Abstract - Signed.pdf
PDF 284 KB Posted
- Attached to
- Replace Chillers 1, 2 & 3 Federal contract opportunity
- Solicitation number
- 15BBNF26B00000005
About this file
Summary: Abstract of Offers - Construction
This is an Abstract of Offers for Construction (Optional Form 1419), a federal procurement document issued by the US Armed Forces Reserve Complex Field Acquisition Office in Grand Prairie, Texas. The solicitation number is 15BBNF26B00000005 for the project titled "FDC Miami - Replace Chillers 1, 2, & 3 - 25Z5AF6." The solicitation was issued on 12/19/2025 with an opening date of 02/11/2026. The contracting officer is Julie Bergami. Two amendments (0001 and 0002) were acknowledged by all offerors.
The abstract documents six competitive bids for a single construction item (Replace Chillers 1, 2, & 3) valued at approximately $4.2 to $4.4 million. Offer No. 1 is from Weathertrol Maintenance Corp. at $4,269,000.00, and Offer No. 2 is from HI ALIF LLC at $3,250,000.00. The continuation sheet details four additional offerors: Peachtree Mechanical Inc. ($4,369,669.00), DoubleDay Engineering, LLC ($4,380,000.00), South Alabama Contracting LLC ($4,227,698.00), and Marrero, Couvilton & Associates, LLC ($4,177,997.00). All bidders submitted 20% bid bonds and acknowledged the contract amendments. The government estimate for the work was $4,269,000.00, with all bids submitted on a lump sum (JB) basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 3 - FL2025-215 10-03-2025.pdf | ||
| Attachment 4 - Criminal History Check Form.pdf | ||
| Attachment 5 - SF-24 Bid Bond.pdf | ||
| Instructions to Bidders.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
15BBNF26B00000005
FDC MIAMI - REPLACE
CHILLERS 1, 2, & 3 - 25Z5AF6
Bid Bond - 20% Bid Bond - 20% Bid Bond - 20% Bid Bond - 20%
0001, 0002 0001, 0002 0001, 0002 0001, 0002
4,369,669.00 4,369,669.00 4,380,000.00 4,380,000.00 4,227,698.00 4,227,698.00 4,177,997.81 4,177,997.81
Peachtree Mechanical Inc. DoubleDay Engineering, LLC South Alabama Contracting LLC Marrero, Couvillon & Associates, LLC