REQUEST FOR INFORMATION.pdf
PDF 60 KB Posted
- Attached to
- DAYTON MANOR- Hot Water Heater Replacement
- Solicitation number
- 15BBR023Q00000015
About this file
This document contains a request for information related to a federal contract opportunity for hot water heater replacement. The request for information pertains to building codes and gas line requirements for the replacement of water heaters at the Dayton Manor facility operated by the Department of Justice Bureau of Prisons Metropolitan Detention Center Brooklyn. Specifically, the request confirms that all applicable New York City and state building codes apply to the project and that the existing gas lines do not need to be removed to access the replacement water heaters, with the gas line access point located in the rear of the building. No permits are required to be filed. The related federal contract opportunity is solicitation number 15BBR023Q00000015 for hot water heater replacement services at the Dayton Manor location managed by the Bureau of Prisons Metropolitan Detention Center Brooklyn within the Department of Justice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CONTRACTOR INFORMATION SHEET (1).pdf | ||
| WAGE DETERMINATION 05-10-2023.pdf | ||
| SOW DAYTON MANOR HOT WATER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
1. Which building codes apply?
- All NYC and & NYC State Codes apply.
- You don’t have to file for any permits.
2. Will the gas lines also need to be removed before water heater installation?
- Gas lines don’t need to be removed. Access point is in the rear.
File details come from the government source that posted it. Updated .