SOW WATER HEATER 5D2E.docx

DOCX document 28 KB Posted

Attached to
Water Heaters and Equipment Federal contract opportunity
Solicitation number
15B51320Q00000025
Issued by
Department of Justice Bureau of Prisons Federal Transfer Center Oklahoma City

View the file

Other files for this federal contract opportunity

Other files attached to Water Heaters and Equipment, newest first.
File Type Posted
5D2E SOW and Specs.pdf PDF
FTC OK Boilers 15B51320Q00000025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF JUSTICE

FEDERAL BUREAU OF PRISONS

STATEMENT OF WORK

PROJECT 5D2E

1st FLOOR

WATER HEATER REPLACEMENT

AT

FEDERAL TRANSFER CENTER

OKLAHOMA CITY, OKLAHOMA

SUMMARY of work All work described in these documents is to be executed in a thoroughly substantial and workmanlike manner.

DESCRIPTION:

The FBOP, FTC Oklahoma City, in Oklahoma City, OK, located at 7410 S. MacArthur Blvd Oklahoma City, OK 73169 seeks contract services for the following equipment.

(3) water heaters with bronze circulators, (1) 752 gallon tanks, (1) expansion tank, and standalone controls required for an operational system, factory startup / training of all new equipment supplied to make the replacement system.

New Equipment should be like / equivalent to the following –

(3) Lochinvar PFN 2001 NAT PM M9 Power-Fin natural gas Water Heater with 2,000,000 Btu/Hr input and recovery of 2109 GPH at 100°F rise. 87% thermal efficiency with "M" firing controls, Low NOx Operation.5:1 turndown, all bronze circulating pump,Smart System Control with sequencer controls up to 8 units ASME Copper Finned Tube Gasket-less Heat Exchanger rated for 160 PSI Working Pressure. ASME T&P Relief Valve, Adj. High Limit w/MR, Flow Switch., Pump Delay. 5 year limited warranty.

One trip for start-up/ owner training by factory trained HFI technician(s) for each water heater.

(3) ALL BRONZE CIRCULATORS.

(1)RGA0752 JACKETED AND INSULATED STORAGE TANK, 125 PSI, GLASS LINED, (2) 6” FLANGED B TAPPINGS. 125 PSI T&P RELIEF VALVE.PS/PU PIPING CONFIGURATION.
ALL PACKAGE PIPING TO BE 304L STAINLESS STEEL, SCH. 40.WYE STRAINER BEFORE EACH PUMP. ISOLATION VALVE BEFORE/AFTER EACH HEATER AND TANK.

(1) LTCPA100 EXPANSION TANK, ASME RATED. LOW VOLTAGE WIRING, TANK SENSOR WIRING, CASCADE WIRING. EQUIPMENT MOUNTED TO STEEL CHANNEL FRAME (NO WIDER THAN 5’, NO TALLER THAN 7’). LEAD TIME: 8-10 WEEKS

SINGLE POINT ELECTRICAL CONNECTION REQUIRED.

ANY WIFI CAPABILITY MUST BE REMOVED BY MANUFACTURER.

Due to Security Policy, equipment that is not matching will be subject to review for compliance with Department of Justice policies.

SUMMARY OF WORK & BUREAU PROCEDURES 01 11 00 - 1

Sensitive But Unclassified - SBU

File details come from the government source that posted it. Updated .