due to occupational requirements.

View the file

Other files for this federal contract opportunity

Other files attached to FCI La Tuna- Repair SPC Roofs, newest first.
File Type Posted
Bid Abstract.pdf PDF
Amendment 0001- Pre-Bid Conference Minutes.pdf PDF
Wage Determination TX20230245 Modification 3.pdf PDF
SF24- Bid Bond Form.pdf PDF
Solicitation.pdf PDF
Attachment 5 - Criminal History Check Form.pdf PDF
Instructions to Bidders.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

00001

BFAO

Patrick Ford, Contracting Officer

This amendment is to incorporate the responses to the questions received.

No other changes at this time.

Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, TX 75051

15BFA023B00000019

15B51023PR000096

15BFA023B00000019

23Z5AH4

1 2

08/01/2023

07/06/2023

QUESTIONS AND ANSWERS

FCI LA TUNA

15BFA023B00000019 – PROJECT 5AH4

Submitted by U.S Diversified Contracting Services:

Question 1:

Does original substrate mean the insulation or the metal deck?

CLARIFICATION: The substrate is the metal deck.

Question 2:

The SOW says replace all insulation. The notes in the drawings point to exact locations where insulation should be replaced on all three buildings. Are we to replace ALL insulation or just damaged insulation where noted?

CLARIFICATION: The Statement of Work in Section A, paragraph A.2 states the requirement is to remove and replace all insulation.

Submitted by The Garland Company:

Question 1:

Are you open to considering a substitution for a system that can offer the owner a 30 Year NDL (No Dollar Limit) warranty?

CLARIFICATION: The posted specifications represent what is required.

Question 2:

Would you be interested in exploring the option of switching to a 2-ply system with No VOCs (Volatile Organic Compounds), especially considering that the facility is currently occupied and operational? Traditional hot apply methods tend to emit strong odors and contain VOCs, which could be a concern in this scenario.

CLARIFICATION: The 3 ply is required as stated outlined in the Statement of Work in sections A, B, and D.