This is a Questions and Answers document for a federal fire safety inspection contract with the Bureau of Prisons (BOP).

The contract requires annual fire system inspections at a BOP facility, including sprinkler system testing in January, alarm system testing in March, and quantity/nozzle servicing with two visits scheduled for April and September 2027. The period of performance runs from the award date through September 2027. Line item 0003 on the SF 1449 requires correction, as it shows quantity zero but the Statement of Work and bid sheet require two service visits. For kitchen hood nozzles, the contractor must replace or clean based on inspector findings regarding nozzle condition rather than replacing all nozzles automatically. The contracting officer will utilize CPARS for past performance evaluation, and contractors are encouraged to list any prior Government entity or FBOP facility experience. Each inspection visit may be invoiced separately. The correct NAICS code is 561621 (with an updated SF 1449 to be uploaded), and an updated Wage Determination 2015-5617, Revision 28 will be provided. The prime contractor must meet applicable size standards; the award was previously issued under notice 15B61825P00000105 covering the same requirements. An escort team will be provided on the inspection day, and NCIC clearance typically takes 1-4 business days. Portable toilets will be made available, and daily/weekly construction-style reports are required only on an as-needed basis since inspections typically complete in one day. Submissions should be sent to ATW-Facilities-S@bop.gov in single-PDF format.

View the file

Other files

File Type Posted
RFQ USP Atwater Rev.1 (NAICS updated).pdf PDF
RFQ USP Atwater.pdf PDF
ATW- Fire Inspection-SOW.pdf PDF
Annual Fire Bid Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. Will BOP provide access codes and software access for the Simplex fire alarm panels, or does testing require a Simplex-authorized technician?

This will depend on the need to access the software during the inspection of the alarm system; I will send this over to our team and try to get more clarification.

2. FAR 52.219-14 limits subcontracting on services. May the 50% requirement be met with similarly situated small business subcontractors?

This award will be issued to a prime contractor that has met the size standards related to the NAICS list in the announcement.

3. Are the device counts and kitchen hood counts final for pricing, and will device location lists or prior inspection reports be provided?

Prior reports may be issued depending on accessibility, these records are not held in this office, but we can try to recover past results.

4. How long does NCIC clearance take before personnel may enter, and is escort provided by the institution?

An escort team is required and will be provided on the day if the inspection, the NCIC check typically take 1-4 business days depending.

5. Is the period of performance FY27 (Jan-Sep 2027) for all three line items?

Each inspection date is listed on the bid form depending on the type, this POP will become effective the date of award and through Sept of 2027.

1. Quantity and nozzle servicing: SF1449 line 0003 shows quantity zero, while the SOW/bid sheet require two visits. Please confirm two visits in April and September 2027, with sprinkler testing in January and alarm testing in March. For hood nozzles, does the SOW’s “replace or clean” language govern, or is replacement of every nozzle required?

You are correct, there are 2 service requirements for line 0003. Please utilize the Annual Fire Bid Sheet for your bid and the SF 1449 for the Vendor information.

For the hood, this will depend on the condition of each nozzle based off of the inspectors findings.

2. Submission and NAICS: Please confirm the required recipient(s) and single-PDF format; the notice identifies your email, while the SOW identifies ATW-Facilities-mailto:ATW-Facilities-S@bop.gov

S@bop.gov. Please also reconcile NAICS 541350 on the SF1449 with 561621 in the notice.

The NAICS 561621 is the correct one, an updated SF1449 will be uploaded into the solicitation.

3. Labor and site requirements: Please provide the applicable Wage Determination 2015-5617, Revision 28. Do the contractor-provided portable toilets, weekly servicing, and daily/weekly construction-style reports apply to these inspection visits?

For the WD 2015-5617 see attached. Toilets will be made available for contractors, this inspection is typically complete in one day as it is listed in the SOW, thus the reports will only be required on an as needed basis.

4. Technical pricing information: Are redacted previous reports/device lists available showing Simplex models, access heights, ANSUL models and nozzle/link counts, and the fire-pump testing arrangement? Please identify any required five-year testing or corrective repairs beyond the stated annual inspection and specified consumables.

5. Access and evaluation: Will escorts support simultaneous testing teams, and is a prequotation site visit available or required? What past-performance information should accompany the quote, and will relevant subcontractor references be considered?

Past performance reports will be utilized by the Contracting Officer via CPARS (if available), contractors are encouraged to list any Government entity or FBOP facility they have performed this service for in the past.

6. Billing and prior scope: May accepted visits be invoiced separately? Please also confirm whether prior awards 15B61825P00000105 and 15B61824P00000079 covered the same systems, quantities, and service visits.

Each visit can be invoiced separately, I can confirm that yes, this is the same requirement as it is listed in award notice 15B61825P00000105, I am unable to determine the other notice at this time.