Additional Questions and Answer LOX 2.pdf

PDF 59 KB Posted

Attached to
RENOVATION OF FOOD SERVICE BUILDING AT FCC LOMPOC
Solicitation number
15B61721B00000001
Issued by

About this file

This document provides details for a solicitation seeking construction services for the renovation of a food service building at the Federal Correctional Complex in Lompoc, California. The solicitation will award a firm-fixed-price construction contract to renovate approximately 5,789 square feet of an existing pre-engineered metal building containing kitchen and dining areas. Scope of work includes replacing the metal roofing and siding, providing new wall and roof insulation, constructing a new cantilevered block wall and foundation at the building perimeter, installing new windows, doors and exterior finishes, reconfiguring the kitchen area, constructing two new restrooms and remodeling an existing restroom and office, replacing suspended ceilings and installing new lighting, power, plumbing, and mechanical systems. Additional requirements include providing new kitchen equipment and walk-in freezer, reconfiguring the fire sprinkler system, and installing a new fire alarm system. The performance period is 365 calendar days with a deadline of under $5 million. The solicitation is designated as a 100% small business set-aside for NAICS 236220 construction firms registered as small in SAM.gov.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
AMEND 0003 LOX.pdf PDF
Site Visit Meeting Minutes.pdf PDF
AMEND 0002 LOX.pdf PDF
Questions and Answer LOX.pdf PDF
AMEND 0001 LOX.pdf PDF
7 - Criminal History Check Form.pdf PDF
2 - Solicitation.pdf PDF
1 - Instructions to Bidders.pdf PDF
5 - Construction Wage Rate.pdf PDF
6 - SF24 Bid Bond.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCC LOMPOC – RENOVATION OF FOOD SERVICE BUILDING

PROJECT 6D9R QUESTIONS & ANSWERS

SOLICITATION 15B61721B00000001

SUBMITTED BY MX CONSTRUCTION, INC.:

1. In review of Amendment 1, Updated Drawings, Changes to the Drawings page 2, Drawing A8.2 Interior Details states “Added details 8 & 9”. Drawing A8.2 Interior Details does not have detail 8 & 9. Please advise if Details 8 & 9 will be issued?

Change:

Sheet A8.2 was excluded in Addendum 1. Details 8 & 9 were included in this sheet.

This sheet is issued as Addendum 2

File details come from the government source that posted it. Updated .