Statement of Work - 24Z5AV6 Emergency Replace HVAC Indoor Rec.pdf
PDF 563 KB Posted
- Attached to
- 24Z5AV6 - EMERGENCY REPLACE HVAC INDOOR REC
- Solicitation number
- 15B50524Q00000011
- Issued by
-
Department of Justice Bureau of Prisons
About this file
This document is a Statement of Work for a federal contract opportunity to replace the HVAC system in the indoor recreation building at the Federal Medical Center (FMC) Carswell in Fort Worth, Texas.
The Statement of Work specifies that the contractor must provide and install two new 20-ton condensers and two new commercial 20-ton air handler units to replace the existing equipment. The new equipment must match or approximate the capacity of the existing equipment. The contractor is responsible for providing all necessary equipment, materials, and labor to complete the work. Installation will be performed by in-house FBOP HVAC staff. The contractor must provide a one-year warranty on all replacement equipment. The contract value is estimated to be between $100,000 and $250,000. The solicitation will be issued through the GSA's System for Award Management (SAM) website, and all interested contractors must be registered in SAM. The NAICS code for this requirement is 333415.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - 24Z5AV6.pdf | ||
| RFQ - 24Z5AV6..pdf | ||
| Statement of Work - 24Z5AV6 Emergency Replace HVAC Indoor Rec..pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FEDERAL MEDICAL CENTER (FMC) CARSWELL - B&F PROJECT
24Z5AV6-EMERGENCY REPLACE HVAC INDOOR REC
I. SPECIFICATIONS:
A. INTRODUCTION
A.1 The Federal Bureau of Prisons (FBOP), Federal Medical Center (FMC) Carswell, J Street – Bld. 3000, Ft. Worth, TX.
76127 provides medical treatment and mental health services for female offenders. FMC intends to make a single award to a responsible entity that will provide/supply all necessary equipment and materials to provide two (2) new 20-ton condensers with new air handler units. Refer to Section B to view previous requirements of existing equipment. New equipment location is in the Recreation Building 3006 on the institution grounds.
B. EXISTING EQUIPMENT SPECIFICATIONS
B.1 Existing Condenser Equipment Specifications:
New equipment shall match or approximate capacity of existing equipment.
Existing Two (2)Condensers:
Existing Trane Model: MCC17 sits on 70”x119” Concrete Slabs each at front exterior of the building.
Existing Condensers are Semi-hermetic, No. of Fans: 2 (H.P. each: 1.8) Electrical: 480/3 phase, Minimum Circuit Ampacity (M.C.A.): 56, Maximum Over Current Protection (M.O.C.P.): 80, Condenser F.L.A.: 1.8 Total Capacity (MBH): 280
B.2 Existing Air Handler Unit Specifications:
New equipment shall match or approximate capacity of existing equipment Existing Two (2) Air Handler Units Type: Vertical Draw Thru, Supply: 8000 CFM ea O/A CFM Min: 1855, O/A (CFM) Max:1855 Fan Data: Wheel Size 18.25, 1029 RPM, 1.5 E.S.P. (IN. WG.)
Fan Motor Data: 7.5 H.P., 184T frame size, 480 volts, 3 phase, 1750 RPM Indoor Cooling Coil: 8000 CFM, 500 Max. Vel. (F.P.M.)
Ent. Air Temp: 81.2F D.B., 66.8F W.B.
Lvg Air Temp: 56.9F D.B., 56.1F W.B.
Cooling Coil Capacity: 273.6MBH Total Gross, 210.0MBH Sens., Refrig. Liq. Temp.: 115, Refrig. Suction Temp.: 45, Min Rows 4, Max 9.4 F.P.I
C. SCOPE OF WORK
C.1 Supply two (2) new 20-ton Condensers. Condenser shall be air split systems, 240,000 BTUH, Three phase, 460 v/60
hz. Air flow shall be 12000 cfm. Min circuit amperage 48A. Transformer shall be supplied with 75 VA step-down type, from Line to 24 volts with resettable circuit breaker.
C.2 Condenser Coils shall be constructed with copper or aluminum tubes and aluminum fins mechanically bonded to the tubes for maximum heat transfer capabilities. All coil assemblies shall be leak tested up to 550 PSIG (3792 kPa) internal pressure.
C.3 The condenser external cabinet shall be composed of heavy gauge case or galvanized steel with a durable powder paint finish. The scroll compressor shall be hermetically sealed with internal overload protection and durable insulation on motors windings. Drain pan shall be galvanized steel and designed to trap condensate in either vertical or horizontal installations. For service access, there should be removable panels for access to motors, blowers, sheaves, and filters.
C.4 Condenser fan motors shall be equipped with molded plugs for easy removal. System shall have design for louver panels and end access panels for removal for coil cleaning as needed.
C.5 System will have high pressure control & auto reset low pressure control and will provide compressor protection under abnormally high head pressure conditions such as outdoor fan failure, restriction, dirty coil, etc. or abnormally low suction pressure conditions such as restrictions, TEV failure, loss of charge, indoor blower failure, etc. while eliminating nuisance tripping sometimes experienced with conventional control systems.
C.6 The standard filter drier shall be provided/supplied to help ensure refrigerant cleanliness. Installation will be completed by in-house FBOP HVAC Staff.
C.7 Refrigerant for condensers and air handlers: 410A. New units shall be shipped with full refrigerant charge.
C.8 Supply two (2) commercial 20-ton Air Handlers to match new condensers. 460v/60 hz, 3 phase.
C.9 Condenser to be shipped complete from the factory ready for field installation and use.
C.10 One year worth of filters for the new systems shall be supplied.
C.11 Factory Start-up shall be provided after installation. All units shall be run tested at the factory prior to shipment.
D. QUALITY
All receiving/discharge/shipping will be to the FMC. All shipping scheduling will be communicated to the FBOP.
The contractor shall verify all existing quantities, measurements & conditions with the FBOP prior to ordering materials.
The contractor has sole responsibility and discretion for choosing and implementing the manner and method of performing the tasks outlined in this Statement of Work as long as they do not impede or violate any Local, State, or Federal regulatory policies and/or laws and are carried out in a way to best minimize disruption of institution operations.
E. WARRANTY
The Contractor shall provide a warranty, signed by an authorized representative of the company. The warranty must validate replacement of defective materials up to one (1) year at no additional cost to the FBOP. Warranty period shall commence upon notification of final acceptance.