Sources_Sought.pdf

PDF 11 KB Posted

Attached to
FCI El Reno Water Utility Services Federal contract opportunity
Solicitation number
15B50718R00000001
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

FCI El Reno Water Utility Services - Sources Sought

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT. THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY -

Solicitations are not available at this time. Request for a solicitation will not receive a response. This notice does not constitute a commitment by the Government. The Federal Correctional Institution (FCI) in El Reno, Oklahoma has a future requirement for continuation of Water Utility services located in Canadian County, El Reno, Oklahoma. The FCI currently has an established metered connection for water utility service that is operational. The facility houses an inmate population and other generic institutional elements are present. The North American Industry Classification System Code (NAICS) is 221310 with a Small Business Size Standard of $27.5M. The contractor will provide water utility service on a daily basis 24 hours a day, 365 days a year. The contractor will be responsible for providing and coordinating all services required to deliver water utility service to the designated point of service and/or metered connection. Any resultant contract will have a performance period of with a minimum of one year and maximum of ten years in duration. The anticipated contract is a ten-year, requirements type contract with firm-fixed-prices. A government solicitation to provide these services is being developed and a contract may or may not result. Market research is being conducted to determine interest and capability of potential sources for this requirement. Please do not submit capability statements.

***Should this acquisition result in a contract, it will be for the continuation of an established utility service; as a result, there is no funding available for construction related services or capital improvements***. All information submitted in response to this announcement is voluntary; the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government.

Responses maybe submitted electronically to Darrell McKeel, Contacting Officer at dmckeel@bop.gov.

File details come from the government source that posted it.