This document is a federal solicitation for a Professional Driving Academy Commercial Driver's License (CDL) Training contract for the Federal Correctional Institution in Texarkana, Texas. The solicitation (Number 15B51525Q00000013) seeks a contractor to provide CDL training for inmates, with an estimated 2-3 training sessions of 16-24 students per session, each lasting 4 weeks at 40 hours per week. The contract will be firm-fixed price, with evaluation factors including price (weighted higher) and past performance.
Key details include a solicitation release date of April 15, 2025, with quotes due by May 2, 2025, at 3:00 PM Central Time via email. The anticipated award date is May 5, 2025. The procurement is set aside 100% for small businesses, with the NAICS code 611310 and a size standard of $30.5 million. Contractors must be registered in the System for Award Management (SAM), able to accept government purchase cards, and comply with various federal requirements including personnel security, privacy, and information system security provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW CDL Training FY-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U. S. Department of Justice
Federal Bureau of Prisons
Federal Correctional Institution
4001 Leopard Drive Texarkana, Texas 75501
April 15, 2025
RE: Professional Driving Academy for FCI Texarkana
Dear Quoter, The Federal Bureau of Prisons, Federal Correctional Institution, Texarkana, Texas, intends to issue solicitation 15B51525Q00000013 for Professional Driving Academy – CDL Training. The NAICS code or this requirement is 611310.
The contract type will be Firm-Fixed Price. The evaluation factors are Price and Past Performance.
Price will be rated higher than Past Performance. The Government will award all items to one responsible offeror whose offer conforms to the solicitation and is most advantageous to the Government. Failure to deliver within the established time frames will be considered as Non- Conformance under the contract terms and subject to termination.
The solicitation will be made available on or about April 15, 2025, and will be posted in www.sam.gov in the Contract Opportunities section. All future information regarding this acquisition, including solicitation amendments, will be distributed solely through this website.
The anticipated date for receipt of quote is May 2, 2025, at 3:00 P.M. Central Standard Time via e-mail to Tex-ProcurementProp-s@bop.gov.
Each offeror is required per FAR 52.212-3 to complete their representations and certifications via www.sam.gov. All responsible vendors may submit a proposal which will be considered. The anticipated date of award is May 5, 2025.
FCI Texarkana, Contracting Office, P.O. Box 9500, Texarkana Texas, 75505-9500 (903)838-4587 or Tex-ProcurementProp-S@bop.gov
Points of Contact (Do not send quotes to these e-mails)
Galo Morlet, Supervisory Contract Specialist, gmorlet@bop.gov ext 508 Luciana Williams, Procurement Property Specialist, L15williams@bop.gov ext 219 http://www.sam.gov/ mailto:Tex-ProcurementProp-s@bop.gov http://www.sam.gov/ mailto:Tex-ProcurementProp-S@bop.gov mailto:gmorlet@bop.gov mailto:L15williams@bop.gov
April 15, 2025
RE: Professional Driving Academy for FCI Texarkana
Dear Quoter:
Attached is the Request for Quotation for the Professional Driving Academy for the Federal Correctional Institution in Texarkana, Texas.
This Package contains all the necessary information for submitting a request for a quote for evaluation. The following forms, clauses, and statements must be completed and submitted with your offer:
A. Standard Form 1449
B. Instructions to Offerors – Commercial Products and Commercial Services
All potential offerors and quoters are required to be registered in System for Award Management (SAM) at time an offer or quotation is submitted in order to comply with the annual representation and certification requirements [(FAR 4.1102 Policy 01/17/2025)]. Offerors and quoters shall include their Unique Entity Identifier (UEI) in their quotes (FAR 52.212-1(j). The Contracting Officer will verify registration before award by entering the potential awardee’s UEI number into the SAM’s database. Failure to complete the registration procedures outlined in this clause will result in elimination from consideration for an award. Offerors and quoters are asked to comply with the specifications on the solicitation. Substitutions will not be accepted.
Offerors and quoters must be able to accept Government purchase cards for payment. The form of payment is solely at the discretion of the Contracting Officer.
The evaluation factors are Price and Past Performance (i.e. poor past performance, failure to deliver awarded items within timelines, not meeting required specifications, etc.). The Price will be rated higher than Past Performance. The Government will award items in groups as described in the solicitation, to one or more offerors whose offer conforms to the solicitation and is the most advantageous to the Government.
Failure to deliver awarded items within the established time frames in the solicitation will be considered as non-conformance under terms of the contract and the order may be canceled.
