5 - Price Summary Spreadsheets.pdf

PDF 202 KB Posted

Attached to
FCC Allenwood - Replace HVAC Units - Project 26Z2BE3
Solicitation number
15BBNF26Q20100004
Issued by

About this file

This document is a pricing template for federal contract proposals that requires contractors to submit detailed cost breakdowns in accordance with Federal Acquisition Regulation (FAR) 15.4 to ensure fair and reasonable pricing.

The template consists of three primary spreadsheets that must accompany all proposals. The Prime Contractor Cost Summary captures only work performed by the prime contractor using its own forces, excluding subcontracted work. The Subcontractor Price Summary must be completed separately for each subcontractor involved in the proposal. The Final Price Summary consolidates all charges from the prime contractor and all subcontractors, with all monetary figures required to match the individual documents. Each spreadsheet requires detailed line-item breakdowns including unit of measure, quantity, labor rates per hour, equipment costs per unit, and material costs per unit, with calculated line-item totals. Contractors must include proposed overhead and profit percentages, noting that profit may only be claimed by the entity performing work with its own forces—the prime contractor for work it performs directly and each subcontractor for work they perform without lower-tier subcontractors. The template includes provisions for additional line items as needed. The Final Price Summary section requires completion of a Collective Price Analysis Summary that organizes costs by materials, labor, equipment, indirect expenses for both prime and subcontractors, general and administrative costs including bond and insurance, and a net total. All sections mandate completion of the solicitation number and project title fields.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SUMMARY SPREADSHEETS

In accordance with Federal Acquisition Regulation (FAR) 15.4 the objective of proposal analysis is to ensure the final agreed to price is fair and reasonable. The complexity and magnitude of each acquisition determines the level of analysis required.

Your proposal must be accompanied by the attached documents as applicable:

A. The first document is for your firm as the prime contractor. This breakdown is only for the work the prime will perform with its own forces (i.e., without subcontractors).

B. The second document is for subcontractor work only. This document should be completed for each subcontractor.

C. The third document is the Final Price Summary. This will include all charges from you as the prime and all subcontractors. All numbers must coincide with the previous documents monetarily.

A few notes:

*You may add additional lines if needed.

*Ensure you include your proposed percentages (%) in the lower blocks

ENSURE YOU COMPLETE ALL BLOCKS TO INCLUDE SOLICITATION NUMBER AND PROJECT TITLE.

PRIME CONTRACTOR COST SUMMARY

SOLICITATION NUMBER: PROJECT TITLE:

# DESCRIPTION UOM

(hours/feet/each, etc.)

QTY LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position] [hours] [#] [$] - - $ [insert equipment] [each] [#] - [$] - $

[insert material] [each/feet/etc.] [#] - - [$] $

NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).

SUBTOTAL: $

OVERHEAD (0%): $

PROFIT (0%): $

TOTAL: $

SUBCONTRACTOR PRICE SUMMARY

SOLICITATION NUMBER:

SUBCONTRACTOR NAME:

PROJECT TITLE:

# DESCRIPTION UOM

(hours/feet/each, etc.)

QTY LABOR $

PER HOUR

EQUIPMENT $

PER UNIT

MATERIALS $

PER UNIT

LINE ITEM TOTALS $

[insert labor position] [hours] [#] [$] - - $ [insert equipment] [each] [#] - [$] - $

[insert material] [each/feet/etc.] [#] - - [$] $

NOTE: Profit is only charged by either the Prime or Subcontractor(s) respectively for the actual segment(s) of the work they complete with their own forces. In other words, the Prime may include profit on the work it performs by itself (without subcontractors) and the Subcontractor(s) may include profit on the work they perform themselves (without lower tier subcontractors).

SUBTOTAL: $

OVERHEAD (0%): $

PROFIT (0%): $

TOTAL: $

FINAL PRICE SUMMARY

SOLICITATION NUMBER: PROJECT TITLE:

INDIVIDUAL TOTALS $

A1 SUBCONTRACTOR:

(COMPANY NAME HERE)

A2 SUBCONTRACTOR:

(COMPANY NAME HERE)

A3 SUBCONTRACTOR:

(COMPANY NAME HERE)

B SUBTOTAL (A1+A2+A3): $

C PRIME CONTRACTOR:

(TYPE NAME HERE)

D SUBTOTAL (B+C): $

E INSURANCE (0% of D) $

F SUBTOTAL (D+E) $

G BOND (0% of F): $

GRAND TOTAL (F+G): $

PLEASE COMPLETE THE FOLLOWING:

COLLECTIVE PRICE ANALYSIS SUMMARY

MATERIAL S

LABOR

EQUIPMENT

INDIRECT EXPENSES – Prime (Overhead, Profit) INDIRECT EXPENSES – Subcontractor(s) (Overhead & Profit)

SUBTOTAL COST

GENERAL AND ADMINISTRATIVE

(Bond, Insurance)

NET TOTAL