Questions Sallyport.docx

DOCX document 13 KB Posted

Attached to
ROLL OVERHEAD DOOR REPLACEMENT Federal contract opportunity
Solicitation number
15B40124Q00000004
Issued by
Department of Justice Bureau of Prisons

About this file

This solicitation requests quotes for the installation of a replacement overhead door system at the Metropolitan Correctional Center in Chicago, Illinois. The Department of Justice Bureau of Prisons requires the removal of an existing 16' x 16' steel overhead door and installation of a new steel slat door system with motor operator, photoelectric sensors, safety edges, interior controls, and cylinder locks on both jambs. Quotes are due by February 15, 2024 through the System for Award Management website. Offerors must be registered in SAM and provide any required non-pricing documents to the contracting officers by the closing date. A non-mandatory site visit is scheduled for February 5, 2024 and background checks are required for attendance.

View the file

Other files for this federal contract opportunity

Other files attached to ROLL OVERHEAD DOOR REPLACEMENT, newest first.
File Type Posted
15B40124Q00000004 FY24 PZ 23Z4AS6 SALLY 1 OVERHEAD DOOR FEB 24.pdf PDF
7 - SOW - SALLY 1 REPLACEMENT-2.pdf PDF
Solicitation Notice 23Z4AS6.docx DOCX document
NCIC CHECK.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15B40124Q00000004 FY24 PZ 23Z4AS6 SALLY 1 OVERHEAD DOOR QUESTIONS

Q1. I see no mention of Disposal of removed door,

- is that an assumption we are to dispose of the door?

- Will the facility dispose of the removed door?

Contractor to dispose of all old door parts.

Q2. Are there any electrical connections required?

- Will the facility perform the electrical connections?

- Is it the contractor's responsibility to perform all electrical connections?

Contractor is responsible for all electrical connections, page 1 and 2 of SOW.

Q3. Since the install is required in 1 day or days are the best for installation?

The day with minimal interruption would be Saturday.