Quotes shall be received on or before the deadline of May 2, 2025, at 3:00 P.M. Central Standard Time via e-mail to Tex-ProcurementpProp-s@bop.gov mailto:Tex-ProcurementpProp-s@bop.gov
Points of Contact (Do not send quotes to these e-mails)
Galo Morlet, Supervisory Contract Specialist, gmorlet@bop.gov ext 508 Luciana Williams, Procurement Property Specialist, L15williams@bop.gov ext. 219 mailto:gmorlet@bop.gov mailto:L15williams@bop.gov
15B51525Q00000013 Page 1 of 38
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.
1. REQUISITION NUMBER PAGE 1 OF
5. SOLICITATION NUMBER
15B51525Q00000013
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
04/15/2025
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Galo Morlet gmorlet@bop.gov
b. TELEPHONE NUMBER (No collect calls)
903-838-4587
8. OFFER DUE DATE / LOCAL
TIME
05/02/2025 15:00 CT
CODE 15B515
Federal Bureau of Prisons
FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR
X SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
8(A)
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
611310
SIZE STANDARD:
$30,500,000.00
10. THE ACQUISITION IS
SEE SCHEDULE
11. DELIVERY FOR FREE ON BOARD
(FOB) DESTINATION UNLESS
BLOCK IS MARKED
NET 30
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER THE
DEFENSE PRIORITIES AND
ALLOCATIONS SYSTEM -
DPAS (15 CFR 700)
13b. RATING
X REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
14. METHOD OF SOLICITATION
CODE15. DELIVER TO CODE BTEX16. ADMINISTERED BY
Federal Bureau of Prisons FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
Galo Morlet
(O) 903-838-4587 gmorlet@bop.gov
FACILITY
CODE
CODE
TELEPHONE NUMBER
17a. CONTRACTOR/
OFFEROR
BTEXCODE18a. PAYMENT WILL BE MADE BY
Federal Bureau of Prisons FCI Texarkana
4001 LEOPARD DRIVE
Texarkana, TX 75501
Galo Morlet
(O) 903-838-4587 Invoices to gmorlet@bop.gov -dcusumano@bop.gov
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Provision for Professional Driving Academy CDL Training will provide services for the inmates incarcerated at the Federal Correctional Institution located in Texarkana, Texas in according to the attached Statement of Work.
Firm Fixed Price
See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
X 27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
X ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REFERENCE _____________________________
OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK
5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print)
Galo Morlet
31c. DATE SIGNED
06/06/2024
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
UEI:______________________
e-mail:___________________________
XX
15B51525Q00000013 Page 2 of 38
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
PARTIAL FINAL
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
COMPLETE PARTIAL FINAL
36. PAYMENT 37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 11/2021) BACK
15B51525Q00000013 Page 3 of 38
Table of Contents
Section Description Page Number
Solicitation/Contract Form 1 Commodity or Services Schedule 2 Contract Clauses
52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012) DOJ-01 Whistleblower Information Distribution (Oct 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021) DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (Jan 2025) 52.202-1 Definitions (Jun 2020) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)
BOP 2852.242-71 EVALUATION OF CONTRACTOR PERFORMANCE UTILIZING CPARS
(APR 2011)
3 List of Attachments 4 Solicitation Provisions
52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020)
15B51525Q00000013 Page 4 of 38
Section 1 - Commodity or Services Schedule
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 The Bureau of Prisons, Federal Correctional Institution, Texarkana, Texas, intends to establish a Purchase Order Contract for the provision of a Professional Driving Academy.
PSC: U006
Line Period of Performance: 06/01/2025 - 09/30/2025
12 SS $________ $_________________
15B51525Q00000013 Page 5 of 38
Section 2 - Contract Clauses
52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights--
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
15B51525Q00000013 Page 6 of 38
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer--System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer--Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.--
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
15B51525Q00000013 Page 7 of 38
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109 , which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.
destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction
15B51525Q00000013 Page 8 of 38 of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C.
40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, 15B51525Q00000013 Page 9 of 38 fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
A.1 ADDENDUM TO FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023)
The terms and conditions for the following clauses are hereby incorporated into this solicitation and resulting contract as an addendum to FAR clause 52.212-4.
Clauses By Full Text
52.249-2 Termination for Convenience of the Government (Fixed-Price) (Apr 2012)
(a) The Government may terminate performance of work under this contract in whole or, from time to time, in part if the Contracting Officer determines that a termination is in the Government's interest. The Contracting Officer shall terminate by delivering to the Contractor a Notice of Termination specifying the extent of termination and the effective date.
