This Statement of Work details requirements for rebuilding a Marley NC Series cooling tower at the Federal Bureau of Prisons (FBOP) Federal Correctional Complex in Beaumont, TX. The project involves replacing equipment at a cooling tower located outside the perimeter fence of the FCI LOW facility at 6200 Knauth Road.

The contractor must remove existing equipment and install new components including: Cross Flow Fill Media with Integral Air Inlet Louvers and Integral Drift Eliminators, Marley 2200 series gear box (4.56:1 ratio), 60HP motor (460V, 1800RPM), ABB ACH580-VDR-077A-4 variable frequency drive, fiberglass fan shroud, galvanized fan screen, and Marley Short Stem Target Nozzles. Work must be performed between 7:00 AM - 3:00 PM Monday-Friday, excluding federal holidays. The contractor must undergo NCIC background checks, follow strict security protocols including tool control procedures, and cannot interact with inmates. The facility houses 4,146 inmates across minimum to high security levels. All equipment must be new (no refurbished items) and approved prior to ordering. The contractor must provide warranties, operating manuals, and remove all construction debris from the site.

View the file

Other files

File Type Posted
15B50225Q00000040 Site Visit.pdf PDF
RFQ 15B50225Q00000040.pdf PDF
Criminal History Check Forms - Blank.pdf PDF
RFQ 15B50225Q00000040.pdf PDF
Instructions to Offerors - Low Cooling Towers.doc DOC document
Wage Determination 15-5217.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .