JOFOC Kirwan.pdf
PDF 542 KB Posted
- Attached to
- Kirwan BAS Equipment Service
- Solicitation number
- 15B40125P00000032
- Issued by
-
Department of Justice Bureau of Prisons
About this file
This document is a Justification for Other than Full and Open Competition (JOFOC) for the renewal of a building automation system (BAS) maintenance and testing service contract for the Bureau of Prisons' Metropolitan Correctional Center in Chicago, Illinois.
The JOFOC states that the incumbent contractor, Kirwan Mechanical, is the original designer of the BAS system and the only authorized provider for maintenance and testing services. Procurement through full and open competition is not feasible, as service by any other company would void all warranties. The estimated value of the renewal is $26,760. The contracting officer has determined this price to be fair and reasonable. Due to the urgent need to ensure the life safety of staff and inmates, the government is justified in foregoing full and open competition under the "unusual and compelling urgency" exception. The contract was awarded to Kirwan Mechanical through a sole source justification on October 7, 2024 under Solicitation Number 15B40125P00000032.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice Federal Bureau of Prisons
Metropolitan Correctional Center 71 West Van Buren Chicago, Illinois 60605
Facilities October 24,2024
MEMORANDUM FOR MICHAEL STEINER, SUPERVISORY CONTRACT SPECIALIST
FROM: Michael Murray, Facility Manager
SUBJECT: Justification for Other than Full and Open Competition
Pursuant to FAR 6.303-2, the following is provided in support for this action for other than full and open competition:
1. Identification of the agency: Bureau of Prisons, Metropolitan Correctional Center, 71 West Van Buren St., Chicago, IL. Justification for unusual and compelling urgency. FAR 6.303-2.
2. Nature of the action being approved: Seeking authority for the renewal of the building automation system maintenance and testing service for the institution from Kirwan Mechanical.
3. Description of the supplies/services required: The price is estimated at approximately $26,760.00.
4. The authority permitting other than full and open competition: The statutory authority permitting other than full and open competition is 41 U.S.C. 3304(a)(1) per FAR 6.302-1(a)(2) - Only one responsible source and no other supplies or services will satisfy agency requirements. FAR 6.302-1, only one responsible source.
5. Demonstrate proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited: Kirwan Mechanical is the system designer and is the only company authorized to service the equipment. Service by any other company would void all warranties expressed or implied.
6. Exception FAR 5.202.2: Unusual and compelling urgency to ensure the life safety of staff and inmates in the institution precluded competition and the government would be seriously injured if we complied with the time periods specified in FAR 5.203.
7. Fair and reasonable: The contracting officer has made a determination that $26,760.00 for the institutions building automation system maintenance and testing service from Kirwan Mechanical is a fair and reasonable price.
8. Market research: Not applicable.
9. Facts: Not applicable.
10. List of other sources: Not applicable.
11. A statement of the actions: Not applicable.
12. Contracting Officer Certification: I hereby certify that this request for approval of other than full and open competition is made in good faith. The supporting data and information are accurate and complete to the best of my knowledge and belief. I would not be making this request if it were feasible to fully compete this unique requirement. I further certify this request is not the result of lack of advance planning or a desire to expend funds while said funds are still available.
Cost Center Manager Date
1. The anticipated cost to the government is determined to be fair and reasonable.
2. This Justification is accurate and complete to the best of my knowledge.
Michael Steiner, SCS Date
In accordance with BPAP Part 6.304(a) approval at the next highest level is not required.
Michael Steiner, SCS
10/01/2024
10/1/2024