Questions and Answers Danbury Replace Switchgear.pdf
PDF 7 MB Posted
- Attached to
- FCI Danbury - Replace Switchgear Federal contract opportunity
- Solicitation number
- 15BFA023B00000010
About this file
This document contains questions and answers regarding a solicitation for replacing switchgear at the Federal Correctional Institution in Danbury, Connecticut. The solicitation seeks to award a firm-fixed-price construction contract to replace the switchgear, main distribution panels, and accessories inside the facility's Food Services electrical room. Clarification is provided that the solicitation description contains a clerical error and will be edited to correctly reference replacing the switchgear rather than a generator. Additional clarification addresses the allowed duration for a power shutdown contingent on temporary power provisions. The North American Industry Classification System code applicable is 238210 for the electrical contractor industry with a small business size standard of $19 million. The solicitation is set aside exclusively for small businesses and will be distributed solely through the System for Award Management website.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers - FCI Danbury - Replace Switchgear .pdf | ||
| Amendment 0001.pdf | ||
| Pre-Bid Meeting Minutes and Sign in Sheet.pdf | ||
| Construction Wage Determination 6-16-23.pdf | ||
| Instruction to Bidders.pdf | ||
| Construction Wage Determination 6-9-23.pdf | ||
| SF-24 Bid Bond Form.pdf | ||
| Solicitation.pdf | ||
| 1 - Attachment 4 - Criminal History Check Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI Danbury – Replace Switchgear
PROJECT 23Z2AQ9 QUESTIONS & ANSWERS
SOLICITATION 15BFA023B00000010
1. If possible, please provide panels schedules and one line diagram of existing electrical equipment?
CLARIFICATION: See attached, panel schedules and existing line diagram
2. What is the allowed time duration for a shutdown of power?
CLARIFICATION: Contingent on the temporary power provided in section 8 page 3 of the Statement of Work
3. On the Solicitation in Section 2 – Commodity or Services Schedule, the description reads Replace Generator.
CLARIFICATION: The clerical error in the description will be edited to read replace Swithchgear.
| Questions Danbury Replace Switchgear |
| Answers |
| Answer 2 |
| Answers 3 |
| Answers 4 |
| Answers 5 |
| Answers 6 |