(b) After receipt of a Notice of Termination, and except as directed by the Contracting Officer, the Contractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this clause:
(1) Stop work as specified in the notice.
(2) Place no further subcontracts or orders (referred to as subcontracts in this clause) for materials, services, or facilities, except as necessary to complete the continued portion of the contract.
(3) Terminate all subcontracts to the extent they relate to the work terminated.
(4) Assign to the Government, as directed by the Contracting Officer, all right, title, and interest of the Contractor under the subcontracts terminated, in which case the Government shall have the right to settle or to pay any termination settlement proposal arising out of those terminations.
15B51525Q00000013 Page 10 of 38
(5) With approval or ratification to the extent required by the Contracting Officer, settle all outstanding liabilities and termination settlement proposals arising from the termination of subcontracts; the approval or ratification will be final for purposes of this clause.
(6) As directed by the Contracting Officer, transfer title and deliver to the Government--
(i) The fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced or acquired for the work terminated; and
(ii) The completed or partially completed plans, drawings, information, and other property that, if the contract had been completed, would be required to be furnished to the Government.
(7) Complete performance of the work not terminated.
(8) Take any action that may be necessary, or that the Contracting Officer may direct, for the protection and preservation of the property related to this contract that is in the possession of the Contractor and in which the Government has or may acquire an interest.
(9) Use its best efforts to sell, as directed or authorized by the Contracting Officer, any property of the types referred to in paragraph (b)(6) of this clause; provided, however, that the Contractor (i) is not required to extend credit to any purchaser and (ii) may acquire the property under the conditions prescribed by, and at prices approved by, the Contracting Officer.
The proceeds of any transfer or disposition will be applied to reduce any payments to be made by the Government under this contract, credited to the price or cost of the work, or paid in any other manner directed by the Contracting Officer.
(c) The Contractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 120-day period.
(d) After expiration of the plant clearance period as defined in Subpart 49.001 of the Federal Acquisition Regulation, the Contractor may submit to the Contracting Officer a list, certified as to quantity and quality, of termination inventory not previously disposed of, excluding items authorized for disposition by the Contracting Officer. The Contractor may request the Government to remove those items or enter into an agreement for their storage. Within 15 days, the Government will accept title to those items and remove them or enter into a storage agreement. The Contracting Officer may verify the list upon removal of the items, or if stored, within 45 days from submission of the list, and shall correct the list, as necessary, before final settlement.
(e) After termination, the Contractor shall submit a final termination settlement proposal to the Contracting Officer in the form and with the certification prescribed by the Contracting Officer. The Contractor shall submit the proposal promptly, but no later than 1 year from the effective date of termination, unless extended in writing by the Contracting Officer upon written request of the Contractor within this 1-year period. However, if the Contracting Officer determines that the facts justify it, a termination settlement proposal may be received and acted on after 1 year or any extension. If the Contractor fails to submit the proposal within the time allowed, the Contracting Officer may determine, on the basis of information available, the amount, if any, due the Contractor because of the termination and shall pay the amount determined.
(f) Subject to paragraph (e) of this clause, the Contractor and the Contracting Officer may agree upon the whole or any part of the amount to be paid or remaining to be paid because of the termination. The amount may include a reasonable allowance for profit on work done. However, the agreed amount, whether under this paragraph (f) or paragraph (g) of this clause, exclusive of costs shown in paragraph (g)(3) of this clause, may not exceed the total contract price as reduced by (1) the amount of payments previously made and (2) the contract price of work not terminated. The contract shall be modified, and the Contractor paid the agreed amount. Paragraph (g) of this clause shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.
(g) If the Contractor and the Contracting Officer fail to agree on the whole amount to be paid because of the termination of work, the Contracting Officer shall pay the Contractor the amounts determined by the Contracting Officer as follows, but without duplication of any amounts agreed on under paragraph (f) of this clause:
(1) The contract price for completed supplies or services accepted by the Government (or sold or acquired under paragraph (b)(9) of this clause) not previously paid for, adjusted for any saving of freight and other charges.
(2) The total of--
15B51525Q00000013 Page 11 of 38
(i) The costs incurred in the performance of the work terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs attributable to supplies or services paid or to be paid under paragraph (g)(1) of this clause;
(ii) The cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the contract if not included in subdivision (g)(2)(i) of this clause; and
(iii) A sum, as profit on subdivision (g)(2)(i) of this clause, determined by the Contracting Officer under 49.202 of the Federal Acquisition Regulation, in effect on the date of this contract, to be fair and reasonable; however, if it appears that the Contractor would have sustained a loss on the entire contract had it been completed, the Contracting Officer shall allow no profit under this subdivision (g)(2)(iii) and shall reduce the settlement to reflect the indicated rate of loss.
(3) The reasonable costs of settlement of the work terminated, including--
(i) Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data;
(ii) The termination and settlement of subcontracts (excluding the amounts of such settlements); and
(iii) Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of the termination inventory.
(h) Except for normal spoilage, and except to the extent that the Government expressly assumed the risk of loss, the Contracting Officer shall exclude from the amounts payable to the Contractor under paragraph (g) of this clause, the fair value as determined by the Contracting Officer, for the loss of the Government property.
(i) The cost principles and procedures of part 31 of the Federal Acquisition Regulation, in effect on the date of this contract, shall govern all costs claimed, agreed to, or determined under this clause.
(j) The Contractor shall have the right of appeal, under the Disputes clause, from any determination made by the Contracting Officer under paragraph (e), (g), or (l) of this clause, except that if the Contractor failed to submit the termination settlement proposal or request for equitable adjustment within the time provided in paragraph (e) or (l), respectively, and failed to request a time extension, there is no right of appeal.
(k) In arriving at the amount due the Contractor under this clause, there shall be deducted--
(1) All unliquidated advance or other payments to the Contractor under the terminated portion of this contract;
(2) Any claim which the Government has against the Contractor under this contract; and
(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the Contractor or sold under the provisions of this clause and not recovered by or credited to the Government.
(l) If the termination is partial, the Contractor may file a proposal with the Contracting Officer for an equitable adjustment of the price(s) of the continued portion of the contract. The Contracting Officer shall make any equitable adjustment agreed upon. Any proposal by the Contractor for an equitable adjustment under this clause shall be requested within 90 days from the effective date of termination unless extended in writing by the Contracting Officer.
(m) (1) The Government may, under the terms and conditions it prescribes, make partial payments and payments against costs incurred by the Contractor for the terminated portion of the contract, if the Contracting Officer believes the total of these payments will not exceed the amount to which the Contractor will be entitled.
(2) If the total payments exceed the amount finally determined to be due, the Contractor shall repay the excess to the Government upon demand, together with interest computed at the rate established by the Secretary of the Treasury under 50 U.S.C. App. 1215(b)(2). Interest shall be computed for the period from the date the excess payment is received by the Contractor to the date the excess is repaid. Interest shall not be charged on any excess payment due to a reduction in the Contractor's termination settlement proposal because of retention or other disposition of termination inventory until 10 days after the date of the retention or disposition, or a later date determined by the Contracting Officer because of the circumstances.
15B51525Q00000013 Page 12 of 38
(n) Unless otherwise provided in this contract or by statute, the Contractor shall maintain all records and documents relating to the terminated portion of this contract for 3 years after final settlement. This includes all books and other evidence bearing on the Contractor's costs and expenses under this contract. The Contractor shall make these records and documents available to the Government, at the Contractor's office, at all reasonable times, without any direct charge. If approved by the Contracting Officer, photographs, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.
(End of clause)
DOJ-01 Whistleblower Information Distribution (Oct 2021)
Within 30 days of contract award, the contractor and its subcontractors must distribute the “Whistleblower Information for Employees of DOJ Contractors, Subcontractors, Grantees, or Sub-Grantees or Personal Services Contractors” (“Whistleblower Information”) document to their employees performing work in support of the products and services delivered under this contract (https://oig.justice.gov/sites/default/files/2020-04/NDAA-brochure.pdf). By agreeing to the terms and conditions of this contract, the prime contractor acknowledges receipt of this requirement, in accordance with 41 U.S.C. § 4712 and FAR
3.906 & 52.203-17, and commits to distribution. Within 45 days of award, the contractor must provide confirmation to the contracting officer verifying that it has distributed the whistleblower information as required.
(End of Clause)
DOJ-02 Contractor Privacy Requirements (JAN 2022)
A. Limiting Access to Privacy Act and Other Sensitive Information
(1) Privacy Act Information
In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act information may be found at https://www.justice.gov/opcl/doj-systems-records.[1] Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.
(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment
Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.
(3) Prior Approval Required to Hire Subcontractors
The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
(4) Separation Checklist for Contractor Employees
15B51525Q00000013 Page 13 of 38
The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1) return of any Government-furnished equipment; (2) return or proper disposition of personally identifiable information (PII)[2], in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.
In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).
Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.
B. Privacy Training, Safeguarding, and Remediation
(1) Required Security and Privacy Training for Contractors
The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII. These courses, along with more information about DOJ security and training requirements for Contractors, are available at https://www.justice.gov/jmd/learndoj.
