Questions and Answer VIX.pdf
PDF 124 KB Posted
- Attached to
- Upgrade PLC System FCI2/USP at FCC Victorville
- Solicitation number
- 15BFA022B00000016
About this file
This document contains questions and answers regarding a solicitation to upgrade the programmable logic controller (PLC) system at two federal correctional facilities in Victorville, California. The Federal Bureau of Prisons is seeking a firm-fixed-price contract to replace the existing PLC hardware and software with a new system. While the statement of work allows for alternative PLC platforms, proposers must follow the approval process outlined in the solicitation provisions. The Bureau of Prisons will provide the existing design documentation, including I/O lists and ladder logic diagrams. All existing field wiring is assumed to be in good working condition except where specified for replacement. Interested vendors must register in the System for Award Management as a small business to be eligible for this 100% small business set-aside. The period of performance is 291 calendar days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 00003.pdf | ||
| AMEND 0002 VIX.pdf | ||
| 5 - Construction Wage Rate 08052022.pdf | ||
| Site Visit Meeting Minutes.pdf | ||
| AMEND 0001 VIX.pdf | ||
| 2 - Solicitation.pdf | ||
| 7 - Criminal History Check Form.pdf | ||
| 1 - Instructions to Bidders.pdf | ||
| 6 - SF24 Bid Bond.pdf | ||
| 5 - Construction Wage Rate.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCC VICTORVILLE – UPGRADE PLC SYSTEM FCI2/USP
PROJECT 22Z6AD2 QUESTIONS & ANSWERS
SOLICITATION 15BFA022B00000016
SUBMITTED BY KREDIT AUTOMATION & CONTROLS:
1. We have reviewed the Statement of Work for the project. Will the DOJ-BOP consider a replacement system solution using Rockwell Automation hardware & software? Is there more information about the “approval process” required for another PLC platform?
CLARIFICATION: Please refer to Solicitation clause JAR 2852.211-70 and Provision
FAR 52.211-6.
SUBMITTED BY FASONE CONSTRUCTION:
2. Are there any existing controls, process or instrumentation documents?
CLARIFICATION: Yes, we have prints as well as the ladder logic for the current system.
3. Is there a list of inputs and outputs for existing systems?
CLARIFICATION: Yes, we have the existing installation prints.
We have approx. 3824 inputs and approx. 2896 outputs at the USP. We have approx.
1520 inputs and approx. 2384 outputs at the FCI II.
4. Can we anticipate existing wiring is in good condition?
CLARIFICATION: All existing wiring is assumed to be in good condition, but wiring from interface boards to PLC shall be replace as defined in SOW section B.1.