Questions and Answer SDC.pdf
PDF 63 KB Posted
- Attached to
- Install Gun Lockers at MCC San Diego Federal contract opportunity
- Solicitation number
- 15B61021B00000001
About this file
This document contains questions and answers related to a federal solicitation for construction services. The Metropolitan Correctional Center in San Diego is seeking a contractor to install gun lockers at the facility over a 184-day performance period. The solicitation is a 100% small business set-aside with a NAICS code of 236220 and size standard of $39.5 million. Interested contractors must register as a small business on SAM.gov and monitor the website for additional solicitation documents and amendments. The questions and answers provide clarification on the scope of work including integration with existing security and fire alarm systems, working hours, and confirmation that no hazardous materials are present.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| 5 - Construction Wage Rate 12-11-2020.pdf | ||
| Site Visit Meeting Minutes.pdf | ||
| 8 - Photos.pdf | ||
| AMEND 0001 SDC.pdf | ||
| 6 - SF24 Bid Bond.pdf | ||
| 2 - Solicitation.pdf | ||
| 5 - Construction Wage Rate.pdf | ||
| 1 - Instructions to Bidders.pdf | ||
| 7 - Criminal History Check Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCC SAN DIEGO – INSTALL GUN LOCKERS
PROJECT 6D7P QUESTIONS & ANSWERS
SOLICITATION 15B61021B00000001
SUBMITTED BY OCS CONSTRUCTION SERVICES, INC.:
1. Please provide project photos of the garage area, to include but not limited to electrical panels, ceiling area, fire line, sprinklers, walls and concrete slab Also need photos of Comm Room and Control Room.
CLARIFICATION: See attached photos.
2. Who is your current Fire Alarm Contractor that services your building?
CLARIFICATION: Siemens
3. Scope of work for this project includes new intercom stations, door contacts and interface with door hardware for the gun lockers. Contractor is responsible for integrating the new devices with existing monitoring and control systems.
Please provide current low voltage contractor currently working on these systems for your facility. Also, please provide Security Contractor as well.
CLARIFICATION: All work is completed in house. In the event a low voltage security contractor is needed. We use tech support for those systems/ issued
4. Are there any As-built Drawings
CLARIFICATION: Yes
5. Working Hours and does all workers need to sign in at the lobby prior to working in the Gun Locker area?
CLARIFICATION: Working hours are from 6am to 2pm. All contractors need to check in prior.
6. Sheet A/3.0 Note 2 call for new ADA Ramp and Landing and per Detail 5/A6.1 Please confirm if this project will require an ADA ramp.
CLARIFICATION: MCC San Diego has to comply with all federal ADA Requirements.
SUBMITTED BY BLUE NOSE CONSTRUCTION:
7. Siemens recently announced discontinuation of the Siemens MXL fire alarm product line including all MXL fire alarm control panel components and MXL compatible initiating devices such as photoelectric smoke detectors, addressable manual pull stations and various input modules (see Siemens POA-03-16 and Siemens POA 01-13). Modification or extension of an existing Siemens fire alarm control panel would first require migration of the existing Siemens MXL fire alarm control panel to the newer Siemens Desigo series of fire alarm control panels.
All existing MXL compatible field devices and notification appliances would remain and tie into the new Siemens Desigo Fire Alarm. Would MCC San Diego modify scope of work to include a migration only of Siemens MXL fire alarm control panel to the Siemens Desigo fire alarm control panel?
CLARIFICATION: MCC San Diego can supply the smoke detector. Adding the device to the system will need Siemens or authorized Siemens representative,
8. What is the existing available spare capacity for notification appliances on the Siemens MXL fire alarm system?
CLARIFICATION: The fire alarm has plenty of spare capacity. Siemens will need to add new devices to the MXL program.
9. Sheet FA0.1, General Notes Section 3, requires contractor to update the fire alarm device map in the command center to reflect new devices and locations. Is the fire alarm device map a customized and engineered LED graphical fire alarm annunciator type map? Or is the map a basic floor plan print out with device locations?
CLARIFICATION: Basic floor diagrams
10. Does the area of work contain any asbestos or other hazardous materials?
CLARIFICATION: NO
11. Will work be performed during normal hours only?
CLARIFICATION: Yes
12. Will MCC San Diego require fire alarm and security system interface or any door lock release?
CLARIFICATION: Yes. All components being added in the scope of work will be integrated to existing systems.