The Federal Information Security Modernization Act of 2014 (FISMA) requires all individuals accessing DOJ information to complete training on records management, cybersecurity awareness, and information system privacy awareness. Contractor employees are required to sign the “Privacy Rules of Behavior,” acknowledging and agreeing to abide by privacy law, policy, and certain privacy safeguards, prior to accessing DOJ information. These Rules of Behavior are made available to all new users of DOJ’s computer network and to trainees at the conclusion of DOJ-OPCL-CS-0005.
The Contractor should maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required privacy and cybersecurity training.
(2) Safeguarding PII Requirements
Contractor employees must comply with DOJ Order 0904 and other guidance published to the publicly-available Office of Privacy and Civil Liberties (OPCL) Resources page[3] relating to the safeguarding of PII, including the use of additional controls to safeguard sensitive PII (e.g., the encryption of sensitive PII). This requirement flows down from the Prime Contractor to all Subcontractors and lower tiered subcontracts.
(3) Non-Disclosure Agreement Requirement
Prior to commencing work, all Contractor personnel that may have access to PII or other sensitive information shall be required to sign a Non-Disclosure Agreement (NDA) and the DOJ IT Rules of Behavior. The Non-Disclosure Agreement:
(a) prohibits the Contractor from retaining or divulging any PII or other sensitive information, or derivatives therefrom, furnished by the Government or to which they may otherwise come in contact as a result of their performance of work under the contract/task order that is otherwise not publicly available, whether or not such information has been reduced to writing; and
15B51525Q00000013 Page 14 of 38
(b) requires the Contractor to report any loss of control, compromise, unauthorized disclosure, or unauthorized acquisition of PII or other sensitive information to the component-level or headquarters Security Operations Center within one (1) hour of discovery.
The Contractor should maintain signed copies of the NDA for all employees as a record of compliance. The Contractor should also provide copies of each employee’s signed NDA to the Contracting Officer before the employee may commence work under the contract/task order.
(4) Prohibition on Use of PII in Vendor Billing and Administrative Records
The Contractor’s invoicing, billing, and other financial or administrative records or databases is not authorized to regularly store or include any sensitive PII or other confidential government information that is created, obtained, or provided during the performance of the contract without the written permission of the Senior Component Official for Privacy (SCOP). It is acceptable to list the names, titles and contact information for the Contracting Officer, COR, or other personnel associated with the administration of the contract in the invoices as needed.
(5) Reporting Actual or Suspected Data Breach
Contractors must report any actual or suspected breach of PII within one hour of discovery.[4] A “breach” is an incident or occurrence that involves the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where: (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose.
The report of a breach must be made to DOJ. The Contractor must cooperate with DOJ’s inquiry into the incident and efforts to minimize risks to DOJ or individuals, including remediating any harm to potential victims.
(a) The Contractor must develop and maintain an internal process by which its employees and Subcontractors are trained to identify and report the breach, consistent with DOJ Instruction 0900.00.01[5], Reporting and Response Procedures for a Breach of Personally Identifiable Information.
(b) The Contractor must report any such breach by its employees or Subcontractors to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000); Component-level Security Operations Center and Component-level Management Team, where appropriate; the COR; and the Contracting Officer within one (1) hour of the initial discovery.
(c) The Contractor must provide a written report to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000) within 24 hours of discovery of the breach by its employees or Subcontractors. The report must contain the following information:
(i) Narrative or detailed description of the events surrounding the suspected loss or compromise of information.[6] Date, time, and location of the incident.
(ii) Amount, type, and sensitivity of information that may have been lost or compromised, accessed without authorization, etc.
(iii) Contractor’s assessment of the likelihood that the information was compromised or lost and the reasons behind the assessment.[7]
(iv) Names and classification of person(s) involved, including victim, Contractor employee/Subcontractor and any witnesses.
(v) Cause of the incident and whether the company’s security plan was followed and, if not, which specific provisions were not followed.[8]
(vi) Actions that have been or will be taken to minimize damage and/or mitigate further compromise.
(vii) Recommendations to prevent similar situations in the future, including whether the security plan needs to be modified in any way and whether additional training may be required.
(d) The Contractor shall provide full access and cooperation for all activities determined by the Government to be required to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents.
(e) At the Government’s discretion, Contractor employees or Subcontractor employees may be identified as no longer eligible to access PII or to work on that contract based on their actions related to the loss or compromise of PII.
15B51525Q00000013 Page 15 of 38
(6) Victim Remediation
At DOJ’s request, the Contractor is responsible for notifying victims and providing…