RFI Questions 15B50526Q00000005.pdf
PDF 190 KB Posted
- Attached to
- Emergency Repair Oxygen Supply Lines - 23Z5AJ2
- Solicitation number
- 15B50526Q00000005
- Issued by
-
Department of Justice Bureau of Prisons
About this file
This document is a Solicitation for Emergency Repair Oxygen Supply Lines with Solicitation ID 15B50526Q00000005. The project involves installing a new master alarm panel on the fourth floor of a facility, with a secondary panel in the basement. Key details include: the 2" oxygen line is already installed and located in a chase, no digging is required, and there are no current oxygen feeds to the fourth floor. The project will involve replacing the existing monitor with a new master alarm system. Per NFPA 99 2024 requirements, four alarm connection points will be installed on both master alarm panels to monitor temporary oxygen supply. The solicitation clarifies that this is not a construction project, but a simple alarm system installation, and no extended outages will be necessary since no oxygen is currently being fed to the fourth floor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation ID: 15B50526Q00000005 Solicitation Title: Emergency Repair Oxygen Supply Lines - 23Z5AJ2
1. Can you confirm there is no concrete/asphalt as a part of the dig between the bulk Oxygen and the building? There is no digging required.
• Can you provide a utility drawing or underground for existing utilities that might be aƯected as part the dig for the new 2” Oxygen line? The 2” line is already installed.
• Can you confirm if we are “retrofitting” or “installing new” master alarm panels in the basement and 4th floor? New would require ICRA and T/B/P.
New Master Alarm Panel is to be installed. The main panel will be on the fourth floor.
• Are there other signals other than the Oxygen functions that are being ran to the master alarms? IE: Medical Air, Medical Vacuum, Nitrous Oxide, etc. No
• Per NFPA 99 2024 5.1.3.5.12.2 (8): “Four alarm connection points installed to both master alarm panels to allow the temporary supply to be monitored while in use.” This is not on the SOW, can you confirm this should be included to ensure the system meets NFPA? Yes, this should be included.
• Is the 2” Oxygen riser in a chase or closet? Is it accessible or will we have to set
ICRA barriers to open drywall for access? It’s in a chase.
• Can you provide ICRA plans?
This is not a construction project; it is simply installing a master alarm system. Taking the existing monitor out and installing a new one.
• Will we be required to provide backfeeds or will extended outages be scheduled?
There is currently no oxygen being fed to the fourth floor, there will be no outages to schedule.